ML20235E972

From kanterella
Jump to navigation Jump to search

Documents Util 870630 Meeting W/Nrc Re Areas of Concern from Safety Sys Functional Insp.Areas Included Ac & Dc Voltage Studies/Sufficiency,Seismic Concerns,Ventilation/Temp & Svc Water Sys Flow.Completed Actions Requested by 870724
ML20235E972
Person / Time
Site: Cooper 
Issue date: 07/02/1987
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
TAC-66723, NUDOCS 8707130154
Download: ML20235E972 (5)


Text

'

e JUL 2 - 1987 In Reply Refer To:

Docket:

50-298 Nebraska Public Power District ATTN:

George A. Trevors Division Manager - Huclear Support P. O. Box 499 Columbus, NE 68601 Gentlemen:

This documents the meeting held between members of our staffs on June 30, 1987. The meeting allowed you to outline various actions, which you have either underway or planned, to address concerns arising from the Safety System Functional Inspection.

The areas of concern addressed at this meeting were:

l AC voltage studies / sufficiency l

DC voltage studies / sufficiency l

Seismic concerns l

Ventilation / temperature problems i

I Service water system flow We understand that you will document your completed actions and future plans regarding these concerns on or before July 24, 1987.

Sincerely, sicinal cisned te M. E. H AL L" l

)J E. H. Johnson, Director Y

Division of Reactor 4

Safety and Projects

Enclosures:

1.

List of attendees l

2.

Copy of slides l

cc w/ enclosures:

Guy Horn, Division Manager of Nuclear Operations 8707130154 870702 i

Cooper Nuclear Station PDR ADOCK 050 8

l P. O. Box 98 G

l Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director l

I Lcc (see next page) j

\\

C:RPB/A M /g C:RPB RSP p7/ l /87

[7/J-/87 EGagliardo EHJohnson

(

l JPJaudon:cs i

i 7/g/87 l

L

Nebraska Public Power District bcctoDMB(IE45) bec [d'strib. by RIV:

RPB DRSP RRI R. D. Martin, RA i

Section Chief (RPB/A)

D. Weiss, RM/ALF RPSB RSB MIS System Project Inspector, RPB RIV File R. Hall RSTS Operator W. Long, NRR Project Manager J. Dyer, NRR t

1 I

i JUNE 30, 1987, MEETING:

NRC & NPPD NRC Attendees Name Title E. H. Johnson Director, Division of Reactor Safety and Projects R. E. Hall Deputy Director, Division of Reactor Safety and Projects T. F. Westerman Chief, Reactor Safety Branch J. P. Jaudon Chief, Project Section A, Reactor Projects Branch W. R. Bennett Project Inspector, Project Section A W. O. Long Project Manager, NRR J. E. Dyer Senior Operations Engineer, NRR Other Attendee S. F. Kobycarz Inspector, Westec Services, Inc.

Licensee Attendees H. G. Parris Assistant to the President G. A. Trevors Division Manager, Nuclear Support G. R. Horn Division Manager, Nuclear Operations R. E. Wilbur Division Manager, NE&C J. M. Pilant Manager, Configuration Management A. P. Heymer Configuration Management Supervisor W. C. Fischer Electrical Supervisor

l FOR EACH AREA 0F CONCERN:

10iAT Is PLANNED?

l WHEN WILL IT BE ACCOMPLISHED?

HOW WILL IT BE DOCUMENTED?

1 l

l I

AREAS OF CONCERN AC VOLTAGE STUDIES / SUFFICIENCY DC VOLTAGE STUDIES / SUFFICIENCY SEISMIC CONCERNS VENTILATION / TEMPERATURE BATTERY Roms SWITCHGEAR rooms DIESEL GENERATOR rooms SERVICE WATER SYSTEM FLOW 3