Notice of Violation from Insp on 870705-0904.Violation Noted:Failure to Follow Procedures Re Use of hot-dipped Galvanized Nuts
ML20235D328
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/22/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20235D290 List:
References
50-498-87-48, 50-499-87-48, NUDOCS 8709250194
Download: ML20235D328 (2)


Text

y ,

APPENDIX A NOTICE OF VIOLATION Houston Lighting & Power Company Dockets: 50-498 South Texas Project, Units 1 & 2 50-499 Construction Pemits: CPPR-128 CPPR-129 During an NRC inspection conducted July 5 through September 4,1987, a violation of NRC requirements was identified. The violation involved a failure to follow procedures. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:

Failure to Follow Procedure Criterion V of Appendix B to 10 CFR Part 50 requires that activities affecting quality be prescribed by and accomplished in accordance with appropriate instructions, procedures, or drawings. This requirement is amplified by the approved Quality Assu:.ance Program Description (QAPD) of South Texas Project (STP).

Standard Site Procedure (SSP) 38, Revision 1, paragraph 5.9, references Specification SV279VS1003, Revision 7 " Installation of Safety and Non-safety HVAC Equipment and Ductwork." Paragraph 3.12 of this specification states, " Bolts and nuts for galvanized ductwork shall be hot-dipped galvanized, cadmium-plated, or electromagnetic zinc-coated.

Hot-dipped galvanized nuts shall only be used with hot-dipped galvanized bolts. Cadmium-plated, and electromagnetic zinc-coated nuts may be used with either cadmium-plated or electromagnetic zinc-coated bolts."

Contrary to the above, hot-dipped galvanized nuts were used with electromagnetic zinc-coated bolts, and hot-dipped galvanized bolts were used with electromagnetic zinc-coated nuts.

This is a Severity Level IV violation. (SupplementII)(499/8748-01)

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Company is hereby required to submit a written statement or explanation to this Office within 30 days of the date of the letter transmitting this Notice. This reply, should include for each violation: (1) the reason for the violation if admitted, 8709250194 870922 PDR ADOCK 05000498 G PDR

1 s.

2 (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause.is shown, consideration will be given to extending the response time.

Dated at Arlington, Texas this 2.2114 7

day offgnt/41 1987.