_ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _
l
'
'
SEP 2 21987
)
In Reply Refer To:
Dockets: 50-498/87-48
50-499/87-48
j
Houston Lighting & Power Company
l
ATTN:
J. H. Goldberg, Group Vice President
l
Nuclear
l
I
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. C. E. Johnson and
D. L. Garrison of this office during the period July 5 through September 4,
1987, of activities authorized by NRC Construction Permits CPPR-128 and CPPR-129,
for the South (exas Project, Units 1 and 2, and to the discussion of our findings
with tir. J. Westermeier and other members of your staff at the con:lusion of
the inspection,
l
Areas examined during the inspection included:
site tours; follow;p on 10 CFR
l
i
Part 21 reports; post-tensioning system; reactor vessel and inter'ials
(records); structural concrete (records); and heating, ventilating, and air
conditioning.
Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviewc with
personnel, and observations by the NRC inspectors. The inspectian findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
)
by th,e Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Drtgnd stanad By
2
3. E. Gagliardo
8709250183 070
ADOCK 050 p
G
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
RIV:S k
RPB/$$/
RPB/
C:RPB
C:RPBf
,
CEJohnson/lr
DLGarrison RGTa or GLCons
e JEGaglu o
1////87
~1//187
q/Ji/87 q/p;/87
f/2l
3
_
- - - - -
- - -
1
_-_ _
l
f
9'
.
[
L
l'
'
Houston Lighting & Power Company
-2-
.
l
l
Enclosures:
1.-
Appendix A - Notice of Violation
l
2.
Appendix B~- NRC Inspection Report
'
50-498/87-48
50-499/87-48
l
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Houston Lighting & Power Company
ATTN:
Gerald E. Vaughn, Vice President
Nuclear Operations
P. O. Box 1700
Houston, Texas
77001
Texas Radiation' Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI-OPS
R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
RPSB
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, 0GC
- R. G. Taylor, RPB/C
- RSB
- Project Inspector, RPB
- R. Hall
- P. Kadambi, NRR Project Manager
- w/766
i