,f7CIE Southem Califomla Edison Company P. O, BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD. CAllFORNIA 91770 MANAGER OF NU LE. AR ENGINEERING (8
) 02 7 9 AND LICENSING July 2, 1987 10 CFR 50.54 (f)
U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Hashington, D.C.
20555 Gentlemen:
Subject:
Docket _No. 50-206 Generic Letter 87-06 Response San Onofre Nuclear Generating Station Unit 1
.The referenced Generic Letter 87-06 dated March 13, 1987 requested SCE to provide information pertaining to leak-tight integrity of all Reactor Coolant System (RCS) pressure isolation valves.
The purpose of this letter is to provide SCE's response for San Onofre Unit 1.
Accordingly, provided in an enclosure to this letter is a list of all pressure isolation valves at San Onofre Unit 1.
For each valve, the list describes the periodic tests or other measures performed to assure valve integrity, any operational limits and testing frequency.
The enclosed list does not include valves on lines 3/8" diameter or less, since makeup for line breaks of this size can be provided by the normal charging system. Additionally, manual RCS drain and vent valves'have been excluded from the list, since these valves are normally closed and are exempt from Inservice Testing (IST) Program testing per ASME Code Sr-tion XI Article IHV-1200.
Those RCS pressure isolation valves identified in the enclosed list that are not currently included in the IST program will be evaluated for inclusion.
It should be noted that all reactor coolant leakage is monitored per Technical Specification 3.1.4, Leakage, which applies to all systems connected to the RCS.
This specification requires the RCS to be monitored for evidence of leakage and limits total leakage to 1 gpm for unidentified and 6 gpm for identified provided that in the latter case an evaluation demonstrates that continued operation is safe.
1 0
8707060600 870702 PDR-ADOCK 05000206 3
P PDR L
.. 1
p-Document Control Desk July 2,1987 If you have any questions regarding this information; please let me Subscribed on this d'# day of b
, 1987.
/ 9' Respectfully submitted, SOUTHERN CALIFORNIA EDIS0N COMPANY By: N [ h D' ' I M. O. Medford Manager of Nu lear Engineering and Licensing Subscribed and sworn tp, before me this d
day of udn /7/'7
/ f' A
RAB EE u,
N6tpfy Public in and for the County of foNr[cUcIN$$$$*y i
Los Angeles, State of California j
%mm. Esp. Gop. u.1990 My Commission Expires:
/'/ /f ro
\\
r Enclosure cc:
R. F. Dudley, NRR Project Manager, San Onofre Unit 1 J. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 l
l m
l
- Pete Eo.
1 06/22/07 GEXERIC LITTER 87-06 t!SP0XSI 1
- AtRI SYSTER TESTIXG 02 TESTIXG ACCEPTANCE I.D.50.
OTHER EIASURES TRIQUEICT Ct!TIRIA/
OPERATICIAL LIE!TS CV-304 CHARGIRG 150L IST PROGRAM, IULL STROKE IIEtCISI TEST (BT), TAIL ST & FST-COLD VALVI EUST PIRT0tn SAf!TIST(f!T).POSITIONINDICATIONCEECK(Plf)
SH TD0VN, BUT EDT ITS RIQUIRED SAFITY E0RI OffEK TEAK ONCE fHCCON EVElf 90 DATS, FIT-EViti REFUIllfG 01 2 ft$.
CV-305 CHARGIBG ISOL SEECV-304 SIE CV-304 SIECV-304 ICP-337 CHARGING 150L IST PROGRAM, CHICK VALVE !!ERCISI TEST (CVT)
CVT-COLD SHUTD0VI, VALVI EUST PIRT0tH BUT NOT E0RE OFTEN ITS REQUltID SAFEff TEAR CNCE IVEtf 90 TUNCTION DAf5 IV-802 CHARGING ISOL IST PROGRAM, t! LIEF VALVI SITPOINT CEICK (177)
RVI-AT LIAST ONCE VALVE EUST PIRFORH IVilf 5 ftS ITS 1EQUIRED SAf!TT TURCTION VCC-002 chi!GING ISOL IST PROGRAM, CHICL VALVI IIERCISE TEST (CVT)
CVI-COLD SEUTD0VN, VALVE EDST PIlr01E EUT NOT E0t! 0FTEX ITS REQUIRED SAfiff THAX ONCE IVit! 90 FUNCTIDX BATS VCC-003 CHARGIIG ISOL SII VCC-002 SEE VCC-002 SEE VCC-002 VCC-305 CEARGIEG ISOL ISTP10GRAH,CHICKYALVIIIEtCISETEST(CVT)
CVT-IVElf 3 EDITHS VALVI EDST PIRF015 ITS REQUllID SAFEff FUNCTION i
VCC-306 CEARGING ISCL SEE VCC-305 SIE VCC-305 SEE VCC-305 50V-356 CEARGIEG JSOL IST FIDGRAM, TULL STR0KI IIEtC'SE TEST (BT),
BT-COLD SEUTD0GX, VALVE EUST FIRT0tH SIS POSITION INDICATI0X CEICI (PIT)
IUT EDT E0!! OTTIK ITS RIQUIIID SAFITY TEAN CECI IVElf 90 TUCITIOR EATS, PIT-EVItf IEFUELING 02 2 ft$.
E0V-357 CEARGING ISOL SEE E0V-356 SEI E0V-356 SEI E0V-356 SIS EDV-358 CEARGING ISOL SEE E0V-356 SII E0V-356 SIE E0V-356 SIS CV-202 LITD0VK ISOL IST PROGRAH, FULL STROK! IIIRCISE TEST (ET), TAIL BT-EVElf 3 E0KTHS, VALVI EUST PIITCin SAFE TEST (TST), P0517105 INDICATION CHICL (PIT) IST-COLD SEUTDCE!,
ITS REQUIRED SATITT IUT NOT M0t! CFTEX TUNCTION TEAR CICE EVElf 90 EAYS, PIT-EVEtf REFUELING 01 2 ftS.
Page No.
2 96122167 GENERIC LETTER 87-06 RESTONSI VALVE SYSTER TESTING OR TESTING ACCEPTANCI I.9. NO.
OTHER HEASURES FREQUINCY CRITERIA /
CP! RATIONAL J
LIMITS CU-203 LITD0VN ISOL SEE CV-202 SEE CV-202 SIE CV-202 CV-204 LETD0VN ISOL SEECV-202 SEE CV-202 SEE CV-202 LCV-ll D LETD0VN ISOL NONE. THIS VALVI VILL BE EVALUATID FOR POSSIBLE INCLUSION INTO THE IST PROGRAH G-261 LETD',J.1 SOL NONE, THIS VALVI VILL BE IVALUATED FOR POSSIBLE
!! CESS INCLUSION INTO THE IST PROGRAM.
BCV-lll? LETD0VN ISOL NONE, THIS VALVI VILL BE EVALUATID FOR POSSIBLE IICESS INCLUSI0h INTO THE IST PROGRAB CV-530 PR: ISOL BLOCK TECH. SPEC. 3.1.5 & 4.1.6 APPLIES BT-EVERT 3 MONTHS, VALVI HUST PERFORB IST PROGRAM, FULL STR0KE IIERCISE TEST (BT), FAIL PST-COLD SHUTD0VN, ITSREQUIREDSAFEff SAFE TEST (FST), POSITION INDICATION CHECK (PIT) BUT NOT HORE OFTEN FUNCTION THAN ONCE EVERT 90 DATS, PIT-IVERT REFUELING OR 2 TRS.
CV-531 FR2 ISOL BLOCK SEE CV-530 SEE CV-530 SEE CV-530 CV-545 PR2 ISOL PORY TECH SPIC 3.1.5 & 4.1.6 APPLIES BT & FST-COLD VALVE HUST PERFORM IST PROGRAM, FULL ST0EE EICERCISE TEST (BT), FAIL SHUTD0VN, BUT NOT ITSREQUIRIDSAFETT SAFE TEST (FST) POSITION INDICATION CHECK (PIT) HORE OFTEN THAN ONCE FUNCTION j
EVERf 90 DAYS, PIT-ETERY REFUELING OR 2 IRS.
CV-546 PR2 ISOL PORV SEE CV-545 SEI CV-545 SEE CV-545 RV-532 PRI ISOL RELIIF IST PROGRA!; RELIEF VALVE SETPOINT CHICK (RVT),
RVT & PIT-EVERf VALVI HUST PERFORM POSITION INDICATION CHECK (PIT)
ITSREQUIREDSAFITY FUNCTION RV-533 PR2 ISOL RELIEF SEE RV-532 SIE RV-532 SEE RY-532 CV-276 RCP SEAL INJ IST PROGRAM, FULL STR0KE IIERCISE TIST (BT), FAIL BT & FST-IOLD VALVE HUST PIRFORH ISOL SAFE TEST (FST), POSITION INDICATION CHICK (PIT)
SHUTD0VN, BUT NOT ITS REQUIRED SAFETT HORE OFTEN THAN CNCE FUNCTION IVERT 90 DATS, PIT-EVERT REFUELING OR 2 IRS FCV-lll5A RCP SEAL INJ IST PROGRAM, PARTIAL IIERCISI TEST (BTP), FULL BTP-IVERT 3 MONTES, VALVE HUST PERFORM 150L STR0KE EIERCISE TEST (BT), FAIL SAFE TEST (FST)
BT & FST-COLD ITS REQUIRED SAFEff SliUID0VN, EUT NOT FUNCTION HORE OFTEN THAN CNCE IVERT 90 DafS
1 PsNe No.
3 06/22/81 GENERIC LETTER 87-06
RESPONSE
j VALVE SYSTEM TESTING OR TISTING ACCEPTANCE I.h. NO.
OTHER REASURES FREQUENCY CRITERIA /
OPERATIONAL LIEITS FCV-Ill5B RCP SEAL INJ SEE FCV-Ill5A SEE FCV-Ill5A SEE FCV-Ill5A ISOL FCV-lll5C RCP SEAL INJ SEE FCV-Ill5A SEE FCV-1115A SEE FCV-1115A ISOL FCV-1115D RCP SEAL INJ IST PROGRAH, FULL STROIE EIIRCISE TEST (BT), FAIL BT & FST-COLD VALVE EUST PERFORE ISOL SAFE TEST (FST)
SEUTD0VN, BUT NOT ITSREQUIRIDSAFETT HORE OFTEN THAN ONCE FUNCTICX EVERY 90 DATS FCV-lll5E RCP SEAL INJ SEE FCV-lll5D SEE FCV-Ill5D SEE FCV-Ill5D ISOL FCV-Ill5FRCPSEALINJ SEE FCV-Ill5D SEEFCV-Ill5D SEE FCV-Ill5D ISOL PCV-lll5A RCP SEAL INJ IST PROGRAE, TULL STROIE IIERCISE TEST (BT), FAIL BT & FST-COLD VALVE EUST PERFORH ISOL SAFE TEST (FST), POSITION INDICATION CHECK (pit)
SHUTD0VN, BUT NOT ITS REQUIRED SAFEff 20RE OFTEX THAN ONCE FUNCTION EVERT 90 DAYS, PIT-EVERT REFUILING OR 2 TRS.
PCV-Ill5B RCP SEAL INJ SEE PCV-Ill5A SEEPCV-Ill5A SEEPCV-lll5A ISOL PCV-lll5C RCP SEAL INJ SEE PCV-Ill5A SEEPCV-Ill5A SEE PCV-lll5A ISOL ICP-005 RCP SEAL INJ IST PROGRAM, CHECK VALVE EIERCISE TEST (CVT)
CVT-COLD SHUTD0VN, VALVI EUST PERFOR5 ISOL BUT NOT HORE OFTEN ITS REQUIRED SAFEff THAN ONCE EVERY 90 FUNCTICX DAYS ICP-006 RCP SEAL INJ SEE RCP-005 SEE RtP-005 SEE RCP-005 ISOL RCP-104 RCP SEAL INJ SEE RCP-005 SEE RCP-005 SEE RCP-005 ISOL CV-951 RCS SAMPLE ISOL TECH SPEC 3.6.2 & 4.3.2 APPLIES AT-EVERT REFUELING OR fALVE EUST PERFCRE IST PROGRAM, SEAL LEAK TEST (AT). FULL STROIE 2 TRS., BT-EVERT 3 ITS REQUIRED SAFETT IIERCISI TEST (LT), FAIL SAFI TEST (FST)
M0XTHS, FST-COLD FUNCTION, VALVE SHUTD0VN, BUT NOT LEAKAGE LIEITED TO E0RE OFTER THAN CNCE 10CFR50 APPINDII J, IVElf 90 DATS TfPI C CRITERIA
T fege No.
4 06/22/87 GENE!!C LETTIt 87-06
RESPONSE
VALVE SYSTER TESTING 01 TESTING ACCEPTANCE I.D. NO.
OTlitt EIASURES-FREQUINCT CRITERIA /
OPERATIONAL LIMITS CV-953 ACS SARPLE !$0L SEE CV-951 SEE CV-951 SEE CV-951 CV-955 1CS SAEPLE ISOL $2E CV-951 SEE CV-951 SEE CV-951 CV-956 RCS SAMPLE ISOL SEE CV-951 SEE CV-951 SEE CV-951 (V-957 RCS SABPLE ISOL TECH SPEC 3.6.2 & 4.3.2 APPLIES AT & PIT-!YElf VALVE EUST PERFORM IST PROGRAH, SEAT LEAL TEST (AT), FULL STROKE REFUELING 01 2 TRS., ITS REQUIRED SAFETT EIERCISE TEST (BT), FAIL SAFE TEST (FST), POSITION BT AND FST-IVElf 3 FUNCTION, VALVE INDICATICXCHEC1(PIT)
HONTHS LEAIAGE LIMITED 70 10CFt50 APPEND!! J.
TYPE C CRITERIA CV-962 RCS SAMPLE ISOL SEE CV-951 SEE CV-951 SEE CV-951 CV-992 RCS SAMPLE ISOL SEE CV-951 SEE CV-957 SEE CV-957 SV-3302 RCS SAMPLE ISOL TECH SPEC 3.6.2 & 4.3.2 APPLIES AT-IVERT REFUILING VALVE BUST PERFORE IST PROGRAM, SEAT LIAL TEST (AT), TULL STROLE OR 2 TRS., BT &
ITS REQUIRED SAFEff IIEICISE TEST (BT), FAIL SAFI TEST (FST)
FST-EVERT 3 EONTHS FUNCTION,VALVI LEAKAGE LIEITED TO 10CFR50 APPENDI! J, TYPE C CRIT!!!A SV-2403 RCS VENT ISOL TECH SPEC 3.1.7 & 4.1.12 APPLIES BT & FST-COLD VALVE EUST PERF0tn PRZ IST PROGRA5, FAIL SAFE TEST (FST), FULL STROKE SHUTD0VI, BUT NOT ITS REQUIRED SAFETT IIERCISE TEST (BT), POSITION INDICATION CHECK HORE OFTEX THAN ONCE FUNCTION (PIT)
EVElf 90 DAYS, FIT-EVERf REFUELING OR 2 TRS.
i SV-2404 RCS VENT ISOL SEE SV-2403 SEE SV-2403 SEE SV-240)
PRI SV-3403 RCS VENT ISOL SEE SV-2403 SEE SV-2403 SEE SV-2403 FRZ SV-3404 RCS VENT ISOL SEE 57-2403 SEE SV-2403 SEE SV-2403 P12 SV-2401 RCS VENT ISOL TECH SPEC 3.1.7 & 4.1.12 APPLIIS ET & FST-COLD VALVE MUST PERF0tH IIACT IST PROGRAM, TULL STR0KE IIERCISI TEST (BT), FAIL SHUTD0VN NOT ITS REQUIRED SATITY SATE TEST (FST), POSITION INDICATION CHECK (PIT)
IICEEDING ONCE EVElf FUliCTION 90 DAYS, PIT-IVIli REFUELING OR 2 T15.
SV-2402 RCS VENT ISOL SEE SV-2401 SEE SV-2401 SEE SV-2401 REACT
l Page No.
5 06/22/87 GENERIC LETTER 87-06
RESPONSE
VALVE SYSTEE TESTING 01 TESTING ACCEPTANCE I.D. 50.
OTHER EEASURES FREQUEXCT CRITERIA /
OPERATIONAL LIEITS SV-3401 BCS VENT ISOL SEE SV-2401 SEE SV-2401 SEE SV-2401 t!ACT SV-3402 tCS VENT IE0L SEE SV-2401 SEE SV-2401 SEE SV-2401
-REACT E0V-813 RHR ISOL IST PROGRAE, FULL STR0KE EIERCISE TEST (BT).
BT-COLD SHUTD0VN, VALVE EUST PERFORE POSITIONINDICATI0KCHICK(PIT).
BUT NOT E0RE OFIEN ITS REQUIRED SAFETT OVERPRESSURIZATION PROTICTICX PROVIDED BT 17-206. THAN ONCE EVElf 90 FCICTION DATS, PIT-EVERT REFUELING Ct 2 ftS.
50V-814 121 ISOL SEE EDV-813 SEE EDV-813 SEE E0V-813 50V-833 IHR ISOL SEE E0V-813 SEE E0V-813 SEE E0V-813 50V-834 RER ISOL SEE E0V-813 SEE E0V-813 SEE E0V-813 tv-206 IHR ISOL IST PROGRAE, RELIEF VALVE SETPOIXT CHICK (RVT)
RVT-AT LEAST ONCE VALVE EUST PERFORE IVElf 5 ftS.
ITSREQUIt!DSAFETT FUNCTION B0V-850A SIS ISOL IST PROGRAM. TULL STR0KE EIERCISE TEST (BT),
BT-EVERT COLD VALVE EUST FIRFORE l
POSITIONINDICATICRCHECK(PIT)
SHUTD0VN, EUI IDT ITS!!QUIREDSAFETT E0tE OFTEN THAN ONCE FUCff!05 EVERY 90 DATS, PIT-IVERT REFUELING 01 2 ftS.
E0V-850B SIS ISOL SEE E0V-85CA SEE E0V-850A SEE E0V-850A E0V-8500 SIS ISOL SEE E0V-850A SEE E0V-850A SEE E0V-850A i
S15-003 SIS ISOL CHECK TECH. SPEC. 3.3.5. 4.2.1 AND 4.2.2 APPLIES TECH. SPEC.
VALVE EUST FERFORE ISTPROGRAE,SEATLEAKTEST(AT),CHECKVALVE 3.3.5/4.2.2.-COLD ITS REQUIRED SAFETT EIEtCISE TEST (CVT)
SHUTD0HN > 72 HRS.
FDCETIDX, LEAKAGE 01 REFUELING 01 ATTER LIBITED TO 1 GPB EAINTEXANCE. TECH.
SPEC. 4.2.1-EVERT REFUELING, AT &
CVT-EVERT REFUELING 01 2 ftS.
515-004 SIS ISOL CHECK SEE SIS-003 SEE S15-003 SEE SIS-003 515-010 SIS ISOL CHICE SEE SIS-003 SEE SIS-003 SEE SIS-003