See also: IR 05000285/1987014
Text
.. . + ,
In Reply Refer To:
Docket: .50-285/87-14
Omaha Public Power District
ATTN:
R. L.:Andrews,-Division Manager-
Nuclear. Production
1623 Harney Street
.0maha, Nebraska
68102
Gentlemen:
This refers to the inspection conducted by Mr. L. D. Gilbert of this office
during the' period May-5-8, 1987, of activities authorized by NRC Operating
License DPR-40 for Fort Calhoun Station, and to the discussion of our findings
with you and other members of your staff at the conclusion of the inspection.
The area examined.during the inspection was the repair welding to the welds of
the emergency feedwater storage tank. Within this area,-the inspection
consisted of. selective examination of procedures and representative records,
interviews with personnel, and observations by the NRC inspector.
The
inspection findings are documented in the enclosed inspection report.
During this inspection,. it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to r'espond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of.1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
J. E. Gagliardo, Chief
Reactor. Projects Branch
Enclosures:
(see next page)
y
.
PB.
RIV:RSB/E'
R$B
LDGilbert/cjg
REIr land
Hunter
TFWeseMan -
.JEGaJ1drdo
4 /// /87
[/p/87
Q/(v/87
b /I'h/87
f{/87
8707060432 B70629
gDR
ADocK0500g5
-[/
I
.
.
,
Omaha Public Power District
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-285/87-14
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P. 0.' Box 399
Fort Calhoun, Nebraska
68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, D..C.
20036
Kansas ' Radiation Control ' Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE01)
bec distrib, by RIV:
- RPB
- RRI
R.D. Martin, RA
RPSB
- Section Chief (RPB/B)
- MIS System
- RIV File
DRSP
- RSTS Operator
- RSB
- Project Inspector, RPB
- D. Weiss, RM/ALF
- R. Hall
NRR Project Manager
- Section Chief (RSB/ES)
- L. Gilbert
- w/766
l
1