Text

e

-a l (MC) Rev. 14 l Effective Date f- k Sf l

l INFORMATION t ONLY .

l ANNUNCIATOR RESPONSE l

AR-602 FLORIDA POWER CORPORATION l

l CRYSTAL RIVER UNIT 3 l

TGF N ANNUNCIATOR RESPONSE l

l l l

! l I

I APPROVED BY: Interpretation Contact 4.': / D b - l Hih?Y (5'IGNhTURE N TILE)

DATE: 'l 5 kh '

(/

INTERPRETATION CONTACT: Manager, Nuclear Plant I Operations Support 9803110084 980304' PDR ADOCK 05000302 P PDR ,

. J

O TABLE OF CONTENTS O SECTION PAGE 1.0 PURP05E................................................................. 1

2.0 REFERENCES

.............................................................. 1 I 2.1 IMPLEMENTING REFERENCES........................................ .... 1 2.2 DEVELOPMENTAL REFERENCES............................................ 1 3.0 PERSONNEL INDOCTRINATION................................................ 1 4.0 INSTRUCTIONS............................................................ 1 5.0 FOLLOW-UP ACTIONS....................................................... 1 ENCLOSURE 1 An n u n ci at o r Re s po n s e . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 l

l C

I AR-602 Rev. 14 Page i

(_ j

F* 1 i

1 .

w 1.0 PURPOSE O i i 1.1 Establish a reference document for each Annunciator Window on the l TGF-AX2 Lampbox.

1.2 Establish operator actions for valid Annunciator alarms on the TGF-AX2 Lampbox.

i 1.3 Establish a reference to other procedures which address operator actions for valid Annunciator alarms on the TGF-AX2 Lampbox.

2.0 REFERENCES

l 2.1 IMPLEMENTING REFERENCES 2.1.1 AR-971, CXAR Annunciator Response 2.1.2 OP-603, Condensate System 2.1.3 OP-607 Condenser Vacuum System 2.2 DEVELOPMENTAL REFERENCES

{G)

2.2.1 INPO 90-021, Good Practice OP-217, Alarm Response Procedures 2.2.2 Annunciator Window Engraving Drawing E-224-049 I

3.0 PERSONNEL 7.NDOCTRINATION 3.1 The Annunciator System is powered from VBDP-5 Breaker 28.

4.0 JNSTRUCTIONS 4.1 Respond to alarms on the TGF-AX2 Lampbox as indicated on Enclosure 1, Annunciator Response.

5.0 FOLLOW-UP ACTIONS None O

I AR-602 Rev. 14 Page 1 L l

i r .

i r g' ENCLOSURE 1

! / (Page 1 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF- AX2-01-02 N-01-02 l

l CONDENSER VAC PUMP TRIP EVENT POINT 0037 INDICATED CONDITION:

o ARP-1A BREAKER OPEN WITH LOCAL OR REMOTE CONTROL HANDLE IN THE NORMAL AFTER START POSITION.

(

1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

~

o GREEN LIGHT IS ON WITH A RED FLAG ON ARP-1A LOCAL OR REMOTE CONTROL STATION.

l o MAIN CONDENSER VACUUM DECREASING CD-7-PIR.

OPERATOR ACTIONS FOR A VALID ALARM:

o START ARP-1B.

o MONITOR CONDENSER VACUUM.

DISCUSSION:

THIS IS AN EXPECTED ALARM WHEN STARTING THE PUMP UNTIL TARGETS ARE MATCHED ON THE LOCAL CONTROL STATION.

l l

l

REFERENCES:

DRAWING 208-007 SHEET AR-01 SENSING ELEMENT: CONTACTS ON THE CONTROL STATION AND BREAKER l

AR-602 Rev. 14 Page 2 L

t.

I ENCLOSURE 1 lV L

l tg (Page 2 of 76)

! TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-02 N-01-02 l

l CONDENSER VAC PUMP l TRIP

\

F EVENT POINT 0038 INDICATED CONDITION:

l o ARP-1B BREAKER OPEN WITH LOCAL OR REMOTE CONTROL HANDLE IN THE NORMAL I AFTER START POSITION.

-s 1%)

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT IS ON WITH A RED FLAG ON ARP-1B LOCAL OR REMOTE CONTROL I STATION.

o MAIN CONDENSER VACUUM DECREASING CD-7-PIR.

OPERATOR ACTIONS FOR A VALID ALARM:

o START ARP-1A.

o MONITOR CONDENSER VACUUM.

DISCUSSION:

THIS IS AN EXPECTED ALARM WHEN STARTING THE PUMP UNTIL TARGETS ARE MATCHED ON THE LOCAL CONTROL STATION.

I)

'V

REFERENCES:

DRAWING 208-007 SHEET AR-02

! SENSING ELEMENT: CONTACTS ON THE CONTROL STATION AND BREAKER AR-602 Rev. 14 Page 3

l*

ENCLOSURE 1 (Page 3 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF- AX2-01-03 N-01-03 CONDENSER VAC PUMP TROUBLE EVENT POINT-0025 INDICATED CONDITION:

o ARP-1A BREAKER CLOSED AND EITHER LOCAL OR REMOTE CONTROL STATION IN NORMAL AFTER STOP.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT IS ON WITH A GREEN FLAG ON ARP-1A CONTROL STATION.

o CONDENSER VACUUM COMPUTER POINT, T-215.

o CONDENSER VACUUM CD-7-PIR.

OPERATOR ACTIONS FOR A VALID ALARM:  !

o MONITOR CONDENSER VACUUM.

o IF CONDENSER VACUUM IS DECREASING, THEN REFER TO OP-607.

DISCUSSION:

THE STANDBY CONDENSER VACUUM PUMP WILL AUTO START AT <26" HG AND DECREASING.

THIS IS AN EXPECTED ALARM WHEN STARTING ARP-1A FROM THE CONTROL ROOM UNTIL THE TARGETS ARE MATCHED ON THE LOCAL CONTROL STATION.

(

REFERENCES:

DRAWING 208-007 SHEET AR-01

)

f SENSING ELEMENT: CONTROL STATION AND BREAKER CONTACTS

AR-602 Rev. 14 Page 4

1 i

ENCLOSURE 1

'( (Page 4 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-03 N-01-03 CONDENSER VAC PUMP TROUBLE EVENT POINT 0026 I

INDICATED CONDITION:

o ARP-1A MOTOR AMPS >115% RATED LOAD.

[h

'w)

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ARP-1A CURRENT INDICATOR.

o ARP-1A MOTOR RUNNING HOT.

OPERATOR ACTIONS FOR A VALID ALARM:

o CONSIDERATION SHOULD BE GIVEN TO PLACING ARP-1B IN SERVICE.

o CONTACT THE ELECTRIC SHOP.

DISCUSSION:

l l

f

REFERENCES:

DRAWING 208-007 SHEET AR-01 SENSING ELEMENT: BREAKER OVERLOAD CONTACTS l

l AR-602 Rev. 14 Page 5

\ .

fe'^ ENCLOSURE 1

(,, (Page 5 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-03 N-01-03 l

CCHVDENSER VAC PUMP TROUBLE EVENT POINT 0027 INDICATED CONDITION:

o ARP-1A BREAKER CLOSED AND ARP-1A SEAL WATER PUMP, ARP-4A NOT RUNNING.

(~) l v

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ARP-4A GREEN INDICATING LIGHT IS ON LOCATED ON THE MCB.

o ARP-4A LOCAL INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY ARP-4A LOCAL SELECTOR SWITCH IN AUTO.

o CONSIDERATION SHOULD BE GIVEN TO PLACING ARP-1B IN SERVICE.

o SELEFT ARP-4A LOCAL CONTROLS TO HAND.

DISCUSSION:

ARP-4A WILL AUTO START WHENEVER ARP-1A IS STARTED IF THE LOCAL SELECTOR SWITCH IS IN AUTO. IF THE SELECTOR SWITCH IS IN OFF THE PUMP WILL NOT AUTO START.

AN AIR REMOVAL PUMP SHOULD NOT BE OPERATED WITHOUT A SEAL WATER PUMP IN SERVICE.

[)

REFERENCES:

DRAWING 208-007 SHEET AR-03 SENSING ELEMENT: BREAKER AND CONTROL STATION CONTACTS AR-602 Rev. 14 Page 6

e ENCLOSURE 1 (Page 6 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-03 N-01-03 CONDENSER VAC PUMP TROUBLE EVENT POINT 0028 INDICATED CONDITION:

o ARP-1B BREAKER CLOSED AND EITHER LOCAL OR REMOTE CONTROL STATION IN NORMAL AFTER STOP.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT IS ON WITH A GREEN FLAG ON ARP-1B CONTROL STATION.

o CONDENSER VACUUM COMPUTER POINT, T-215.

o CONDENSER VACUUM INDICATION CD-7-PIR.

OPERATOR ACTIONS FOR A VALID ALARM:

c VONITOR CONDENSER VACUUM.

o IF CONDENSER VACUUM IS DECREASING, THEN REFER TO OP-607.

DISCUSSION:

THE STANDBY CONDENSER VACUUM PUMP WILL AUTO START AT <26" HG AND DECREASING.

THIS IS AN EXPECTED ALARM WHEN STARTING ARP-1B FROM THE CONTROL ROOM UNTIL i THE TARGETS ARE MATCHED ON THE LOCAL CONTROL STATION.

REFERENCES:

DRAWING 208-007 SHEET AR-02 SENSING ELEMENT: CONTROL STATION AND BREAKER CONTACTS AR-602 Rev. 14 Page 7 s .

ENCLOSURE 1 (Page 7 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-03 N-01-03 I

CONDENSER VAC PUMP TROUBLE EVENT POINT 0029 INDICATED CONDITION:

o ARP-1B MOTOR AMPS >115% RATED LOAD.

O L) ;EDUNDANT

. INDICATION WHICH WILL VERIFY ALARM:

o ARP-1B MOTOR CURRENT INDICATOR.

o ARP-1B MOTOR RUNNING HOT.

OPERATOR ACTIONS FOR A VALID ALARM:

o CONSIDERATION SHOULD BE GIVEN TO PLACING ARP-1A IN SERVICE. i o CONTACT THE ELECTRIC SHOP.

1 DISCUSSION:

i

REFERENCES:

DRAWING 208-007 SHEET AR-02 SENSING ELEMENT: BREAKER OVERLOAD CONTACTS AR-602 Rev. 14 Page 8

<~~ ENCLOSURE 1 (s_j%) (Page 8 of '76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-03 N-01-03 ,

I CX)NDENSER VAC PUh4P TROUBLE EVENT POINT 0030 INDICATED CONDITION:

o ARP-1B BREAKER CLOSED AND ARP-1B SEAL WATER PUMP, ARP-4B NOT RUNNTG.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o ARP-4B GREEN INDICATING LIGHT IS ON, LOCATED ON THE MCB.

o ARP-4B LOCAL INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY ARP-48 LOCAL SELECTOR SWITCH IN AUTO.

o CONSIDERATION SHOULD BE GIVEN TO PLACING ARP-1A IN SERVICE. ,

o SELECT ARP-4B LOCAL CONTROLS TO HAND. i DISCUSSION:

ARP-4B WILL AUTO START WHENEVER ARP-1B IS STARTED IF THE LOCAL SELECTOR SWITCH IS IN AUTO. IF THE SELECTOR SWITCH IS IN OFF THE PUMP WELL NOT AUTO j START.

AN AIR REMOVAL PUMP SHOULD NOT BE OPERATED WITHOUT A SEAL WATER PUMP IN SERVICE.

4

()

REFERENCES:

DRAWING 208-007 SHEET AR-04 SENSING ELEMENT: BREAKER AND CONTROL SWITCH CONTACTS.

AR-602 Rev. 14 Page 9

ENCLOSURE 1 h] (Page 9 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-05 N-01-05 HOTWELL LEVEL HIGH/ LOW e

EVENT POINT 0092 INDICATED CONDITION:

o CONDENSER HOTWELL "A" LEVEL >8' 8 1/2" AS SENSED BY CD-1-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONDENSER HOTWELL "A" LEVEL INDICATION, CD-100-LI o LOCAL HOTWELL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE PROPER OPERATION OF HOTWELL LEVEL CONTROL SYSTEM.

o IF AUTOMATIC HOTWELL LEVEL CONTROL IS NOT FUNCTIONING PROPERLY THEN PLACE IN MANUAL PER OP-603.

o IF HOTWELL LEVCL IS BEING CONTROLLED MANUALLY THEN INFORM TURBINE BLDG.

OPERATOR TO EITHER REDUCE DEMIN WATER MAKEUP OR INCREASE REJECT FLOW.

DISCUSSION:

HIGH HOTWELL LEVELS CAN RESULT IN A LOSS OF CONDENSER VACUUM.

REFERENCES:

DRAWING 208-012 SHEET CD-08 SENSING ELEMENT: CD-1-LS AR-602 Rev. 14 Page 10 l

I~

l ENCLOSURE 1 g (Page 10 of 76) j TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-05 N-01-05 HOTWELL LEVEL HIGH/ LOW EVENT POINT 0093 INDICATED CONDITION:

o CONDENSER HOTWELL "A" LEVEL <8' 2 1/2" AS SENSED BY CD-2-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONDENSER HOTWELL "A" LEVEL INDICATION, CD-100-LI o LOCAL HOTWELL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE PROPER OPERATION OF HOT *' ELL LEVEL CONTROL SYSTEM.

o IF AUTOMATIC HOTWELL LEVEL CONTROL IS NOT FUNCTIONING PROPERLY THEN PLACE IN MANUAL PER OP-603.

o IF HOTWELL LEVEL IS BEING CONTROLLED MANUALLY THEN INFORM TURBINE BLOG.

OPERATOR TO EITHER INCREASE DEMIN WATER MAKEUP OR REDUCE REJECT FLOW.

DISCUSSION:

WATER LEVEL SHOULD BE MAINTAINED ABOVE 6' 10" (82") WHICH IS 150,000 GALLON VOLUME.

REFERENCES:

DRAWINC 208-012 SHEET CD-08 SENSING ELEMENT: CD-2-LS AR-602 Rev. 14 Page 11

4

/ ENCLOSURE 1 Q] (Page 11 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-05 N-01-05 HOTWELL LEVEL HIGH/ LOW EVENT POINT 0094 INDICATED CONDITION:

I o CONDENSER HOTWE..L "B" LEVEL >8' 8 1/2" AS SENSED BY CD-3-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

I o CONDENSER HOTWELL "B" LEVEL INDICATION, CD-101-LI o LOCAL HOTWELL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE PROPER OPERATION OF HOTWELL LEVEL CONTROL SYSTEM.

o IF AUTOMATIC HOTWELL LEVEL CONTROL IS NOT FUNCTIONING PROPERLY THEN PLACE IN MANUAL PER OP-603.

o IF HOTWELL LEVEL IS BEING CONTROLLED MANUALLY THEN INFORM TURBINE BLDG.

OPERATOR TO EITHER REDUCE DEMIN WATER MAKEUP OR INCREASE. REJECT FLOW.

DISCUSSION:

HIGH HOTWELL LEVELS CAN RESULT IN A LOSS OF CONDENSER VAlt,uM.

i '

REFERENCES:

DRAWING 208-012 SHEET CD-08 SENSING ELEMENT: CD-3-LS CU l

AR-602 Rev. 14 Page 12

i- j I

~

ENCLOSURE 1 l\ (Page 12 of 76) l TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-05 N-01-05 HOTWELL q LEVEL l HIGH/ LOW

)

l 1

EVENT POINT 0095 INDICATED CONDITION:

o CONDENSER HOTWELL "B" LEVEL <8' 2 1/2" AS SENSED BY CD-4-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONDENSER HOTWELL "B" LEVEL INDICATION, CD-101-LI o LOCAL HOTWELL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE PROPER OPERATION OF HOTWELL LEVEL CONTROL SYS~EM.

o IF AUTOMATIC HOTWELL LEVEL CONTROL IS NOT FUNCTIONING PROPERLY THEN PLACE IN MANUAL PER OP-603.

o IF HOTWELL LEVEL IS BEING CONTROLLED MANUALLY THEN INFORM TURBINE BLDG. I OPERATOR TO EITHER INCREASE DEMIN WATER MAKEUP OR REDUCE REJECT FLOW.

DISCUSSION:

WATER LEVEL SHOULD BE MAINTAINED ABOVE 6' 10" (82") WHICH IS 150,000 GALLON VOLUME.

REFERENCES:

DRAWING 208-012 SHEET CD-08 SENSING ELEMENT: CD-4-LS AR-602 Rev. 14 Page 13 a

f- ENCLOSURE 1 i, (Page 13 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-08 N-01-08 COND DEMIN PANEL TROUBLE EVENT POINT 0158 INDICATED CONDITION:

o CONDENSATE DEMIN ALARM PANEL HAS AN UNACKNOWLEDGED DROPPED TARGET.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

~

o LOCAL DROPPED TARGET INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o CHECK CONDENSATE FLOW AND PRESSURE o CHECK DEAERATOR LEVEL o NOTIFY TURBINE BUILDING OPERATOR TO INVESTIGATE ALARM AND REFER TO AR-971 CONDENSATE DEMIN ALARM PANEL.

DISCUSSION:

ONCE THIS ALARM HAS ACTUATED THE WINDOW WILL NOT REFLASH WHEN ANOTHER l TARGET DROPS UNLESS THE INITIAL ALARM HAS BEEN ACKNOWLEDGED LOCALLY.

l

()

REFERENCES:

DRAWING 208-017 SHEET CX-22 SENSING ELEMENT: CONTACT INSIDE DROP TARGET PANEL AR-602 Rev. 14 Page 14 i

  • 1 l

(q ENCLOSURE 1 (Page 14 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-01-09 N-01-09 l

1 4

CNDSR CNTRL AIR PRESS LOW i

(

EVENT POlMT 0040 INDICATED CONDITION:

o INSTRUMENT AIR PRESSURE TO WATER BOX VACUUM BREAKERS <80 PSIG AS SENSED BY AR-19,20,21,22,23,24,25 OR 26-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o INSTRUMENT AIR PRESSURE INDICATORS.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE THE CAUSE OF LOW PRESSURE. ,

I l

DISCUSSION:

WATERBOX VACUUM BREAKERS FAIL CLOSED ON A LOSS OF INSTRUMENT AIR.

EACH WATERBOX VACUUM BREAKER HAS AN AIR RESERVOIR AND A FILTER REGULATOR.

,O

REFERENCES:

DRAWING 208-007 SHEET AR-16 SENSING ELEMENTS: AR-19,20,21,22,23,24,25,26-PS AR-602 Rev. 14 Page 15

ENCLOSURE 1 O (Page 15 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-01 N-02-01 pg rrr l l 1 l CDSTE PUMP A I I TRIP l l l 1 l l I I I I EVENT POINT 0082 INDICATED CONDITION:

o CDP-1A BREAKER OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT IS ON WITH A RED FLAG ON CDP-1A CONTROL STATION.

o WHITE "DEAER LEVEL NORM" LIGHT IS OFF, LOCATED ON THE CDP-1A CONTROL ,

STATION.

l OPERATOR ACTIONS FOR A VALID ALARM:

o IF CAUSE OF TRIP IS A HIGH DEAERATOR LEVEL, THEN TAKE MANUAL CONTROL OF .

CDP-1A BAILEY CONTROLLER AND DRIVE DEMAND TO "0", RESTART CDP-1A AND I RETURN CONDENSATE FLOW TO NORMAL USING THE HAND / AUTO STATION.

o IF CDP-1A CANNOT BE RESTARTED REDUCE PLANT POWER TO A LEVEL AT WHICH 1 CONDENSATE PUMP CAN SUPPLY SUFFICIENT CONDENSATE FLOW.

DISCUSSION: 4 CDP-1A WILL TRIP IF DEAERATOR LEVEL GOES >13'61/i" AS SENSED BY FW-4-LS. $

MAXIMUM CONDENSATE FLOW RATE FOR A SINGLE CONDENSATE PUMP IS 5.4 E6 LBM/HR AND MAXIMUM PUMP SPEED IS 1135 RPM - THESE TWO LIMITATIONS WILL PREVENT PUMP RUNOUT.

REFERENCES:

DRAWING 208-013 SHEET CD-01 SENSING ELEMENT: CONTROL SWITCH AND BREAKER CONTACTS.

i AR-602 Rev. 14 Page 16

fa

~

i l-ENCLOSURE 1 I(] (Page 16 of 76) l ()

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-02 N-02-02 CDSTE PUMP A UNCOUPLED 4

EVENT POINT 0085 INDICATED CONDITION:

o CDP-IA MOTOR RUNNING, BEING L TROLLED FROM THE NORMAL CONDENSATE lg """" == UTP ^ " "" " " " "" " "

R l REDdNDANT INDICATION WHICH WILL VERIFY ALARM: '

o CDP-1A PUMP NOT ROTATING.

o CONDENSATE FLOW DECREASING.

l l

OPERATOR ACTIONS FOR A VALID ALARM: i

)

o SWAP CDP-1A TO SPARE CONTROLLER PER OP-603.

o IF CDP-1A CANNOT BE CONTROLLED THEN REDUCE PLANT POWER TO A LEVEL AT WHICH 1 CONDENSATE PUMP CAN SUPPLY SUFFICIENT CONDENSATE FLOW.

DISCUSSION:

THIS ALARM INDICATES THE CONTROLLING VOLTAGE SIGNAL TO THE MAGNETIC COUPLING ON THE CONDENSATE PUMP IS LOW. THIS WILL CAUSE THE PUMP TO STOP.

THIS IS A NORMAL ALARM WHEN SHUTTING DOWN A CONDENSATE PUMP.

REFERENCES:

DRAWING 208-012 SHEET CD-01 SENSING ELEMENT: BREAKER CONTACTS AND 2TIR2 (LOW VOLTAGE RELAY)

AR-602 Rev. 14 Page 17

r.

1-L gm ENCLOSURE 1

( (Page 17 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-02 N-02-02 1 CDSTE PUMP A l UNCOUPLED l l

l l EVENT POINT 0086 l

INDICATED CONDITION:

o CDP-1A MOTOR RUNNING CONTROLLED FROM THE SPARE CONTROLLER, AND LOW l VOLTAGE IS SENSED ON THE MAGNETIC COUPLING CONTROLLER OUTPUT.

REDUNDAFT INDICATION WHICH WILL VERIFY ALARM:

o CDP-1A PUMP NOT ROTATING.

c CONDENSATE FLOW DECREASING.

OPERATOR ACTIONS FOR A VALID ALARM:

l l o SWAP CDP-1A TO NORMAL CONTROLLER PER OP-603.

! q o IF CDP-1A CANNOT BE CONTROLLED THEN REDUCE PLANT POWER TO A LEVEL AT WHICH 1 CONDENSATE PUMP CAN SUPPLY SUFFICIENT CONDENSATE FLOW.

l DISCUSSION:

THIS ALARM INDICATES THE CONTROLLING VOLTAGE SIGNAL TO THE MAGNETIC COUPLING ON THE CONDENSATE PUMP IS LOW. THIS WILL CAUSE THE PUMP TO STOP.

THIS IS A NORMAL ALARM WHEN SHUTTING DOWN A CONDENSATE PUMP.

(m

REFERENCES:

DRAWING 208-012 SHEET CD-01 SENSING. ELEMENT: BREAKER CONTACTS AND 3TIR2 (LOW VOLTAGE RELAY)

I i

AR-602 Rev. 14 Page 18

r*

l .

l .

ENCLOSURE 1

(N,) (Page 18 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-03 N-02-03 CDSTE PUMP MOTOR OVERLOAD EVENT POINT 0083 INDICATED CONDITION:

o CONDENSATE PUMP 1A MOTOR AMPS >115% RATED LOAD.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDP-1A HIGH AMPS ON CURRENT INDICATOR.

o CDP-1A TRIPS.

OPERATOR ACTIONS FOR A VALID ALARM:

o REDUCE LOAD ON CDP-1A.

o IF LOAD CANNOT BE REDUCED CONSIDERATION SHOULD BE GIVEN TO SHUTTING DOWN CDP-1A.

DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR THE INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED.

INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE l BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

(

REFERENCES:

DRAWING 208-012 SHEET CD-01 SENSING ELEMENT: OVERCURRENT RELAY (49)

AR-602 Rev. 14 Page 19 l

p.

e f

ENCLOSURE 1

' ,G)

( (Page 19 of 76) l TGF-N ANNUNCIATOR RESPONSE TGF-/sX2-02-03 N-02-03 1

! i CDSTE PUMP MOTOR OVERLOAD

, w f

EVENT POINT 0087 INDICATED CONDITION:

o CONDENSATE PUMP 18 MOTOR AMPS >115% RATED LOAD.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

~

o CDP-1B HIGH AMPS CURRENT INDICATOR.

o CDP-1B TRIPS.

OPERATOR ACTIONS FOR A VALID ALARM:

o REDUCE LOAD ON CDP-18.

o IF LOAD CANNOT BE REDUCED CONSIDERATION SHOULD BE GIVEN TO SHUTTING DOWN CDP-1B.

DISCUSSION:

THIS ALARM INDICATES THAT EITHER THE TIMED OVERCURRENT OR THE INSTANTANEOUS OVERCURRENT PROTECTIVE DEVICES HAVE ACTUATED.

INSTANTANEOUS OVERCURRENT PROTECTIVE RELAY ACTUATION WILL TRIP THE BREAKER.

IT IS POSSIBLE TO HAVE THIS ALARM PRIOR TO THE BREAKER TRIP.

REFERENCES:

DRAWING 208-012 SHEET CD-02 SENSING ELEMENT: OVERCURRENT RELAY (49)

AR-602 Rev. 14 Page 20 I

ENCLOSURE 1

! ,/ (Page 20 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-05 N-02-05 l

l

l. -

CDV 100 OPEN EVENT POINT 0091 INDICATED CONDITION:

o CDV-100 IS NOT FULL CLOSED.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RAPIDLY INCREASING HOTWELL LEVELS.

o RAPIDLY DECREASING CONDENSATE STORAGE TANK LEVEL.

OPERATOR ACTIONS FOR A VALID ALARM:

o CLOSE CDV-100.

o CLOSE CDV-99 TO ISOLATE CDV-100, LOCATED ON THE 95' ELEVATION TB.

DISCUSSION:

CDV-100 IS THE CONDENSER EMERGENCY MAKEUP VALVE.

CDV-100 IS A MANUALLY OPERATED PNEUMATIC VALVE (THE AIR IS ISOLATED AND CAPPED).

CDV-100 IS NORMALLY ISOLATED WITH CDV-99 BEING CLOSED.

{

l

()

REFERENCES:

DRAW ~'4G 208-012 SHEET CD-08 SENSING ELEMENT: CLOSED CONTACT ON CDV-100 j AR-602 Rev. 14 Page 21 l

l ENCLOSURE 1 (Page 21 of 76) l\s l TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-06 N-02-06 l

CDSTE STOR TNK LEVEL HIGH/ LOW EVENT POINT 0096 INDICATED CONDITION:

o CONDENSATE STORAGE TANK LEVEL >31 FEET AS SENSED BY CD-58-LS.

A V

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONDENSATE STORAGE TANK LEVEL INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o REDUCE REJECT GOING TO CONDENSATE STORAGE TANK.

DISCUSSION:

l

{

REFERENCES:

DRAWING 208-012 SHEET CD-09 l

i i

v SENSING ELEMENT:CD-58-LS l

AR-602 Rev. 14 Page 22 l

i

l

= l c ENCLOSURE l' i (Page 22 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-02-06 N-02-06 1

l CDSTE STOR TNK LEVEL HIGH/ LOW EVENT POINT 0097 I

INDICATED CONDITION:

o CONDENSATE STORAGE TANK LEVEL <24 FEET AS SENSED BY CD-59-LS.

f3 O

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CONDENSATE STORAGE TANK LEVEL INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o ADD WATER TO CONDENSATE STORAGE TANK. j l

DISCUSSION:

i

)

l

REFERENCES:

DRAWING 208-012 SHEET CD-08

)

SENSING ELEMENT:CD-59-LS l AR-602 Rev. 14 Page 23

ENCLOSURE 1

'h] (Page 23 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-03-01 N-03-01 l l l l CDSTE PUMP B I I TRIP I I I I I I I l l l EVENT POINT 0099 INDICATED CONDITION:

o CDP-1B BREAKER OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION.

' (V REDUNDANT INDICATION WHICH WILL VERIFY ALARM: \

l o GREEN LICHT IS ON WITH A RED FLAG ON CDP-1B CONTROL STATION.

o WHITE "DEAER LEVEL NORM" . LIGHT IS OFF, LOCATED ON THE CDP-18 CONTROL STATION.

o CONDENSATE FLOW INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o IF CAUSE OF TRIP IS A HIGH DEAERATOR LEVEL, THEN TAKE MANUAL CONTROL OF CDP-1B BAILEY CONTROLLER AND DRIVE DEMAND TO "0", RESTART CDP-1B AND l RETURN CONCENSATE FLOW TO NORMAL USING THE HAND / AUTO STATION, 1 o IF CDP-1B CANNOT BE RESTARTED REDUCE PLANT POWER TO A LEVEL AT WHICH 1 CONDENSATE PUMP CAN SUPPLY SUFFICIENT CONDENSATE FLOW.

DISCUSSION:

A DEAERATOR LEVEL OF >13'61/2" SENSED BY FW-341-LS WILL TRIP CDP-18.

MAXIMUM CONDENSATE FLOW-RATE FOR A SINGLE CONDENSATE PUMP IS 5.4 E6 LBM/HR MAXIMUM CONDENSATE PUMP SPEED IS 1135 RPM. THESE TWO LIMITATION WILL PREVENT PUMP RUNOUT.

\-

REFERENCES:

DRAWING 208-013 SHEET CD-02 SENSING ELEMENT: CONTROL SWITCH AND BREAKER CONTACTS.

AR-602 Rev. 14 Page 24

T*

l .

- \

\

ENCLOSURE l (Page 24 of 76) i TGF-N ANNUNCIATOR RESPONSE TGF-AX2-03-02 N-03-02 1

l CDSTE PUMP B

{

UNCOUPLED

. \

l l EVENT POINT 0089 INDICATED CONDITION:

o CDP-1B MOTOR RUNNING ON NORMAL CONTROLLER AND A LOW VOLTAGE IS SENSED ON THE MAGNETIC COUPLING CONTROLLER OUTPUT.

.O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDP-1B PUMP NOT ROTATING.

o CONDENSATE FLOW DECREASING.

OPERATOR ACTIONS FOR A VALID ALARM:

o SWAP CDP-1B TO SPARE CONTROLLER PER OP-603.

o IF CDP-1B CANNOT BE CONTROLLED THEN REDUCE PLANT POWER TO A LEVEL AT WHICH 1 CONDENSATE PUMP CAN SUPPLY SUFFICIENT CONDENSATE FLOW.

l DISCUSSION:

THIS ALARM INDICATES THE CONTROLLING VOLTAGE SIGNAL TO THE MAGNETIC COUPLING ON THE CONDENSATE PUMP IS LOW. THIS WILL CAUSE THE PUMP TO STOP.

THIS IS A NORMAL ALARM WHEN SHUTTING DOWN A CONDENSATE PUMP.

REFERENCES:

DRAWING 208-012 SHEET CD-02 SENSING ELEMENT: BREAKER CONTACTS AND 2TIR2 (LOW VOLTAGE RELAY)

AR-602 Rev. 14 Page 25

(.

i l

l

/N ENCLOSURE 1

( ,) (Page 25 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-03-02 N-03-02 CDSTE PUMP B UNCOUPLED EVENT POINT 0090 INDICATED CONDITION:

o CDP-1B MOTOR RUNNING CONTROLLED FROM THE SPARE CONTROLLER AND A LOW VOLTAGE IS SENSED ON THE MAGNETIC COUPLING CONTROLLER OUTPUT.

f~'%

b REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDP-1B PUMP NOT ROTATI'NG.

o CONDENSATE FLOW DECREASING.

OPERATOR ACTIONS FOR A VALID ALARM:

o SWAP CDP-1B TO NORMAL CONTROLLER PER OP-603.

o IF CDP-1B CANNOT BE CONTROLLED THEN REDUCE PLANT POWER TO A LEVEL AT WHICH 1 CONDENSATE PUMP CAN SUPPLY SUFFICIENT CONDENSATE FLOW. <

l DISCUSSION:

THIS ALARM INDICATES THE CONTROLLING VOLTAGE SIGNAL TO THE MAGNETIC COUPLING ON THE CONDENSATE PUMP IS LOW. THIS WILL CAUSE THE PUMP TO STOP.

THIS IS A NORMAL ALARM WHEN SHUTTING DOWN A CONDENSATE PUMP.

()

REFERENCES:

DRAWING 208-012 SHEET CD-02 SENSING ELEMENT: BREAKER CONTACTS AND 3TIR2 (LOW VOLTAGE RELAY) l AR-602 Rev. 14 Page 26

ENCLOSURE 1

[ (Page 26 of 76)

'%.)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-01 N-04-01 l l l l CDSTE HTR 1 A/B I I LEVEL HIGH l l l l ,__

l l . , _

EVENT POINT 0266 INDICATED CONDITION:

o CONDENSATE HEATER 1A LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-20-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDHE-1A LOCAL SIGHTCLASS OPERATOR ACTIONS iDR A VALID ALARM:

o ENSURE HEATER DUMP VALVE, HDV-102 OPEN.

o ENSURE HEATER CONTROL VALVE, HDV-101 OPEN.

DISCUSSION:

A HIGH-HIGH LEVEL IN CDHE-1A WI'LL TRIP THE TURBINE, 3' 3 5/8" ABOVE NWL AS SENSED BY HD-167-LS (NWL = 123' 8 3/8" ELEV.)

CDHE-1A HAS NO EXTRACTION NON-RETURN VALVE.

REFERENCES:

DRAWING 208-065 SHEET HD-03 SENSING ELEMENT: HD-20-LS AR-602 Rev. 14 Page 27

[+-.-

l I

ENCLOSURE 1

) (Page 27 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-01 N-04-01 i

l rr per x l l

! I I CDSTE HTR 1A/B

l. l l LEVEL l l l HIGH l 1 l

I I I I EVENT POINT 0269 INDICATED CONDITION:

o CONDENSATE HEATER 1B LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY

HD-22-LS.

O b REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDHE-1B LOCAL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE HEATER DUMP VALVE, HDV-104 OPEN.

o ENSURE HEATER CONTROL VALVE, HDV-103 OPEN.

l I

l DISCUSSION:

f I. A HIGH-HIGH LEVEL IN CDHE-1B WILL TRIP THE TURBINE, 3' 3 5/8" AB0VE NWL AS SENSED BY HD-168-LS (NWL = 123' 8 3/8" ELEV.)

CDHE-1B HAS NO EXTRACTION NON-RETURN VALVE.

[v

REFERENCES:

DRAWING 208-065 SHEET HD-03 SENSING ELEMENT: HD-22-LS AR-602 Rev. 14 Page 28

T*.

9

,e ENCLOSURE 1

( (Page 28 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-02 N-04-02 l

l CNDSTE HTR 1 A/B DUMP VALVES NOT FULL CLOSED EVENT POINT 0267 I INDICATED CONDITION:

o CONDENSATE HEATER 1A DUMP VALVE HDV-102, NOT FULL CLOSED.

l REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL VALVE POSITION. 4 o CDHE-1A LEVEL HIGH. l 1

OPERATOR ACTIONS FOR A VALID ALARM-  !

[ o VERIFY PROPER CDHE-1A LEVEL CONTROL VALVE, HDV-101 OPERATION.

l

\

I

)

DISCUSSION:

A HIGH LEVEL IN CDHE-1A WILL OPEN THE DUMP VALVE.

j A TURBINE TRIP AS SENSED BY LOW AUTO-STOP OIL PRESSURE WILL OPEN THE DUMP VALVE.

I I

(3 G

REFERENCES:

DRAWING 208-065 SHEET HD-03 SENSING ELEMENT: CLOSED CONTACT ON VALVE.

AR-602 Rev. 14 Page 29

d r~' ENCLOSURE 1 ly (Page 29 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-02 N-04-02 CNDSTE HTR 1 A/B DUMP V.ALVES NOT FULL CLOSED 1

EVENT POINT 0270 '

)

INDICATED CONDITION:

o CONDENSATE HEATER 1B DUMP VALVE HDV-104, NOT FULL CLOSED. t REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL VALVE POSITION.

o CDHE-1B LEVEL HIGH.

I OPERATOR ACTIONS FOR A VALID ALARM:  !

o VERIFY PROPER CDHE-1B LEVEL CONTROL VALVE, HDV-103 OPERATION.

DISCUSSION:

A HIGH LEVEL IN CDHE-1B KELL OPEN THE DUMP VALVE.

A TURBINE TRIP AS SENSED BY LOW AUTO-STOP OIL PRESSURE WILL OPEN THE DUMP VALVE.

()

REFERENCES:

DRAWING 208-065 SHEET HD-03 SENSING ELEMENT: CLOSED CONTACT ON VALVE.

AR-602 Rev. 14 Page 30

i l

l e

i e~- ENCLOSURE 1

(,g) (Page 30 of 76) 1GF-N ANNUNCIATOR RESPONSE TGF-AX2-04-03 N-04-03 I

DEAERATOR LEVEL HIGH/ LOW EVENT POINT 1500 INDICATED CONDITION:

o DEAERATOR LEVEL >11' 9 1/2" AS SENSED BY FW-6-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DEAERATOR LEVEL INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o REDUCE CONDENSATE FLOW TO THE DEAERATOR.

DISCUSSION: l WliEN DEAERATOR LEVEL REACHES >12'31/2" DEAERATOR DUMP VALVE HDV-83 OPENS, AND FWHE-5A/B CASCADE VALVES HDV-53 AND HDV-54 CLOSE.

V! HEN DEAERATOR LEVEL REACHES >13'6 1/2" THE CONDENSATE PUMPS WILL TRIP.

CD-61-LIR IS TEMPERATURE COMPENSATED AND WILL INDICATE APPROXIMATELY 10" l HIGHER THAN CD-80-LI (CD-80-LT) AND TANK SIGHTGLASS.

II I V)

I

REFERENCES:

DRAWING 208-032 SHEET FW-45 SENSING ELEMENT: FW-6-LS AR-602 Rev. 14 Page 31

r.- 1 ENCLOSURE 1 1(

' /^)s (Page 31 of 76) 1 TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-03 N-04-03 '

l l

DEAERATOR t

LEVEL HIGH/ LOW I

i EVENT POINT 1501 l

l INDICATED CONDITION:

l o DEAERATOR LEVEL <7' AS SENSED BY FW-6-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DEAERATOR LEVEL INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM: I o INCREASE CONDENSATE FLOW TO THE DEAERATOR.

DISCUSSION:

WHEN DEAERATOR LEVEL REACHES <2'10" MAIN FEEDWATER B0OSTER PUMPS WILL TRIP CD-61-LIR IS TEMPERATURE COMPENSATED AND WILL INDICATE HIGHER THAN LD-80-LI (CD-80-LT) AND TANK SIGHTGLASS.

h O

lG

REFERENCES:

DRAWING 208-032 SHEET FW-45 SENSING ELEMENT: FW-6-LS AR-602 Rev. 14 Page 32

-(' ENCLOSURE 1 5

(Page 32 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-05 N-04-05 FW HTR 3/5/6 LEVEL Hf1H d

EVENT POINT 0278 INDICATED CONDITION:

o CONDENSATE HEATER 3A LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-28-LS.

f~ %

( I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-123 OPEN.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-119.

DISCUSSION:

ON A HIGH-HIGH HEATER LEVEL THE EXTRACTION NON-RETURN VALVE THAT FEEDS THE HEATER WILL CLOSE.

! i

'(

REFERENCES:

DRAWING 208-065 SHEET !!D-07 SENSING ELEMENT: HD-28-LS AR-602 Rev. 14 Page 33

4 l

,- . ENCLOSURE 1 l V)

( (Page 33 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-05 N-04-05 l

l FVV FfrR 3/5/6 LEVEL HIGH

?

EVENT POINT 0281 INDICATED CONDITION:

o CONDENSATE HEATER 3B LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-30-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIGHTCLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-124 OPEN.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-120.

l DISCUSSION:

ON A HIGH-HIGH HEATER LEVEL THE EXTRACTION NON-RETURN VALVE THAT FEEDS THE HEATER WILL CLOSE.

l

/( )

REFERENCES:

DRAWING 208-065 SHEET HD-07 SENSING ELEMENT: HD-30-LS AR-602 Rev. 14 Page 34

' ENCLOSURE 1 (Page 34 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-05 N-04-05 u.

. . ~

FW HTR 3/5/6 LEVEL HIGH EVENT POINT 0284 INDICATED CONDITION:

o FEEDWATER HEATER SA (FWH' i t r.t > >8.3" ABOVE NOR*ML WATER LEVEL AS SENSED BY HD-69-LS.

O REDUNDANT INDICATION WHICH W. L ..IFY ALARM:

o LOCAL HEATER LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALIO ALARM:

o VERIFY HEATER DUMP VALVE, HDV-55 OPEN.

4 o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-53. '

DISCUSSION:

ON A HIGH-HICH HEATER LEVEL THE EXTRACI' ION NON-RETURN VALVE THAT FEEDS THE HEATER WILL CLOSE.

REFERENCES:

DRAWING 208-065 SHEET HD-09 SENSING ELEMENT: HD-69-LS AR-602 Rev. 14 Page 35

ENCLOSURE 1 (Page 35 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-05 N-04-05 FW HTR 3/5/6 LEVEL HIGH EVENT POINT 0287 INDICATED CONDITION:

o FEEDWATER HEATER 58 (FWHE-28) LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-70-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-56 OPEN.

o VEPIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-54.

' DISCUSSION:

ON A HIGH-HIGH HEATER LEVEL THE EXTRACTION NON-RETURN VALVE THAT FEEDS THE HEATER WILL CLOSE.

REFERENCES:

DRAWING 208-065 SHEET HD-09 SENSING ELEMENT: HD-70-LS AR-602 Rev. 14 Page 36

i I

e

.A ENCLOSURE 1

{} (Page 36 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-05 N-04-05 I

FW HTR 3/5/6 LEVEL HIGH EVENT POINT 0290 INDICATED CONDITION:

o CONDENSATE HEATER 6A LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-71-LS.

v REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-63 OPEN.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-61.

DISCUSSION:

ON A HIGH-HIGH HEATER LEVEL THE EXTRACTION NON-RETURN VALVE THAT FEEDS THE HEATER WILL CLOSE.

REFERENCES:

DRAWING 208-065 SHEET HD-11 SENSING ELEMENT: HD-71-LS AR-602 Rev. 14 Page 37

d 1 .o g-sg ENCLOSURE 1

() (Page 37 of 76) l TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-05 N-04-05 l

1 FVV FrrR 3/5/6 LEVEL i

HIGH EVENT POINT 0293 l

l INDICATED CONDITION:

o CONDENSATE HEATER 6B LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-72-LS.

lO REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIGHTGLASS.

l l

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-64 OPEN, o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-62.

I DISCUSSION:

ON A HIGH-HIGH HEATER LEVEL THE EXTRACTION NON-REEURN VALVE THAT FEEDS THE HEATER WILL CLOSE.

t

(

REFERENCES:

DRAWING 208-065 SHEET HD-11 SENSING ELEMENT: HD-72-LS AR-602 Rev. 14 Page 38

(

~

j.

I ENCLOSURE 1 (Page 38 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-07 N-04-07 l

l REHEATER SHELL LEVEL HIGH EVENT POINT 0257 INDICATED CONDITION:

o "A" MOISTURE SEPARATOR REHEATER BELLY DRAIN LEVEL >6" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-98-LS.

k REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL BELLY DRAINS SIGHTGLASS INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

j o VERIFY PROPER OPERATION OF BELLY DRAINS LEVEL CONTROL VALVE, HDV-77.

DISCUSSION:

THE MSR BELLY DRAINS ARE DUMPED DIRECTLY TO THE HOTWELL. i l

l

REFERENCES:

DRAWING 208-065 SHEET HD-001 SENSING ELEMENT: HD-98-LS AR-602 Rev. 14 Page 39 j

ENCLOSURE 1 O (Page 39 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF- AX2-04-07 N-04-07 REHEATER SHELL LEVEL HIGH EVENT POINT 0259 INDICATED CONDITION: I o "B" MOISTURE SEPARATOR REHEATER BELLY DRAIN LEVEL >6" AB0VE NORMAL WATER LEVEL AS SENSED BY HD-101-LS.

r U REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL BELLY DRAINS SIGHTGLASS INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF BELLY DRAINS LEVEL CONTROL VALVE, HDV-78.

I DISCUSSION:  !

THE MSR BELLY DRAINS ARE DUMPED DIRECTLY TO THE HOTWELL.

REFERENCES:

DRAWING 208-065 SHEET HD-001 SENSING ELEMENT: HD-101-LS AR-602 Rev. 14 Page 40

1 l

l f- ENCLOSURE 1

( (Page 40 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-07 N-04-07 i

REHEATER SHELL LEVEL HIGH EVENT POINT 0261 INDICATED CONDITION:

o "C" MOISTURE SEPARATOR REHEATER BELLY DRAIN LEVEL >6" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-104-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL BELLY DRAINS SIGHTGLASS INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF BELLY DRAINS LEVEL CONTROL VALVE, HDV-79.

DISCUSSION:

THE MSR BELLY DRAINS ARE DUMPED DIRECTLY TO THE HOTWELL.

()

REFERENCES:

DRAWING 208-065 SHEET HD-002 SENSING ELEMENT: HD-104-LS l

AR-602 Rev. 14 Page 41

I=

i l

,- ENCLCSURE 1

( (Page 42 of 76) l TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-07 N-04-07 REHEATER SHELL LEVEL HIGH EVENT POINT 0263 INDICATED CONDITION:

o "D" MOISTURE SEPARATOR REHEATER BELLY DRAIN LEVEL >6" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-107-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL BELLY DRAINS SIGHTGLASS INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF BELLY DRAINS LEVEL CONTROL VALVE, HDV-80.

DISCUSSION:

THE MSR BELLY DRAINS ARE DUMPED DIRECTLY TO THE HOTWELL. {

l l

REFERENCES:

DRAWING 208-065 SHEET HD-002 SENSING ELEMENT: HD-107-LS '

l AR-602 Rev. 14 Page 42

7 9

( ENCLOSURE 1

'( (Page 42 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-08 N-04-08 RHTR DRN AND FLASH TNK LEVEL HIGH EVENT POINT 0295 INDICATED CONDITION:

o MSR HIGH PRESSURE DRAIN TANK "A" LEVEL >4" AB0VE NORMAL WATER LEVEL AS SENSED BY HD-48-LS.

r REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL MSR HIGH PRESSURE DRAIN TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "A" DUMP VALVE, HDV-250.

o VERIFY PROPER OPERATION OF MSR "A" LEVEL CONTROL VALVE HDV-9.

DISCUSSION:

DRAINS FROM THE "A" MSR HP DRAIN TANK GO TO FWHE-6A SHELL SIDE.

I

REFERENCES:

DRAWING 208-065 SHEET HD-012 SENSING ELEMENT: HD-48-LS

)

AR-602 Rev. 14 Page 43

I?

Y*

ENCLOSURE 1 (n) (Page 43 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-08 N-04-08 l

t RHTR DRN AND FLASH TNK LEVEL HIGH '

l EVENT POINT 0296 1

INDICATED CONDITION:

o MSR HIGH PRESSURE DRAIN TANK "B" LEVEL >4" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-44-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:  ;

o LOCAL MSR HIGH PRESSUliE DRAIN TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "B" DUMP VALVE, HDV-247.

o VERIFY PROPER OPERATION OF MSR "B" LEVEL CONTROL VALVE HDV-10.

l 1

DISCUSSION:

DRAINS FROM THE "B" MSR HP DRAIN TANK GO TO FWHE-6A SHELL SIDE.

(

REFERENCES:

DRAWING 208-065 SHEET HD-013

! SENSING ELEMENT: HD-44-LS AR-602 Rev. 14 Page 44

4 ENCLOSURE 1

{'N v 1 (Page 44 of 76)

! TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-08 N-04-08 RHTR DRN AND FLASH TNK LEVEL HIGH EVENT POINT 0297 INDICATED CONDITION:

o MSR HIGH PRESSURE DRAIN TANK "C" LEVEL >4" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-50-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL MSR HIGH PRESSURE DRAIN TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "C" DUMP VALVE, HDV-249, o VERIFY PROPER OPERATION OF MSR "C" LEVEL CONTROL VALVE HDV-11 DISCUSSION:

DRAINS FROM THE "C" MSR HP DRAIN TANK GO TO FWHE-6B SHELL SIDE.

l

REFERENCES:

DRAWING 208-065 SHEET HD-014 SENSING ELEMENT: HD-50-LS i

AR-602 Rev. 14 Page 45

t l

l ENCLOSURE 1 O (Page 45 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF- AX2-04-08 N-04-08 i

RHTR DRN AND FLASH TNK LEVEL I

HIGH I

I I

I _

EVENT POINT 0298 INDICATED CONDITION:

o MSR HIGH PRESSURE DRAIN TANK "D" LEVEL >4" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-46-LS.

O V

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL MSR HIGH PRESSURE DRAIN TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "D" DUMP VALVE, HDV-248.

o VERIFY PROPER OPERATION OF MSR "D" LEVEL CONTROL VALVE HDV-12 DISCUSSION:

DRAINS FROM THE "D" MSR HP DRAIN TANK GO TO FWHE-6B SHELL SIDE.

REFERENCES:

DRAWING 208-065 SHEET HD-015 SENSING ELEMENT: HD-46-LS l AR-602 Rev. 14 Page 46

1 e

p ENCLOSURE 1

( (page 46 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF- AX2-04-08 N-04-08 4 I

RHTR DRN AND FLASH TNK LEVEL HIGH j

)

EVENT POINT 0299 1

INDICATED CONDITION:

o MSR LOW PRESSURE DRAIN TANK "A" LEVEL >135'5/8" AS SENSED BY HD-47-LS.

O 1 REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL MSR LOW PRESSURE DRAIN TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "A" DUMP VALVE, ilDV-37.

o VERIFY PROPER OPERATION OF MSR "A" LEVEL CONTROL VALVE HDV-33. I DISCUSSION: I l

DRAINS FROM THE "A" MSR LP DRAIN TANK GO TO FWHE-5A SHELL SIDE. '

l 4

I "'FERENCES: DRAWING 208-065 SHEET HD-017 SENSING ELEMENT: HD-47-LS AR-602 Rev. 14 Page 47

T- -

\

(" ENCLOSURE 1 (Page 47 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-08 N-04-08 i

i l

RHTR DRN AND FLASH TNK LEVEL HIGH l EVENT POINT 0300 INDICATED CONDITION:

o MSR LOW PRESSURE DRAIN TANK "B" LEVEL >135'5/8" AS SENSED BY HD-43-LS.

REDUNDANT INDICATION WHICH HELL VERIFY ALARM:

I o LOCAL MSR LOW PRESSURE DRAIN TANK LEVEL INDICATOR.

I

! OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "B" DUMP VALVE, HDV-38.

o VERIFY PROPER OPERATION OF MSR "B" LEVEL COMTROL VALVE HDV-34.

i l

DISCUSSION:

DRAINS FROM THE "B" MSR LP DRAIN TANK GO TO FWHE-5A SHELL SIDE.

[Jh

REFERENCES:

DRAWING 208-065 SHEET HD-017 SENSING ELEMENT: HD-43-LS AR-602 Rev. 14 Page 48

  • I

/- m ENCLOSURE 1

.( ,)

(Page 48 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-08 N-04-08 RHTR DRN AND FLASH TNK LEVEL HIGH d

EVENT POINT 0301 INDICATED CONDITION:

o MSR LOW PRESSURE DRAIN TANK "C" LEVEL >135'5/8" AS SENSED BY HD-49-LS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM: {

o LOCAL MSR LOW PRESSURE DRAIN TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER OPERATION OF MSR "C" DUMP VALVE, HDV-39.

o VERIFY PROPER OPERATION OF MSR "C" LEVEL CONTROL VALVE HDV-35.

DISCUSSION: I DRAINS FROM THE "C" MSR LP DRAIN TANK GO TO FWHE-5B SHELL SIDE.

l l

1 U)

REFERENCES:

DRAWING 208-065 SHEET HD-018 SENSING ELEMENT: HD-49-LS AR-602 Rev. 14 Page 49

f-a

! -~

ENCLOSURE 1

!lV) (Page 49 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-04-08 N-04-08 i

RHTR DRN AND FLASH TNK LEVEL HIGH l

l EVENT POINT 0302 l

l INDICATED CONDITION:

i l o MSR LOW PRESSURE DRAIN TANK "D" LEVEL >135'5/8" AS SENSED BY HD-45-LS.

l 7-~

s_-

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL MSR LOW PRESSURE DRAIN TANK LEVEL INDICATOR.

l l OPERATOR ACTIONS FOR A VALID ALARM:

I o VERIFY PROPER OPERATION OF MSR "D" DUMP VALVE, HDV-40.

o VERIFY PROPER OPERATION OF MSR "D" LEVEL CONTROL VALVE HDV-36.

l l

l DISCUSSION:

t DRAINS FROM THE "D" MSR LP DRAIN TANK GO TO FWHE-5B SHELL SIDE.

()

REFERENCES:

DRAWING 208-065 SHEET HD-018 SENSING ELEMENT: HD-45-LS AR-602 Rev. 14 Page 50

i.

8 n ENCLOSURE 1 (Page 50 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-01 N-05-01 I

l ___ i I i l I CDSTE HTR 2A/B

! I I LEVEL HIGH l l I I I I I I EVENT POINT 0272 INDICATED CONDITION: l l

l. O CONDENSATE HEATER 2A LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY I HD-24-LS.

! O l

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDHE-2A LOCAL SIGHTGLASS.

l OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-113 OPEN.

o VERIFY HEATER CONTROL VALVE, HDV-111 OPEN.

I L

DISCUSSION:

i A HIGH-HIGH LEVEL IN CDHE-2A WILL TRIP THE TURBINE;2' 7 1/4" ABOVE NWL AS SENSED BY HD-169-LS (NWL = 124' 2 3/4" ELEV.)

CDHE-2A HAS NO EXTRACTION NON-RETURN VALVE.

REFERENCES:

DRAWING 208-065 SHEET HD-05 SENSING ELEMENT: HD-24-LS AR-602 Rev. 14 Page 51 l

\ -

ENCLOSURE 1

/ 't (Page 51 of 76)

,V l TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-01 N-05-01 1

ZZ Z

! I 1

l l CDSTE HTR 2A/B )

I LEVEL I

HIGH I

I I

1 l EVENT POINT 0275 l

)

l INDICATED CONDITION:

o CONDENSATE HEATER 2B LEVEL >8.3" ABOVE NORMAL WATER LEVEL AS SENSED BY HD-26-LS.

O

!V REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o CDHE-28 LOCAL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-114 OPEN.

o VERIFY HEATER CONTROL VALVE, HDV-112 OPEN.

l DISCUSSION:

A HIGH-HlGH LEVEL IN CDHE-28 WILL TRIP THE TURBINE ; 2' 7 1/4" ABOVE NWL AS SENSED BY HP-170-LS (NWL = 124' 2 3/4" ELEV.)

CDHE-28 HAS NO EXTRACTION NON-RETURN VALVE. '

l.

i

REFERENCES:

DRAWING 208-065 SHEET HD-05 LJ SENSING ELEMENT: HD-26-LS  !

I AR-602 Rev. 14 Page 52 i

(

f.

l .

l-ENCLOSURE 1

(G)

(Page 52 of 76)

! TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-02 N-05-02 l

1 l

CNDSTE HTR 2A/B DUMP VALVES NOT FULL CLOSED i

EVENT POINT 0273 l INDICATED CONDITION:

l l o CONDENSATE HEATER 2A fJMP VALVE, HDV-113 NOT FULL CLOSED.

I REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL VALVE POSITION.

o CDHE-2A LEVEL HIGH.

OPERATOR ACTIONS FOR A VALID ALARM:

1 o VERIFY PROPER CDHE-2A LEVEL CONTROL VALVE, HDV-111 OPERATION.

l t

i DISCUSSION:

A HIGH LEVEL IN CDHE-2A WILL OPEN THE DUMP VALVE.

l A TURBINE TRIP AS SENSED BY LOW AUTO-STOP OIL PRESSURE WILL OPEN THE DUMP VALVE.

l

REFERENCES:

DRAWING 208-065 SHEET HD-05 SENSING ELEMENT: CLOSED CONTACT ON VALVE.

AR-602 Rev. 14 Page 53 I

lni ENCLOSURE 1 (Page 53 of 76) l TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-02 N-05-02 CNDSTE HTR 2A/B DUMP VALVES NOT FULL CLOSED EVENT POINT 0276 INDICATED CONDITION:

o CONDENSATE HEATER 28 DUMP VALVE, HDV-114 NOT FULL CLOSED.

C%
t)

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL VALVE POSITION.

o CDHE-2B LEVEL HIGH.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY PROPER CDHE-28 LEVEL CONTROL VALVE, HDV-112 OPERATION.

DISCUSSION:

A HIGH LEVEL IN CDHE-28 WILL OPEN THE DUMP VALVE.

A TURBINE TRIP AS SENSED BY LOW AUTO-STOP OIL PRESSURE WILL OPEN THE DUMP VALVE.

(

REFERENCES:

DRAWING 208-065 SHEET HD-05 SENSING ELEMENT: CLOSED CONTACT ON VALVE.

AR-602 Rev. 14 Page 54

(] ENCLOSURE 1 (Page 54 of 76)

Qi TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-03 N-05-03 DEAERATOR-LEVEL HIGH-HIGH 1 .

EVENT POINT 0303 INDICATED CONDITION:

o DEAERATOR DUMP VALVE HDV-83, NOT FULL CLOSED.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o DEAERATOR LEVEL INDICATION READS >12' 3 1/2".

o LOCAL DEAERATOR SIGHTCLASS LEVEL.

o CASCADE DRAIN VALVES TO THE DEAERATOR, HDV-53 AND HDV-54 CLOSE.

OPERATOR ACTIONS FOR A VALID ALARM:

o REDUCE CONDENSATE FLOW TO THE DEAERATOR.

o VERIFY DEAERATOR LEVEL IS DECREASING.

DISCUSSION:

THIS ALARM DOES NOT ACTUATE ON HIGH DEAERATOR LEVEL IT ONLY COMES OFF OF HDV-83 POSITION.

l (a

REFERENCES:

DRAWING 208-065 SHEET HD-08 SENSING ELEMENT: HDV-83 CLOSED LIMIT SWITCH AR-602 Rev. 14 Page 55 l

p.

~

i f*

l .

l

\

ENCLOSURE 1 l (Page 55 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-05 N-05-05 FW HTR 3/5/6 LEVEL

)

LOW EVENT POINT 0277 INDICATED CONDITION:

l o CONDENSATE HEATER 3A LEVEL IS LOWER THAN 1.5" BELOW NORMAL WATER LEVEL AS SENSED BY HD-175-LS REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIG'HTCLASS.

, OPERATOR ACTIONS FOR A VALID ALARM:

l o VERIFY HEATER DUMP VALVE, HDV-123 CLOSED.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-119.

DISCUSSION:

REFERENCES:

DRAWING 208-065 SHEET HD-07 SENSING ELEMENT: HD-175-LS AR-602 Rev. 14 Page 56 l

w 1

,(s)

I

x _-

ENCLOSURE 1 (Page 56 of 76) s TGF-N ANNUNCIATOR RESPONSE TGF- AX2-05-05 N-05-05 FVV HTR 3/5/6 LEVEL LOVV 4

EVENT POINT 0280 INDICATED CONDITION:

o CONDENSATE HEATER 3B LEVEL IS LOWER THAN 1.5" BELOW NORMAL WATER LEVEL AS SENSED BY HD-176-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIGHTGLASS.

l OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-124 CLOSED.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-120.

DISCUSSION:

'( )

REFERENCES:

DRAWING 208-065 SHEET HD-07 SENSING ELEMENT: HD-176-LS AR-602 Rev. 14 Page 57

- (~~N3 ENCLOSURE 1 (j (Page 57 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-05 N-05-05 FW HTR 3/5/6 LEVEL LOW EVENT POINT 0283 INDICATED CONDITION:

o FEEDWATER HEATER SA LEVEL IS LOWER THAN 2.5" BELOW NORMAL WATER LEVEL AS SENSED BY HD-177-L5.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL SIGHTGLASS.

)

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-55 CLOSED.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-53.

DISCUSSION:

l

REFERENCES:

DRAWING 208-065 SHEET HD-09 SENSING ELEMENT: HD-177-L5 AR-602 Rev. 14 Page 58 l

r.

> 1 ENCLOSURE 1 J (Page 58 of 76) 3

\

TGF-N ANNUNCIATOR RESPONSE TGF- AX2-05-05 N-05-05 l

FW HTR 3/5/6 LEVEL (

LOW c .

l EVENT POINT 0286 INDICATED CONDITION:

o FEEDWATER HEATER 3B LEVEL IS LOWER THAN 2.5" BELOW NORMAL WATER LEVEL AS SENSED BY HD-178-LS. )

' O)(.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

l o LOCAL HEATER LEVEL SIGHTGLASS.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-56 CLOSED.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-54.

l l

l DISCUSSION:

I

/

REFERENCES:

DRAWING 208-065 SHEET HD-09 V

SENSING ELEMENT: HD-178-LS AR-602 Rev. 14 Page 59

s O ENCLOSURE 1 (Page 59 of 76) l 1

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-05 N-05-05 FW HTR 0/5/6 LEVEL LOW i

EVENT POINT 0289 INDICATED CONDITION:

o FEEDWATER HEATER 6A (FWHE-3A) LEVEL IS LOWER THAN 2" BELOW NORMAL WATER LEVEL AS SENSED BY HD-179-LS.

O V

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-63 CLOSED.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-61.

DISCUSSION:

l l

1

REFERENCES:

DRAWING 208-065 SHEET HD-11 l i

SENSING ELEMENT: HD-179-LS '

l I I AR-602 Rev. 14 Page 60 l l

]

e I

e3 ENCLOSURE 1

) (Page 60 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-05 N-05-05 FW HTR 3/5/6 LEVEL LOW EVENT POINT 0292 INDICATED CONDITION:

o FEEDWATER HEATER 6B (FWHE-3B) LEVEL IS LOWER THAN 2" BELOW NORMAL WATER LEVEL AS SENSED BY HD-180-LS. '

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL HEATER LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o VERIFY HEATER DUMP VALVE, HDV-64 CLOSED.

o VERIFY PROPER OPERATION OF HEATER LEVEL CONTROL VALVE, HDV-62.

DISCUSSION:

REFERENCES:

DRAWING 208-065 SHEET HD-11 SENSING ELEMENT: HD-180-LS AR-602 Rev. 14 Page 61

f_NCLOSURE 1 (J (Page 61 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-05-07 N-05-07 MS VLV TO AS/DEATR NOT FULL OPEN EVENT POINT 0957 I

INDICATED CONDITION:

o MAIN STEAM SUPPLY TO AUXILIARY STEAM ISOLATI0t' VALVE MSV-179, NOT FULL OPEN.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o VALVE POSITION INDICATION.

)

o LOCAL VALVE POSITION. '

I OPERATOR ACTIONS FOR A VALID ALARM:

o IF PLANT CONDITIONS REQUIRE MSV-179 TO BE OPENED THEN OPEN MSV-179.

DISCUSSION:

l l

I

REFERENCES:

DRAWING 208-039 SHEET MS-15 y/

SENSING ELEMENT: VALVE OPEN CONTACTS.

I AR-602 Rev. 14 Page 62

+

l ENCLOSURE 1 I %b) l (Page 62 of 76) l TGF-N ANNUNCIATOR RESPONSE TGF-A"?-05-07 N-05-07 l

l MS VLV TO AS/DEATR NOT FULL OPEN l

E EVENT POINT 0958 INDICATED CONDITION:

o l',AIN STEAM SUPPLY TO THE DEAERATOR ISOLATION VALVE MSV-180, NOT FULL OPEN.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

I o VALVE POSITION INDICATION.

o LOCAL VALVE POSITION.

OPERATOR ACTIONS FOR A VALID ALARM:

o IF PLANT CONDITIONS REQUIRE MSV-180 TO BE OPENED THEN OPEN MSV-180.

DISCUSSION:

REFERENCES:

DRAWING 208-039 SHEET MS-16  !

SENSING c.LEMENT: VALVE OPEN CONTACTS.

I i

l AR-602 Rev. 14 Page 63 l

-m ENCLOSURE 1

( (Page 63 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-01 N-06-01 l I I I EH FLUID PUMP I I TRIP l I I I I i l l l l EVENT POINT 1600

~

INDICATED CONDITION:

o TBP-7A BREAKER OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT IS ON WITH RED FLAG ON TBP-7A CONTROL STATION.

o EH SYSTEM PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE TBP-78 IS RUNNING.

o INVESTIGATE CAUSE OF TBP-7A TRIP.

DISCUSSION:

IF NO EHC PUMPS CAN BE STARTED THEN CONSIDERATION SHOULD BE GIVEN TO TRIPPING THE MAIN TURBINE.

A LOW-LOW LEVEL IN THE EHC TANK WILL TRIP THE EHC LOCK 0UT RELAY WHICH WILL TRIP BOTH EHC PUMPS AND PREVENT THEIR RESTART UNTIL THE LOCKOUT IS RESET.  !

l

[

REFERENCES:

DRAWING 208-057 SHEET TB-01 SENSING ELEMENT: CONTROL SWITCH AND BREAKER CONTACTS AR-602 Rev. 14 Page 64 l

(* ,

i 1*

] ENCLOSURE 1 (Page 64 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-01 N-06-01 I I I I EH FLUID PUMP I I TRIP l i I I I I I I I I EVENT POINT 1602 i

INDICATED CONDITION:

o TBP-78 BREAKER OPEN WITH CONTROL HANDLE IN THE NORMAL AFTER START POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o GREEN LIGHT IS ON WITH RED FLAG ON TBP-7B CONTROL STATION.

o EH SYSTEM PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o ENSURE TBP-7A IS RUNNING.

i i

o INVESTIGATE CAUSE OF TBP-78 TRIP.

I DISCUSSION:

IF NO EHC PUMPS CAN BE STARTED THEN CONSIDERATION SHOULD BE GIVEN TO TRIPPING THE MAIN TURBINE.

A LOW-LOW LEVEL IN THE EHC TANK WILL TRIP THE EHC LOCKOUT RELAY WHICH WILL t

TRIP BOTH EHC PUMPS AND PREVENT THEIR RESTART UNTIL THE LOCKOUT IS RESET.

i

REFERENCES:

DRAWING 208-057 SHEET TB-02 SENSING ELEMENT: CONTROL SWITCH AND BREAKER CONTACTS AR-602 Rev. 14 Page 65

l l=

l.

ENCLOSURE _1 (O) (Page 65 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-02 N-06-02 EH FLUID SUPPLY PRESS LOVV EVENT POINT 1609 INDICATED CONDITION:

o EHC SUPPLY PRESSURE <1600 PSIG AS SENSED BY TB-243-PS.

'O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o EH SUPPLY PRESSURE INDICATOR TB-240-PI (MCB). j o LOCAL EH SUPPLY PRESSURE INDICATION.  !

OPERATOR ACTIONS FOR A VALID ALARM:

o PLACE STANDBY EHC PUMP IN SERVICE.

o INVESTIGATE THE LOW PRESSURE CONDITION.

DISCUSSION:

STANDBY EHC PUMP SHOULD AUTO START WHEN EHC PRESSURE DROPS TO <1350 PSIG.

l

()

REFERENCES:

DRAWING 208-057 SHEET TB-16 SENSING ELEMENT: TB-243-PS I AR-602 Rev. 14 Page 66

l r}

\s,/

ENCLOSURE 1 (Page 66 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-03 N-06-03 i

EH FLUID l

TANK LEVEL LOW l

EVENT POINT 1605 INDICATED CONDITION:

o EH FLUID TANK LEVEL <I7.25" AS SENSED BY TB-236-LS.

i t

'x_-

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o ADD EH FLUID TO EH TANK TO RAISE LEVEL.

o INVESTIGATE EH SYSTEM FOR LEAKS.

l DISCUSSION:

THIS LEVEL SWITCH ALSO FEEDS THE INPUT TO THE EH FLUID LOCK 0UT RELAY WHICH =

ACTUATES AT 7 5/8" TANK LEVEL TRIPPING AND LOCKING OUT TBP-7A AND TBP-78.

THE LOCK 0UT CAN BE DEFEATED BY TURNING THE LOCKOUT DC POWER OFF AND THEN l

RESETTING THE LOCK 0UT (" TURBINE GENERATOR REAR" - MCB). DO NOT HOLD A i-LOCKOUT IN THE RESET P05..' ION WITH A STANDING TRIP SIGNAL PRESENT. THIS l ACTION WILL BURN OUT THE RELAY COIL.

l lO j

REFERENCES:

DRAWING 208-057 SHEET TB-16 SENSING ELEMENT: TB-236-LS AR-602 Rev. 14 Page 67

\' .

i s

ENCLOSURE 1

-s) (Page 67 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-03 N-06-03 1

EH FLUH)

TANK LEVEL LOVV I .

EVENT POINT 1606 INDICATED CONDITIDN:

o EH FLUID TANK LEVEL <11 5/8" AS SENSED BY TB-235-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

l o LOCAL TANK LEVEL INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o ADD EH FLUID TO EH TANK.

o INVESTIGATE EH SYSTEM FOR LEAKS.

l DISCUSSION:

EHC LOW LEVEL LOCK 0UT OF TBP-7A AND TBP-78 h7LL OCCUR WHEN EH TANK DROPS TO <7 5/8".

1

(

REFERENCES:

DRAWING 208-057 SHEET TB-16 f

SENSING ELEMENT: TB-235-LS d AR-602 Rev. 14 t

Page 68

l'.

t i.

t ,

f

/^ ENCLOSURE 1

( (Page 68 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-03 N-06-03 l

EH FLUID TANK LEVEL LOVV EVENT POINT 1607 INDICATED CONDITION:

o EHC LOW LEVEL LOCKOUT HAS ACTUA1ED CAUSED BY EH FLUID TANK LEVEL <7 5/8" AS SENSED BY TB-236-LS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL TANK LEVEL INDICATOR.

o BOTH EHC PUMF TRIP AND WILL NOT RESTART.

OPERATOR ACTIONS FOR A VALID ALARM:

o CONSIDERATION SHOULD BE GIVEN TO TRIPPING THE TURBINE.

o ADD EH FLUID TO EH TANK.

o INVESTIGATE EH SYSTEM FOR LEAKS.

DISCUSSION:

THIS LEVEL SWITCH ALSO FEEDS THE INPUT TO THE EH FLUID LOCKOUT RELAY WHICH ACTUATES AT 7 5/8" TANK LEVEL TRIPPING AND LOCKING OUT TBP-7A AND TBP-78.

THE LOCKOUT CAN BE DEFEATED BY TURNING THE LOCKOUT DC POWER OFF AND THEN RESETTING THE LOCKOUT (" TURBINE GENERATOR REAR" - MCB). DO NOT HOLD A LOCK 0UT IN THE RESET POSITION WITH A STANDING TRIP SIGNAL PRESENT. THIS

, ACTION WILL BURN OUT THE RELAY COIL.

'(

REFERENCES:

DRAWING 208-057 SHEET TB-16 SENSING ELEMENT: TB-236-LS AR-602 Rev. 14 Page 69

N i

I ENCLOSURE 1 (Page 69 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-04 N-06-04 l

TURB EHC ON MANUAL l

l EVENT POINT 1238 INDICATED CONDITION:

o TURBINE CONTROL NOT IN "0PERATOR ICS".

lO REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

, o UNIT IS IN TRACK

( o INDICATION ON TURBINE CONTROL PANEL.

1 OPERATOR ACTIONS FOR A VALID ALARM:

o DETEkMINE IF TURBINE NEEDS TO BE IN ICS AUTO.

o PLACE TURBINE IN AUTO.

DISCUSSION:

i TURBINE SHIFTS TO MANUAL IF ANY OF THE FOLLOWING OCCURS:

TURBINE TRIP, HEADER PRESSURE ERROR OF +/- 50 PSIC, SPEED REFERENCE FAILURE, LOAD REFERENCE FAILURE, MAIN SPEED CHANNEL FAILURE.

1

- ()

REFERENCES:

ICS DRAWINGS SENSING ELEMENT: CONTACTS IN THE ICS SYSTEM i AR-602 Rev. 14 Page 70 L

ENCLOSURE 1 (Page 70 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-05 N-06-05 EH FLUID PUMP AUTO START l

EVENT POINT 1601 INDICATED CONDITION:

o TBP-7A BREAKER CLOSED AND CONTROL STATION IN THE NORMAL AFTER STOP POSITION.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT IS ON AND GREEN FLAG ON TBP-7A CONTROL STATION. t o EH FLUID PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF TBP-7A AUTO START.

o VERIFY PROPER EH FLUID PRESSURE.

DISCUSSION:

STANDBY EHC PUMPS WILL AUTO START WHEN EH SYSTEM PRESSURE DROPS TO <1350 PSIG.

l

REFERENCES:

DRAWING 208-057 SHEET TB-01 SENSING ELEMENT: CONTROL SWITCH AND BREAKER CONTACTS AR-602 Rev. 14 Page 71 l

i

I ,-. ENCLOSURE 1 l(

'\ (Page 71 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-05 N-06-05 l'

EH FLUID PUMP AUTO START EVENT POINT 1603 INDICATED CONDITION:

I o TBP-78 BREAKER CLOSED AND CONTROL STATION IN THE NORMAL AFTER STOP POSITION.

'V REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o RED LIGHT ON AND GREEN FLAG ON TBP-78 CONTROL STATION.

o EH FLUID PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF TBP-78 AUTO START.

o VERIFY PROPER EH FLUID PRESSURE.

i DISCUSSION:

STANDBY EHC PUMPS WILL AUTO START WHEN EH SYSTEM PRESSURE DROPS TO

<1350 PSIG.

l h

v

REFERENCES:

DRAWING 208-057 SHEET TB-02 SENSING ELEMENT: CONTROL SWITCH AND BREAKER CONTACTS.

AR-602 Rev. 14 Page 72

F.

l g

es ENCLOSURE _1 1 ) (Page 72 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-06 N-06-06 l

i I

EH FLUlD SYSTEM TROUBLE I

EVENT POINT 1604 INDICATED CONDITION:

o EH FLUID TANK LEVEL >22" AS SENSED BY TB-235-LS.

D (V \

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o LOCAL TANK INDICATOR.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH LEVEL.

o HAVE CHEMISTRY SAMPLE THE EH FLUID FOR EVIDENCE OF WATER.

o DRAIN FLUID AS NECESSARY.

DISCUSSION:

~q '

THIS IS AN EXPECTED ALARM WHEN THE TURBINE TRIPS.

REFERENCES:

DRAWING 208-057 SHEET B-16 SENSING ELEMENT: TB-235-LS AR-602 Rev. 14 Page 73

f. .

,6 I ENCLOSURE 1 1' (Page 73 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-06 N-06-06 l

j EH FLUID SYSTEM TROUBLE EVENT POINT 1608 INDICATED CONDITION:

o EH FLUID SYSTEM PRESSURE >2200 PSIG AS SENSED BY TB-239-PS.

O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o EH SYSTEM PRESSURE IND'ICATION TB-240-PI.

o LOCAL EH SYSTEM PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH PRESSURE.

o CONTACT I&C SHOP REGARDING THE HIGH PRESSURE CONDITION.

o PLACE STANDBY EHC PUMP IN SERVICE.

DISCUSSION:

THIS ALARM MAY INDICATE A CLOGGED EH PUMP DISCHARGE FILTER, AND/OR A FAILED CLOSED UNLOADER VALVE.

l f

()

REFERENCES:

DRAWING 208-057 SHEET TB-16 SENSING ELEMENT: TB-239-PS AR-602 Rev. 14 Page 74

O l .

ENCLOSURE 1 1 (Page 74 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-06 N-06-06 EH FLUID SYSTEM TROUBLE EVENT POINT 1610 INDICATED CONDITION:

o EH FLUID SYSTEM DRAIN RETURN PRESSURE >30 PSIG AS SENSED BY TB-237-PS.

'/O

,G REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

i o EH SYSTEM PRESSURE INDICATION TB-240-PI.

o LOCAL EH SYSTEM PRESSURE INDICATION.  !

e OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH PRESSURE.

o CONTACT I&C SHOP REGARDING THE HIGH PRESSURE CONDITION.

3 o PLACE STANDBY EHC FILTER / COOLER IN SERVICE. I DISCUSSION:

THIS ALARM MAY INDICATE A CLOGGED EH PUMP DRAIN FILTER OR COOLER.

I 1

REFERENCES:

DRAWING 208-057 SHEET TB-16

} SENSING ELEMENT: TB-237-PS AR-602 Rev. 14 Page 75

f.

O.

<~' ENCLOSURE 1 (p) (Page 75 of 76) j TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-06 N-06-06 1

l EH FLUH)

SYSTEM TROUBLE EVENT POINT 1611 INDICATED CONDITION:

o TBP-7A DISCHARGE FILTER AP >100 PSID AS SENSED BY TB-231-PS.

REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o EH SYSTEM PRESSURE INDICATION TB-240-PI.

o LOCAL EH SYSTEM PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH PRESSURE.

o PLACE TBP-7B PUMP IN SERVICE.

o CONTACT I&C SHOP REGARDING THE HIGH PRESSURE CONDITION.

o CHANGE OUT EHC DISCHARGE FILTER.

DISCUSSION:

THIS FILTER IS ON THE DISCHARGE OF TBP-7A, AND IS LOCATED IN THE EH PUMP MANIFOLD BLOCK ON THE TOP OF THE EH RESERVOIR.

i

()

r

REFERENCES:

DRAWING 208-057 SHEET TB-16 SENSING ELEMENT: TB-231-PS l

AR-602 Rev. 14 Page 76

lO-

,- ENCLOSURE 1

!(u) (Page 76 of 76)

TGF-N ANNUNCIATOR RESPONSE TGF-AX2-06-06 N-06-06 l

EH FLUID SYSTEM TROUBLE S

EVENT POINT 1612 INDICATED CONDITION:

l o TBP-78 DISCHARGE FILTER AP >100 PSID AS SENSED BY TB-232-PS.

'O REDUNDANT INDICATION WHICH WILL VERIFY ALARM:

o EH SYSTEM PRESSURE INDICATION TB-240-PI. j o LOCAL EH SYSTEM PRESSURE INDICATION.

OPERATOR ACTIONS FOR A VALID ALARM:

o INVESTIGATE CAUSE OF HIGH PRESSURE.

o PLACE STANDBY PUMP AND FILTER IN SERVICE.

o CONTACT I&C SHOP REGARDING THE HIGH PRESSURE CONDITION.

o CHANGE OUT EHC DISCHARGE FILTER.

DISCUSSION:

THIS FILTER IS ON THE DISCHARGE OF TBP-78, AND IS LOCATED IN THE EH PUMP MANIFOLD BLOCK ON THE TOP OF THE EH RESERVOIR. 4 1

REFERENCES:

DRAWING 208-057 SHEET 'T, !6

'O

} ()

I%

SENSING ELEMENT: TB-232-PS l