Monthly Operating Repts for Oct 1990 for Beaver Valley Units 1 & 2
ML20217A785
Person / Time
Site: Beaver Valley
Issue date: 10/31/1990
From: Seiber J, Winger M
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9011260051
Download: ML20217A785 (9)


Text

_ _. _. _..............

g M.

_.1

(*l

'Af T elephone (412) 393-6000 Nuclear Group P O Don 4 -

Shippingport. PA 15077-0004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket ras. 50-412, License No. NPF-73

- Monthly Ooeratirn Reoort

?l

-U. S.= Nuclear Regulatory Commission Document Control Deu Washington, D.C..

20555 Gentlemen:.

In.,accordance with' Appendix A, _ Technical: Specifications,. the-Monthly Operating Report is subnitted for Unit 'l and Unit 2 for the month of October,.

1990.

Very truly yours,

. D. Sieber Vjoe President-N.1 clear Group N/mg Enclosures

-cc: NRC Regional Office King of Prussia, PA g[

9011260051 901031

+

PDR ADOCK 05000334 r

8 R

PDC l

i e

~ '.'

NARRATIVE SLM ERY OF 10NIELY OPERATING EXPERIENCE LNIT I J

OCIOBER 1990 L

1 a

October 1

'Ihe Unit operated at a ncuninal value of 100% output.

thruxjh

.l October 5 October 6 At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> the Unit's output was reduced to approximately.

30% to~ load follow.

At 0433 hours0.00501 days <br />0.12 hours <br />7.159392e-4 weeks <br />1.647565e-4 months <br />, during partial C:roke testing the "B" Main Steam Isolation Valve closed. At 0448, the Unit was removed frcan service.-

At- 0455 hours0.00527 days <br />0.126 hours <br />7.523148e-4 weeks <br />1.731275e-4 months <br /> the reactor went subcritical, s

l' October 7

'Ibe Unit remained shutdown to repair the "C" Main Steam through Line Isolation Valve.

October 8.

October 9

'At 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> the reactor was taken critical.

s.

October 10 At,1219 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.638295e-4 months <br />, the unit was synchronized erzi the Unit's output was escalated to a rxxninal value of 100%.

October'lll

'Ihe Unit operated at a ncaninal value of 100% output.

throujh October 31 1

y 1

.l

y

~

~

' AVERAGE DAILY UNIT K MER IEVEL

(

l Docket No.

50-334 Unit BVPS Unit 1 Date November 7, 1990 Coripleted by M. A. W1rner Telephone (412) 393-7621

}ORIH OCTOBER 1990 DAY AVERAGE DAILY POWER LEVEL DAY

. AVERAGE DULY POWER LEVEL i

(MWe-Net)

(MWe-Net) i

.1 817 17 808 2

813 18 806 3

808 19 814 4

800 20 816 s

' 5L 808 21 808 l.

-6 29 22 804 7

O 23 813

-8 0

24 817 l'

9 0

25 813 1"

10 204 26 821

~796 27 800 11 12 804 28 820'

.13 804 29 813 14 808 30 804 4

15~

813 31 808 16-808

- INSIRUCI' ICES

~On this format, list the average daily unit power level in }We-Net for each day in.the reporting month. Ccupute to the nearest whole megawatt.

L

[,' d

  • i !

f OPERATING DATA REPORT DOCKET NO.:

50-334 REPORT DATE:

11/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393 7621 OPERATING STATUS

.l. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes

2. REPORTING PERIOD: OCTOBER 1990
3. LICENSED THERMAL POWER (MWt):

2652

4. NAMEPIATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Het MWe):

835

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES' OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
9. - POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None 10.-REASONS FOR RESTRICTIONS, IF ANY:

N/A e

THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

745.0" 7296.0 127128.0

12. NO, OF HRS. REACTOR WAS CRITICAL:

653.0 6746.1 78884.6 4

13. REACTOR ~ RESERVE SHUTDOWN HOURS:

0.0-0 '0 4482.8

.14. HOURS GENERATOR WAS ON LINE:

641.5 6686.5 77154.0

15. UNIT. RESERVE.SHUTDOWNLHOURS:

0.0 0.0 0,0 16.? GROSS THERMAL ENERGY GEN.-(MWH):

1671278.0 16872001.0

.182952056.5

17. GROSS ELECT -ENERGY-GEN (MWH):

543790.0-5482410.0 58752099 0 18, NET ELECTRICAL ENERGY GEN. (MWH):

-509120.0 5151370,0 548485:

0

19. UNIT SERVICE FACTOR:-(PERCENT).

86.1 91.6 62.9 120.-UNIT.-AVAILABILITY FACTOR:(PERCENT) 86.1 91.6 62.9

-21._ UNIT CAPACITY FACTOR (MDC): PCT 84.4 87.2 56.2 22.. UNIT CAPACITY FACTOR-(DER): PCT 81.'8 84.6 54.5 23.= UNIT. FORCED OUTAGE RATE: (PERCENT)

-13.9 4.0-16.5 124; SHUTDOWNS SCHEDULED OVER NFXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

'THE UNIT IS SCHEDULEn TO SHUTDOWN FOR THE UNIT'S 8TH REFUELING OUTAGE ON APRIL 12.1991.THE UNIT IS SCHEDULED TO EE OFF LINE FOR 10 WEEKS.

25. IF.' SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF 'STARTUP:

~26. UNITS _IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED' INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A___

COMMERCIAL OPERATION N/A N/A

.6-

  • I lQ 4

~

UNIT SMUTDOWNS AND POWER REDUCTIONS

~ Docket No.

50-334' Unit Name BVPS Unit #1 Date.

November T.

1970 Completed By.

M.A.

Wineer REPORT MONTH OCTOBER 1990 Telephone (412) 393-7621 Method of Licensee Cause &' Corrective

-Duration Shutting Event System Component Action to.

Ca.

Date Typel (Nours)

Reason 2 Down Reactor 3

-Report.#

code 4 Code 5 Prevent Recurrence 33 901006 S

.0 N

5 N/A ZZ ZZZZZZ Unit's output reduced to 30% to Load follow.

34 901006' F

103.5 A'

'1 1-90-15 CD VALVEX The Unit was removed from service to Re-open the "B" Main Steam Line Isolation Valve and to repair the "C" Main Steam Line Isolation Valve.

1 2

-3 4-F-Forced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual-Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd. from Previous Month E-operator Training & License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit I-Same Source.

G-operational Error (Explain)

NaOther (Explain)

_ ~ _

a

NARRATIVE E M RRY OF

)ONIHLY OPERATING EXPERIENCE LNIT II OC'ICBER 1990 h-October 1

'Ihe Unit was shutdown for the Unit's second refueling through outage.

October 9 l __

October-10 At 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br /> the Unit entered Mode 6.

October 11

'Ihe Unit remained in itx$e 6. -

through October 16 October 17 At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> the Unit entered Mode 5.

Octnhar 18

'Ibe Unit remained in Mode 5 to prepare to enter Mode 4.

through

~

Ocknhar 31-i i

---r-

.i r

1 I

^Ut!T SHUTDOWWS AND POWER REDUCTIONS Docket No.

!0-412 Unit.Name SVPS Unit-#2 Date.

november 7.

1990 Completed By--

M.A.

Wineer REPORT NOWTM.. OCTOBER'1990 Telephone-(412) 393-7621 Duration-

. Shutting...

_ Event' Cause & Corrective Method of-Licensee.

System Component

. Action to l

Co.

Date Type 1' (Nours)-

Reason 2'

.Doun Reactor 3'

- Report #-

Code 4-Code 5 Prevent Recurrence l

1 27 901001 5

745 C

4..

LN/A RC FUELXX The unit remained shutdown for the j

unit's'second refueling outage.

l 4

1 2

3

'4 F-Fcrced Reason:

Method:

Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram-(4UREG0161).

D-Regulatory Restriction

'4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5

F-Administrative 9-Other Exhibit I-Same Source.

G-Operational Error-(Explain)

M-Other (Explain)

_. ~

m u.

m

lg? -

~

OPERATING DATA REPORT DOCKET NO.:

S0 412 REPORT DATE:. 11/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:

(412) 393 7621 OPERAIING STATUS

1. UNIT. NAld.E: BEAVER VALLEY POWER STATION, UNIT 2 Notes
2. P.EPORTItG PERIOD: OCTOBER 1990
3. LICENSEL THERMAL POWER (MWt):

2652

4. NAMEPIA'TE RATING. (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

836

6. MAX, DUPENDABLE CAPACITY.(Gross MWe):

870

7. MAX. DEPENDABLE CAPACITY (Net MWe):

820

8. IF CHAMGES OCCUR:IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

'9.

POWER. LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A

'THIS MONTH- ' YEAR TO DATE CUMULATIVE.

11. HOURS IN REPORTING ~ PERIOD: '

745.0 7296.0 25911.0 i

-12. NO. OF HRS. REACTOR WAS CRITICAL:

=0.0 5793.9 21350.7 13,' REACTOR RESERVE SHUTDOWN 110URS:

0.0

'0.0 0.0

14. HOURS. GENERATOR WAS ON LINE:

0.0 5786.0 21212,9

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 16', ~ GROSS 'THEPJiAL ENERGY GEN.:L(MWH):

0.0 11976580.0-50789324,4 17.- GROSS ELECT.' ENERGY -GEN.< (MWil):

0.0 3817400,0 16283500.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

-2351,0 3582738.0 15339213.0

19. UNIT SERVICE FACTOR: (PERCENT) 0.0 79.3 81.9
20. UNIT AVAILABILITY FACTOR:(PERCENT)-

0.0-79;3

-81.9

21. UNIT. CAPACITY FACTOR =(MDC); PCT 0.0-59.1

'71.1

22. UNIT CAPACITY FACTOR (DER): PCT 0.0-58.7 70.8 23.. UNIT FORCED OUTAGE-RATE: (PERCENT) 0.0 1.9' 54-
(

~24. SHUTDOWNS SCHEDULED OVER'NEXT SIX MONTilS (TYPE,DATE,AND DURATION OF EACH):

25' IF. SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOV 14.1990

.26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED I

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

4...~,--

AVD%GE DAILY LNIT POWER LEVEL Docket No.

50-412 Unit BVPS Unit 2 Date Nov==har 7, 1990 Catpleted by M. A. Wimer Telephone-(412)393-7621 M0tml OCIOBER 1990 DAY AVDMGE DAILY POWER 11 VEL DAY AVERAGE DAILY PCMER LEVEL (pee-Net)

()Me-Net) l' O

17 0

2~

'O' 18 0

l3;

'0 19

'O

-4 O

20 0

5.

0-21 0

6-0 22 0

17:

0 23 0

~8 0

-24 0

' 9.-

0 25 0

10 0

26 0

'11:

0

- 27 '

-0 12

^0 28 0

13 0

29 0

14 O

30 0

.15 -

0 31 0

'16-0 INSTRUCTIONS on this format, list the average daily unit power level in PWe-Net for each day in the reporting month. Cenpute to the nearest whole megawatt.

l l.