'Af T elephone (412) 393-6000 Nuclear Group P O Don 4 -
Shippingport. PA 15077-0004 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket ras. 50-412, License No. NPF-73
- Monthly Ooeratirn Reoort
?l
-U. S.= Nuclear Regulatory Commission Document Control Deu Washington, D.C..
20555 Gentlemen:.
In.,accordance with' Appendix A, _ Technical: Specifications,. the-Monthly Operating Report is subnitted for Unit 'l and Unit 2 for the month of October,.
1990.
Very truly yours,
. D. Sieber Vjoe President-N.1 clear Group N/mg Enclosures
-cc: NRC Regional Office King of Prussia, PA g[
9011260051 901031
+
PDR ADOCK 05000334 r
8 R
PDC l
i e
~ '.'
NARRATIVE SLM ERY OF 10NIELY OPERATING EXPERIENCE LNIT I J
OCIOBER 1990 L
1 a
October 1
'Ihe Unit operated at a ncuninal value of 100% output.
thruxjh
.l October 5 October 6 At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> the Unit's output was reduced to approximately.
30% to~ load follow.
At 0433 hours0.00501 days <br />0.12 hours <br />7.159392e-4 weeks <br />1.647565e-4 months <br />, during partial C:roke testing the "B" Main Steam Isolation Valve closed. At 0448, the Unit was removed frcan service.-
At- 0455 hours0.00527 days <br />0.126 hours <br />7.523148e-4 weeks <br />1.731275e-4 months <br /> the reactor went subcritical, s
l' October 7
'Ibe Unit remained shutdown to repair the "C" Main Steam through Line Isolation Valve.
October 8.
October 9
'At 2355 hours0.0273 days <br />0.654 hours <br />0.00389 weeks <br />8.960775e-4 months <br /> the reactor was taken critical.
s.
October 10 At,1219 hours0.0141 days <br />0.339 hours <br />0.00202 weeks <br />4.638295e-4 months <br />, the unit was synchronized erzi the Unit's output was escalated to a rxxninal value of 100%.
October'lll
'Ihe Unit operated at a ncaninal value of 100% output.
throujh October 31 1
y 1
.l
y
~
~
' AVERAGE DAILY UNIT K MER IEVEL
(
l Docket No.
50-334 Unit BVPS Unit 1 Date November 7, 1990 Coripleted by M. A. W1rner Telephone (412) 393-7621
}ORIH OCTOBER 1990 DAY AVERAGE DAILY POWER LEVEL DAY
. AVERAGE DULY POWER LEVEL i
(MWe-Net)
(MWe-Net) i
.1 817 17 808 2
813 18 806 3
808 19 814 4
800 20 816 s
' 5L 808 21 808 l.
-6 29 22 804 7
O 23 813
-8 0
24 817 l'
9 0
25 813 1"
10 204 26 821
~796 27 800 11 12 804 28 820'
.13 804 29 813 14 808 30 804 4
15~
813 31 808 16-808
- INSIRUCI' ICES
~On this format, list the average daily unit power level in }We-Net for each day in.the reporting month. Ccupute to the nearest whole megawatt.
L
[,' d
- i !
f OPERATING DATA REPORT DOCKET NO.:
50-334 REPORT DATE:
11/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
.l. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTING PERIOD: OCTOBER 1990
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPIATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Het MWe):
835
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES' OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
- 9. - POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None 10.-REASONS FOR RESTRICTIONS, IF ANY:
N/A e
THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745.0" 7296.0 127128.0
- 12. NO, OF HRS. REACTOR WAS CRITICAL:
653.0 6746.1 78884.6 4
- 13. REACTOR ~ RESERVE SHUTDOWN HOURS:
0.0-0 '0 4482.8
.14. HOURS GENERATOR WAS ON LINE:
641.5 6686.5 77154.0
- 15. UNIT. RESERVE.SHUTDOWNLHOURS:
0.0 0.0 0,0 16.? GROSS THERMAL ENERGY GEN.-(MWH):
1671278.0 16872001.0
.182952056.5
- 17. GROSS ELECT -ENERGY-GEN (MWH):
543790.0-5482410.0 58752099 0 18, NET ELECTRICAL ENERGY GEN. (MWH):
-509120.0 5151370,0 548485:
0
- 19. UNIT SERVICE FACTOR:-(PERCENT).
86.1 91.6 62.9 120.-UNIT.-AVAILABILITY FACTOR:(PERCENT) 86.1 91.6 62.9
-21._ UNIT CAPACITY FACTOR (MDC): PCT 84.4 87.2 56.2 22.. UNIT CAPACITY FACTOR-(DER): PCT 81.'8 84.6 54.5 23.= UNIT. FORCED OUTAGE RATE: (PERCENT)
-13.9 4.0-16.5 124; SHUTDOWNS SCHEDULED OVER NFXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
'THE UNIT IS SCHEDULEn TO SHUTDOWN FOR THE UNIT'S 8TH REFUELING OUTAGE ON APRIL 12.1991.THE UNIT IS SCHEDULED TO EE OFF LINE FOR 10 WEEKS.
- 25. IF.' SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF 'STARTUP:
~26. UNITS _IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED' INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A___
COMMERCIAL OPERATION N/A N/A
.6-
- I lQ 4
~
UNIT SMUTDOWNS AND POWER REDUCTIONS
~ Docket No.
50-334' Unit Name BVPS Unit #1 Date.
November T.
1970 Completed By.
M.A.
Wineer REPORT MONTH OCTOBER 1990 Telephone (412) 393-7621 Method of Licensee Cause &' Corrective
-Duration Shutting Event System Component Action to.
Ca.
Date Typel (Nours)
Reason 2 Down Reactor 3
-Report.#
code 4 Code 5 Prevent Recurrence 33 901006 S
.0 N
5 N/A ZZ ZZZZZZ Unit's output reduced to 30% to Load follow.
34 901006' F
103.5 A'
'1 1-90-15 CD VALVEX The Unit was removed from service to Re-open the "B" Main Steam Line Isolation Valve and to repair the "C" Main Steam Line Isolation Valve.
1 2
-3 4-F-Forced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets B-Maintenance or Test 2-Manual-Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd. from Previous Month E-operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit I-Same Source.
G-operational Error (Explain)
NaOther (Explain)
_ ~ _
a
NARRATIVE E M RRY OF
)ONIHLY OPERATING EXPERIENCE LNIT II OC'ICBER 1990 h-October 1
'Ihe Unit was shutdown for the Unit's second refueling through outage.
October 9 l __
October-10 At 0107 hours0.00124 days <br />0.0297 hours <br />1.76918e-4 weeks <br />4.07135e-5 months <br /> the Unit entered Mode 6.
October 11
'Ihe Unit remained in itx$e 6. -
through October 16 October 17 At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> the Unit entered Mode 5.
Octnhar 18
'Ibe Unit remained in Mode 5 to prepare to enter Mode 4.
through
~
Ocknhar 31-i i
---r-
.i r
1 I
^Ut!T SHUTDOWWS AND POWER REDUCTIONS Docket No.
!0-412 Unit.Name SVPS Unit-#2 Date.
november 7.
1990 Completed By--
M.A.
Wineer REPORT NOWTM.. OCTOBER'1990 Telephone-(412) 393-7621 Duration-
. Shutting...
_ Event' Cause & Corrective Method of-Licensee.
System Component
. Action to l
Co.
Date Type 1' (Nours)-
Reason 2'
.Doun Reactor 3'
- Report #-
Code 4-Code 5 Prevent Recurrence l
1 27 901001 5
745 C
4..
LN/A RC FUELXX The unit remained shutdown for the j
unit's'second refueling outage.
l 4
1 2
3
'4 F-Fcrced Reason:
Method:
Exhibit G-Instructions for S-Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data Entry Sheets 8-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueting 3-Automatic Scram-(4UREG0161).
D-Regulatory Restriction
'4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction 5
F-Administrative 9-Other Exhibit I-Same Source.
G-Operational Error-(Explain)
M-Other (Explain)
_. ~
m u.
m
lg? -
~
OPERATING DATA REPORT DOCKET NO.:
S0 412 REPORT DATE:. 11/07/90 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERAIING STATUS
- 1. UNIT. NAld.E: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. P.EPORTItG PERIOD: OCTOBER 1990
- 3. LICENSEL THERMAL POWER (MWt):
2652
- 4. NAMEPIA'TE RATING. (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX, DUPENDABLE CAPACITY.(Gross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHAMGES OCCUR:IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
'9.
POWER. LEVEL TO VHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A
'THIS MONTH- ' YEAR TO DATE CUMULATIVE.
- 11. HOURS IN REPORTING ~ PERIOD: '
745.0 7296.0 25911.0 i
-12. NO. OF HRS. REACTOR WAS CRITICAL:
=0.0 5793.9 21350.7 13,' REACTOR RESERVE SHUTDOWN 110URS:
0.0
'0.0 0.0
- 14. HOURS. GENERATOR WAS ON LINE:
0.0 5786.0 21212,9
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 16', ~ GROSS 'THEPJiAL ENERGY GEN.:L(MWH):
0.0 11976580.0-50789324,4 17.- GROSS ELECT.' ENERGY -GEN.< (MWil):
0.0 3817400,0 16283500.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
-2351,0 3582738.0 15339213.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 0.0 79.3 81.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT)-
0.0-79;3
-81.9
'71.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 0.0-58.7 70.8 23.. UNIT FORCED OUTAGE-RATE: (PERCENT) 0.0 1.9' 54-
- (
~24. SHUTDOWNS SCHEDULED OVER'NEXT SIX MONTilS (TYPE,DATE,AND DURATION OF EACH):
25' IF. SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOV 14.1990
.26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED I
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
4...~,--
AVD%GE DAILY LNIT POWER LEVEL Docket No.
50-412 Unit BVPS Unit 2 Date Nov==har 7, 1990 Catpleted by M. A. Wimer Telephone-(412)393-7621 M0tml OCIOBER 1990 DAY AVDMGE DAILY POWER 11 VEL DAY AVERAGE DAILY PCMER LEVEL (pee-Net)
()Me-Net) l' O
17 0
2~
'O' 18 0
l3;
'0 19
'O
-4 O
20 0
5.
0-21 0
6-0 22 0
17:
0 23 0
~8 0
-24 0
' 9.-
0 25 0
10 0
26 0
'11:
0
- 27 '
-0 12
^0 28 0
13 0
29 0
14 O
30 0
.15 -
0 31 0
'16-0 INSTRUCTIONS on this format, list the average daily unit power level in PWe-Net for each day in the reporting month. Cenpute to the nearest whole megawatt.
l l.
7.
1 l.
_