ML20216F821

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Internal Torus Design Temp,Reflecting Correct Max Temp
ML20216F821
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/24/1987
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20216F799 List:
References
86TSB23, NUDOCS 8706300953
Download: ML20216F821 (6)


Text

'c ,

1 13.. , .

. ,7 f;.

]

I r ,

4-

g.

I r,

Enclosure 1 To Serial:- NLS-87-027 Proposed Technical Specification Pages -

Brunswick-1.

i 1

Internal Torus Design Temperature .! I (86TSB23) .

-l.

l t

I i

8706300953 B70624

'Y.' PDR ADOCK 050 g 4 gig, P

-1

.i . .

l

.c t

u'-

- c w, l * '

. Unit 1.-

SUMMARY

LIST OF REVISIONS PAGE NO. pESCRIPTION OF CHANGES . .1 5-1 Changed the maximun$ internal torus temperature to '

220'F.

I

'li I

e 1

i (5128 BAT /kts)

.p (BSEP-1-98)

3. i .

3.5.0' DESIGN FEATURES

.5.1 SITE D EXCLUSION-AREA 5.1.1'~The exclusion area shall be as shown:in Figure.5.1.1-1.

LOW POPULATION ZONE .

5.1.2 The' low population zone shall be as shown.in Figure 5.1.2-1,' based on- .

the information given in:Section 2.2 of the FSAR. -

i SITE BOUNDARY "5.1.3 "The SITE BOUNDARY shall be as a shown in Figure 5.1.3-1. For.the

-purpose of effluent release calculations,;the boundary for atmospheric releases is the SITE BOUNDARY and the; boundary for. liquid releas'es'is the SITE BOUNDARY prior to dilution in. the Atlantic Ocean.

5.2- CONTAINMENT CONFIGURATION 5.2.1 The PRIMARY CONTAINMENT is a steel-linedLreinforced concrete structure composed of a-series of vertical right cylinders and truncated cones which iform a drywell. This drywell is attached to a suppression. chamber'through a series of vents. . The suppression chamber is a concrete steel-lined pressure

' vessel in the shape of a torus. The primary containment has a minimum free air' volume of (288,000) cubic feet.

DESIGN TEMPERATURE AND PRESSURE i

5.2.2 The primary containment is designed and shall be maintained.for: 1 a.- Maximum internal pressure 62 psig.

b. Maximum internal temperatures drywell 300 0F.

suppression chamber 2200 F. I

c. Maximum external pressure 2 psig.

5.3 -REACTOR COREl FUEL' ASSEMBLIES

-. 5 . 3.1 - The reactor core shall contain 560 fuel assemblies, of 8x8R, P8x8R, and BP8x8R fuel types. Each fuel assembly contains 62 fuel rods. A11. fuel rods shall be cladded'with Zircaloy 2. Each fuel rod shall have a-nominel active fuel length 150 inches. ,

BRUNSWICK - UNIT 1 5-1 Amendment No.

9

p  :

c. t i ; ' , 7,  ; -

4',-

Enclosure 2 To Serial: NLS-87-027 -

Proposed Technical Specification Changes Brunswick-2

' Internal Torus Design Temperature (86TSB23) x (5128 BAT /kts)

sp

(;;,

??

Unit 2

SUMMARY

LIST OF REVISIONS PAGE NO. ,

DESCRIPTION OF CHANGES 5-1 ' Changed the maximum internal torus temperature to 220*F i

1 (51288AT/kts)

Q ^

.L ff . (BSEP-2-99)

. .D *:

'5.0 DESIGN FEATURES 5.1 SITE EXCLUSION AREA-5.1.1. The-exclusion area-shall be as shown in Figure 5.1.1-1.

LOW POPULATION ZONE

.5.1.2 'The' low population zone shall be as shown in Figure 5.1.2-1.

SITE' BOUNDARY 5.1.3 The SITE BOUNDARY.shall be as.shown in Figure 5.1.3-1. For the purpose of effluent release calculations, the boundary for atmospheric releases is the SITE BOUNDARY and the boundary for-liquid releases is the SITE BOUNDARY. prior to; dilution in'the Atlantic' Ocean. -

g. "5.2 CONTAINMENT

<- Z4 - CONFICURATION-

[5.2.1 The PRIMARY. CONTAINMENT is a steel-lined, reinforced concrete structure composed of a series of vertical right cylinders and truncated cones which form:a drywell. This'drywell is attached to a suppression chamber.through a series of vents.. The suppression. chamber is a~ concrete, steel-lined pressure vessel in,the shape of.a torus. 'The primary containment has a-minimum free air volume of.288,000 cubic: feet.

DESIGN TEMPERATURE AND PRESSURE 5.2.2 The primary containment is designed and shall be maintained fort a.. ' Maximum internal pressure 62 psig.

b. Maximum internal temperature: drywell'300*F Suppression chamber 220*F l
c. -Maximum, external pressure 2 psig. ]

5.3 REACTOR CORE

FUEL ASSEMBLIES 1 I 5.3.1' : The reactor core shall contain 560 fuel assemblies. The 8 x 8R, j

.P8 x 8R, BP8 x 8R fuel assemblies contain 62 fuel rods. All fuel rods shall 1 be clad with Zircaloy 2. The nominal active fuel length of each fuel rod shall be-150 inches for 8 x 8R, P8 x 8R, and )

. BRUNSWICK - UNIT 2 5-1 Amendment No.

t,