_ _.....,......
W$LF CREEK NUCLEAR OPERATING CORPORATION Richard A. Muench Vice President Engineering i
March 11, 1998 ET 98-0018 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Station F1-137 Washington, D. C.
20555
Subject:
Docket No. 50-482:
Revision 11 of the Wolf Creek Updated Safety Analysis Report rientlemen:
The enclosure to this ?'tter providos the submittal of the Wol Creak Updated g
Safety Analysis Report (USAR), RcvJsion 1.1.
Thin sunmittal satasfies the L
Final Safety Analysis Report (ESAR) updating requirement. of 10 CPR 50.'11
- c ) (1;.
Icn additioral ccpjes of tre USAR, Revision 11, have bec n sh ipped tv the Dacument Ccntrol uesk as required by 39 CFR E0.4, i n Crn 50. 34, 10 Cru 50 '4;a}(.!), and 10 CPR E'). 71 (e).
At t W.rw n c 1
provides informatimo asistive to c h a..y in
- egvieroty cowri..nent t.
S ys..'fic tectnical changes that havw been processed since is::;u ar ca of the USAR, P+vjslon 10, are described in Attact' ant 2 to this lettez.
In addition to tneme technical changes, several editor ial changes have boer made and art it:cluded in this revision.
Many of the changas are the resul.t of self Msessments and heightened awareness of USAh ecmpliance.
11 yoa have any questions concerning this matter, ricase contact me at (316) 364-8831, e>. tension 4U34, or Mr. Mich: 21 J. Angus at extensioi. 40T/.
Very truly yours, Richard A. Muench RAM /jad
.s Attachments Enclosure (Updated Safety Analysis Report) cc:
W. D. Johnson (NRC), w/a, w/e j
E. W. Merchoff (NRC), w/a, w/e J.
F. Ringwald (NRC), w/a, w/e F. M. Thomas (NPC), w/a, w /e
[lll ll{l*lll}*}lhl!lkhlll{(!k 9803170104 980311 PDR ADOCK 05000482 K
PDR a.www P.O. Box 411/ Burlington, KS 66839 / Phone: (316) 364-8831 An EquJ Opportunity Employer MT/HCNET I
g.
rr l
i t
'?j..
' iSTATE'or'KANSASL
.)
.. ), as coeurr or Corrar
)-
F
-Richard A. Muench, of lawful age,..being fir?. duly sworn upon oath says that I
he isLVice President Engineering of Wolf Creek Nuclear Operating Corporation;-
~
that he has read the' foregoing: document and knows the content thereof; that
^C he has executed that same for and. on behalf of said Corporation-with full j
-power and~ authority to do so; and that the-facts therein stated are true and
]
correct to the best of his knowledge, iaformation and belief.
By
//84 Richard [ident
. Muench Vice Pres Engineering day of k rC h, 1998.
. SUBSCRIBED and swor to before me this-4
\\
JUUE A. DALE-
" '" M l' dhoi-m.,i..ip9/ J
< My Appl. Expires /O /)D.
Expiration Date 1 0 O!h7 l
?-
s.
4 l
1 v
J
i to ET 98-0018 Page 1 of 1 Change to Regulatory Commitment This attachment provides discussion of a change made in the past. year to a regulatory commitment.
Commitment 88-313 Generic Letter 88-17,
" Loss of Decay Heat Removal," Expeditious Action 2 recommended implementing procedures and administrative controls that reasonably assure that containment closure will be achieved prior to the time at which a core uncovery could result from an accident or event. In response to the generic letter, Wolf Creek Nuclear Operating Corporation committed to station a person to close the containment hatch or penetration within thirty minutes during reduced invantory conditions to address the Generic ~ Letter action.
This commitment nas been modified to allow for a designated person who is readily availaMe to isolate the containment (i.e.,
to close the containment hatch or punetrations).
This commitment change is consistent with information previously presented to support Technical Specification Amendmer t 107 and as reflected in the Bases of Technical Specification 3.9.4.
This commitment change provides equivalent control for penetration closure during reduced RCS inventory conditions and does not change the requirement for the capability of closing penetrations within thirty minutes, i
i l
L l
I L
Attachme'nt 2 to ET 9tM)018 Pm9e 1 of 25 l
USAR Change Request Description ~
1 M-109 REVISES FLOOD ANALYSIS TO REFLECT 100% RUNOFF l
Page:
2 4-79
_ Page:
2 4-76 Page:
2.4-13
- Page:
2412 l
Page 2 4-11 Page.
2410 Table-2410 Sheet Table.
249 Sheet 1 Fgure-24-3 Sheet i M-111 REVISES USAR TO MAKE CONSISTENT WITH TCHNICAL SPECIFICATION FOR HIGH STEAM GENERATOR LEVEL TRIP OF THE FEEDWATER PUMPS Table.
15 0-4 Sheet 96-121 REVISES LOCATION OF THE REFUELING WATER STORAGE TANK SAMPLING TEXT IN SECTION 6.3 AND CC'ARECTS TABLE NUMBER 9.215 TO 9.2-16 Page:
6310 Page.
63-9 Page:
63-6 96-124 REVISES GENERAL DESCRIPTION OF THE AUXILIARY STEAM SYSTEM TO DESCRIBE CONDENSATE MAKEUP Page.
9 5-85 94-140 REVISES TABLE 3.6-3 SHEET 28&29, PIPE BREAK CALCULATION Tt.ble:
36-3 Sheet 29 Table-36-3 Sheet 28 l
96 142 REVISES FIGURES TO REFLECT Fall OPEN (F.O.) AND Fall CLOSE (F.C.) POSITION OF AF AND AC SYSTEM VALVES l
Fours:
10 2-1 Sheet 4 Fgure
.d 2-1 Sheet 2 Fgure-1044 Sheet 4 Fgure:
1044 Sheet 3 l
I 96-1!6 REVISES TABLES f's SECTION 9.2 TO REFLECT FLOW RATE FOR AUXILIARY FEED PUMP ROOM COOLERS SGF02A/B l
Table 924 Sheet 2 Table 924 Sheet 1 Table-92-3 Sheet 2 Table-02-3 Sheet 1 Table' 92-2 She,A 2 Table 92-2 Sheet 1 Table-9.21 Sheet 2 l'96-147 REVISES DESCRIPTION OF THE REACTOR COOLANT SYSTEM TO CLARIFY THE WORDS " ESSENTIALLY RESTRAINED" Page:
5 4-56 Page 5 4-57 Page:
5 4-56 Page.
3 9(N)-25
Attachme'nt 2 to ET 98-0018 Page 2 of 25 USAR Change Request Description 96166 REVISES FIGLM 10 ADD ADDITIONAL SHELL SIDE VENT TO THE STEAM GENERATOR BLOWDOWN REGENERATIVE HEAT EXCHAN061 Fgura:
10 4-8 Theet: 2 96-160 REVISES USAR TO REFLECT PROPER ACCEPTAllCE CRITERIA ASSOCIATED WITH RESPONSE TIME TESTING OF TURBINE DRIVEN AUXILIARY FEED PUMP Page:
15210 Page:
15 2-13 Page:
15.2 12 Page:
7.7-26 Page:
7.3-24 96 162 REVISES USAR AND TABLE TO CL/.RIFY OPERATING PRESSURE FOR AUXILIARY FEEDWATER CONTROL VALVE ACCUMULATORS Page:
9 34 Table:
931 Sheet. 2 96-164 REVISES FIGURE TO ENHANCE PORTIONS OF FIGURE THAT HAVE BECOME ILLEGIBLE 4
Fgura:
9.2-1 Sheet. 2 i
97402 REVISES TABLE TO REFLECT AS ANALYZED FLOOO LEVELS FOR TWO ROOMS l
Table ~
364 Sheet 1 97-003 REVISES TABLE TO CLARIFY ALARM FUNCTIONS IN MOTOR DRIVEN AUXILIARY FEED PUMP ROOMS T ble.
7.5-2 Sheet. 3 97-004 REVISES TABLE TO REFLECT CHANGES ASSOCIATED WITH AMENDMENT 102 AND DESIGN CHANGE PACKAGE Ttble 94-4 Sheet 3 Table:
94-2 Sheet 17 Table.
94-2 Sheet: 16 97-008 REVISES FIGURE TO CORRECTLY SHOW AS-BUILT CONFIGURATION OF DOMESTIC HOT WATER HEATERS
(
Fgurs:
9217 Sheet 2 97-009 REVISES FIGURE TO SHOW EXISTING COMPONENTS IN THEIR INSTRUMENT LOOPS Fgurs-034 Sheet 3
Attachme'nt 3 ts ET 98-0018 Page 3 of 25 USAR Change Request Description 97-013 REVISES FIGURE TO REMOVE NOTE 7 Fgure' 93-8 Sheet 5 Fgure:
93-8 Sheet 3 97-020 REVISES USAR TABLES TO CORRECT DISCREPANCIES ASSOCIATED WITH SAFETY INJECTION ACCUMULATOR VOLUME AND PRESSURE LIMITS Table:
63-1 Sheet i Table-62.1-3 Sheet 1 Table-7A-3 Sheet 32C Table-7A-3 Sheet 3.2 97 021 REVISES USAR TO REFLECT DELETION OF PRODUCT SPECIFIC INFORMATION CONCERNING HYDRAULIC FLUID Page:
9 58-70 97-026 REVISES USAR TO REFLECT NON-COMBUSTIBLE RADIANT ENERGY SHIELD AND DETECTION SYSTEM, REFLECT CHANGES IN PROCEDURE FORMAT, AND DELETE NOTE 6B AND ITS FOOTNOTE. ALSO REFLECTS THE CHANGE IN PROCEDURE FORMAT FROM ADM 13-100 TO AP 10-100 Page 95B-208 Table:
951-3 Sheet 4 Table 9.51-3 Sheet 3 Table-95.1-3 Sheet. 2 Table-95.13 Sheet 1 97-043 REVISES USAR TO UTILIZE THE ASME CODE CASE N-517 Page 17.2-21 Page.
17.2 20 97 044 REVISES USAR TO DESCRIBE TANK HEATING FOR THE CONDENSATE STORAGE TANK, REFUELING WATER STORAGE TANK, AND THE REACTOR MAKEUP WATER STORAGE TANK Page.
9248 Page' 9245 Page:
9 2-43 Page 6.34 97-076 REVISES USAR TO DELETE REFERENCE TO TECHNICAL SPECIFICATION Page:
16.7 14 l
i 97 077 REVISES USAR TO CHANGE REFERENCE FROM QUALITY ASSURANCE TO SUPPLIER / MATERIAL QUALITY Page.
311(BF27 1
! b ET 98-0018 Page 4 of 25 USAR Change Request Description e
97 078 REVISES TABLES TO REFLECT MORE ACCURATE DESCRIPTION OF Rt DWASTE FIRE BARRIER AND DIESEL GENERATOR VENTILATION Page-9 58-165 Page; 9 5-29 Page.
9.5 12 Page-9 5-21 Page:
9 5-20 Table 9 5E-1 Sheet 4 Table:
9 5B-3 Sheet 2 Table:
9 5A-1 Sheet 72 itbie 9 5A 1 Sheet 52 Table:
9 5A-1 Sheet 66 97481 REVISES TABLE TO ELIMINATE RESPONSE TIME FOR CONTROL ROOM VENTILATION ISOLATION Page.
7.3-17 Table-7.37 Sheet l
97-084 REVISES FIGURES TO CHANGE VALVE SYMBOLS FROM BALL VALVES TO BUTTERFLY VALVES Figurs-.
10 2-1 Sheet 6 Feure 10.2-1 Sheet 5 97-085 REVISES TABLE TO INDICATE SIX MOISTURE INSTRUMENTS ON GK SYSTEM HAVE BEEN DISABLCD t
Tcble.
311(B)-3 Sheet 105 97-086 REVISES TERMINOLOGY FOR CONSISTENCY ASSOCIATED TO THE ATMOSPHERIC RELIEF VALVES AND THE POWER OPERATED RELIEF VALVES Page 15 6-9 Page 15 2-17 Page:
15 2-15 Page 15 2-11
- Page, 15 2-7 Page-15 0-16 Page-10 3-8 Page:
10 3-7 Page:
1036 Page 10 3-5 Page:
10.3 4 Page-10.3-3 Page.
10.3-2 Page-7.7-3 Table.
15.1 2 Sheet i Table:
10 3-2 Sheet 1 Table 10.3 1 Sheet 1 97 0B7 REVISES USAR TO CORRECTLY REFLECT AUXILIARY BOILER AND AUXILIARY STEAM RE-BOILER IN GENERAL DESCRIPTION Page.
9545 97-089 REVISES FIGURE TO REFLECT CURRENT PLANT DESIGN AND IMPROVE LEGIBil>TY Fgurs.
624-1 Sheet 72 Fiore 6.24-1 Sheet 66 Figure.
6241 Sheet 64 Figure-624-1 Sheet 56 Figura 624-1 Sheet 56 Fgure.
6.241 Sheet 42b Fgure.
6.24-1 Sheet 54 Fgure-624-1 Sheet 53 Figure 624-1 Sneet. 49 Figure-624-1 Sheet 43 Fgure' 6241 Sheet 38 Fgure.
6.241 Sheet 36 F$urs-6241 Sheet 23 Figure-624-1 Sheet 17
i l
. Attachmhnt 2 O ET 984018 Page 5 of 25 USAR Change Request Description 97 090 CORRECTS TYPOGRAPHICAL ERRORS ON TABLE 3.11(B) AND TABLE 3.21 Page.
9 5-41 Table:
3.11(BF3 Sheet. 95 Table.
32-1 Sheet 6 97491 REVISES ORGANIZATION TO CHANGE THE RESUMES FOR MANAGER TRAINING AND THE CHIEF ADMINISTRATIVE OFFICER Page' 13121 Page:
13 1-22 Page:
13 1-20 Page.
13.1 8 97-092 REVISES FIGURE AND TABLE TO REFLECT REMOVAL OF EMERGENCY SERVICE WATER WARMING LINE VALVES Table:
311(B)-3 Sheet 60 Figure-92-2 Sheet 3 97-093 REVISES DESCRIPTION TO PROVIDE CONSISTENCY j
l Page:
10 4-49 97-094 REVISES DESCRIPTION TO BE CONSISTENT WITH FIGURE I
Page:
9 5B-41 97
- TBS REVISES TURBINE DRIVEN AUXILIARY FEED PUMP ROOM TEMPERATURE Toole' 311(B)-2 Sheet 6 Table:
3 ti(B)-2 Sheet 3 Table.
311(BF1 Sheet 3 97-096 REVISES SPENT FUEL POOL CRITICALITY ANALYSES TO PROVIDE K-INFINITIVE ADJUSTMENTS USING ACTUAL FUEL j
PELLET DENSITY RATHER THAN A NOMINAL VALUE Page:
91 A-36 Page:
9.1 A-13 Page' 9.1 A-11 Page-91 A-10 Page 91 A-8 Page 91A-9 Page' 91 A-6 Page:
9.1 A 5 Page:
9 0-li Ttble 914-10e Sheet Table' 91 A-10 Sheet Table.
91A-Ba Sheet Ts ble.
91 A-6 Sheet 97-097 REVISES DESCRIPTION OF ANALYSES OF THE EFFECTS AND CONSEQUENCES OF THE DROPPED ROD CLUSTER CONTROL ASSEMBLY SYSTEM (RCCASh STATICALLY MIS-ALIGNED RCCAS AND MIS-LOADED FUEL ASSEMBLY EVENTS TO REFLECT WESTINGHOUSE CODES AN3 ME*.PAODOLOGY.
Page:
16 4-42 Page:
15426 Page.
154-25 Page.
15 4-18 Page-15 4-17 Page:
15 4-14 Y
Attachme'nt 2 to ET 98-0018 Page 6 of 25 USAR Change Request Description 97-098 REV.
'S SECTION TO DELETE OUTDATE 3 INFORMATION AND UPDATE ADDITIONAL INFORMATION Page' 4 4-41 Page.
4428 Page:
4 4-27 Page:
4 4-24 Page:. 4 4-22 Page.
4 4-12 Page 44-8 Page:
44-7 Page:
44-4 Page:
4 0-xil Page:
40-s Page:
4.0-vn Table-44-3 Sheet 1 Table:
44-2 Sheet 1 Table:
44-1 Sheet 2 Table.
44-1 Sheet 1 Fgure 4 4-16 Sheet Figure:
4 4-15 Sheet Figure:
4 4-14 Sheet Figure.
4 4-13 Sheet Figure:
4412 Sheet 97 099 REVISES TABLE TO CORRECT TYPOGRAPHICAL ERRORS Table-83-4 Sheet. 17 97-100 REVISES SECTION TO MAKE CONS; STENT WITH WESTINGHOUSE METHODOLOGY Page:
4 3-41 Page.
4 3-37 Page:
4.3-36 Page:
4 3-35 Page 4 3-34 Page.
4 3-17 Page:
4 3-16 Page:
4 3-15 Page:
4.3-14 Page:
4 3-13 Page:
4.3-12 Page 4.3-11 Page:
4 0-x 1
Tcble:
1502 Sheet 2 Table:
16-2 Sheet 22 Table:
16-2 Sheet 12 l
)97-101 REVISES SECTION TO REFLECT CYCLE 9 VALUES Page-4 3-25 Page:
4.3-23 Page:
4 3-22 TCble:
43-3 Sheet 2 Table:
4.3-3 Sheet 1 Table-43-2 Sheet 4 Table:
4.3-2 Sheet 3 Table:
432 Sheet 2 Table:
43-2 Sheet 1 97 102 REVISES SECTIONS TO MAKE EDITORIAL CORRECTIONS Page:
4230 Page:
4 2-12 Page:
4.2 15 Page:
4216 Page 4 2-22 Page:
4227 Page:
4 2-33 Page.
4 2-34 Page-4 0-vi Page 4 2-38 Page:
15 0 ii Page.
4.3-10 Page:
4 3-13 Page:
4 3-25 Page-4 3-36 Page:
4.3-38 Page-4339 Page-4442 Page:
9.1 A-11 Page-15021 Page-15 04 Page.
4236 Table 9 2-16 Sheet 1 Table:
43-6 Sheet 3 Table:
43-6 Sheet 2 TCble:
43-6 Sheet i Table.
431 Sheet 2 Table 412 Sheet 4 Table:
41-2 Sheet 3 Table-41-2 Sheet 2 Table:
4.1-2 Sheet 1 Fgure:
4 3-46 Sheet 1 Figure 43-6 Sheet 1 97-104 REVISES OPERATOR RE-QUALIFICATION TRAINING TO REFLECT THE REQUIREMENTS OF 10 CFR 55 59 Page:
13210 Page:
13.2-9 Page:
13 2-8 Page.
13.2 1 f
1
l Attachtr$nt 2 to ET 98-0018 Page T of 25 USAR Change Request Description 97 106 REVISES SHIFT TECHNICAL ADVISOR RE-QUALIFICATION TRAINING TO REFLECT THE REQUIREMENTS OF 10 CFR 55.59 Page:
13.2-24 97-106 REVISES PROCESS DESCRIBING INITIATION OF FUEL BUILDING EMERGENCY EXHAUST SYSTEM PRIOR TO FUEL HANDLING ACTIVITIES Page.
9 4-28 97 107 DELETES CONTRADICTORY STATEMENT FOR THE TRAINEE FEEDBACK EVALUATION PROCESS.
Page-.
13 2-25 97-108 REVISES FIGURE TO ADD IN LINE LOOP SEAL Fgurs:
93-5 Sheet: 6 97-109 REVISES TABLE TO REFLECT AS BUILT INFORMATION ASSOCIATED TO FIRE RATING ON STAIRWELL DOORS Table-9 5A-1 Sheet 37 97 150 CORRECTS TABLE TO DELETE DUPLICATE INFORMATION, REFLECT ACTUAL CONFIGURATION, AND CORRECT COMPONENT NUMBERS Table-03-4 Sheet 11 Table' 834 Sheet 5 Table 834 Sheet: 8 TLble-834 Sheet 7 Table.
834 Sheet 8 Table.
83-4 Sheet 4 Trble 834 Sheet 10 Table.
83-4 S eet 25 Table.
834 Sheet 12 Ttble.
834 Sheet 18 Table.
8 34 Sheet 17 Table.
83-4 Sheet 18 Ttble.
83-4 Sheet 19 Table-834 Sheet 20 Table' 83-4 Sheet. 23 Tatne:
83-4 Sheet 9 97 111 REVISES FIGURES TO REFLECT FLOW ORIFMES ADDED BY MODIFICATION TO ESSENTIAL SERVICE WATER SYSTEM I
Fgure.
92-4 Sheet 1 Fgure 92-3 Sheet 1 97 112 REVISES DISCUSSION TO INCREASE C-9 STEAM DUMP PERMISSIVE SETPOINT TO MAKE CONSISTENT WITH OTHE'4 USAR SECTIONS Page.
10412
1 Attachme'nt 2 to ET 98-0018 Pa9e 8 of 25 l
l USAR Change Rsquest Description 97 113 REVISES SPEED OF THE AUXILIARY HOIST OF THE REFUELING MACHINE FROM TWO SPEED TO VARIABLE SPEED Page.
9132 l
t l
97-114 REVISES FIRE PROTECTION DISCUSSION TO REFLECT REROUTING OF CONDUlT
{
l 1
Page:
9 58-90 I
Table:
9 58-4 Sheet 2 Table 9 5B-3 Sheet 1
(
97 115 REVISES SECTION TO DELETE A REFERENCE TO A RADIATION MONITOR THAT HAS BEEN REMOVED FROM THE PLANT l
Page:
1.2-22 Page-92-8 l
l l
97-116 REVISES SECTIONS TO MAKE INFORMATION CONSISTENT WITH DEPARTURE FROM NUCLEATE BOILING RATIO (DNBR) l UPDATE, MODERATOR TEMPERATURE COEFFICIENT (MTC)*dDATE AND AMENDMENTS 61 AND 92 Pcge:
91A-8 Page-9 1-49 r* age:
9145 Page-0 1-44 l
Page.
9 1-30 Page:
9 1-21 Page 91-9 Page.
918 i
Page 91-4 Page.
91-3 Page.
43-4 Page.
3110 97-117 REVISES TABLE TO CORRECT CONFLICTING INFORMATION BETWEEN SECTION 2.3 AND 7A ASSOCIATED WITH METEOROLOGICAL INSTRUMENTATION l
f T;ble:
7A 3 Sneet. 17 5 97-118 CORRECTS TABLE TO REFLECT DELETION OF VALVES T ble.
3 9(B)-16 Sheet 16 i
97-119 REVISES RADWASTE SYSTEMS TO MORE ACCURATELY REFLECT ACTUAL OPERATION Page.
1144 Page 1134 Page.
11.3-3 Page 11 3-2 Page' 11.2 3 Page.
10 4-57 Page 9380 Page 9 3-79 i
97-120 REVISES COMMUNICATION DESCRIPTION TO REFLECT INSTALLATION OF FIBER OPTICS AND THE REMOVAL OF THE MICROWAVE SYSTEM Page' 9 5-40 Page' 2 3-42 Page' 9 5-44 Page 9 5-41 97-121 REVISES DISCUSSION TO CLARIFY LOSS OF COOLANT ACCIDENT (LOCA) BREAK SIZE Page.
6 3-32 l
I t3 ET 98-0018
.Ps9e 9 of 23 USAR Change Request Description 97-122 REVISES USAR TO REFLECT CORRECTIONS IDENTIFIED DURING THE AUXILIARY FEEDWATER SELF ASSESSMENT Page.
10 4-50 Page:
10 4-49 Page:
7A-2 Page.
30-6 Table:
7A-3 Sheet 31 Table 7A 3 Sheet 64 Table-7A-3 Sheet 1.1 Table-7A-3 Sheet 62 Table:
7A-3 Sheet 61 Table' 7A-3 Sheet 52 Table:
7A-3 Sheet 5.1 Table-7A-3 Sheet 44 Table:
7A-3 Sheet 43 Table.
7A-3 Sheet 42 Table:
7A 3 Sheet 4.1 Table-7A-3 Sheet 34 Table' 9 5B-2 Sheet 7 Table:
7A 3 Sheet 32 Table' 7A-3 Sheet 65 Table:
7A-3 Sheet 26 Table:
7A-3 Sheet 2.7 Table:
7A-3 Sheet 2.6 T;ble:
7A-3 Sheet 25 Table-7A 3 Sheet 24 Table-7A-3 Sheet 23 Table 7A-3 Sheet 2.2 Table:
7A-3 Sheet 2.1 Table.
7A-3 Sheet 1.5 Table.
7A-3 Sheet. 14 Table 7A-3 Sheet 1.3 Table 7A-3 Sheet 42C Table.
7A 3 Sheet 1.2 Table:
7A-3 Sheet-33 Table 7A 3 Sheet 13 2 1:ble 7A-3 Sheet 17.5 Table:
7A 3 Sheet 17 5 Table.
7A-3 Sheet 17 4 Table.
7A 3 Sheet 17.3 Table.
7A-3 Sheet: 17.2 Table:
7A-3 Sheet. 17.1 Ttble:
7A-3 Sheet 16.2 Table:
7A-3 Sheet 16.1 Table:
7A-3 Sheet 16.1 T:ble-7A 3 Sheet 15 1 Table-7A-3 Sheet 14 2 Table' 7A-3 Sheet 63 Table 7A 3 Sheet. 13 3 Table:
7A-3 Sheet 66 Table 7A-3 Sheet 13.1 Ttble-7A-3 Sheet 13.1 Table 7A-3 Sheet 12 5 Table TA-3 Sheet 12 4 Table.
7A 3 Sheet 12 3 Table 7A-3 Sheet 12 2 Table' 7A-3 Sheet 12.1 Table:
7A-3 Sheet 11 2 Table' 7A-3 Sheet 11.1 Table-7A-3 Sheet 10.1 T ble.
7A-3 Sheet 91 Table.
7A-3 Sheet 61 Table:
7A-3 Sheet 7.1 Tat:b3:
7A-3 Sheet:
14.1 97-123 CORRECTS FIGURE TO REFLECT ACTUAL DESIGN DRAWING INFORMATION Figure-9215 Sheet 1 97 124 REVISES ORGANtZATION TO REFLECT CURRENT STRUCTURE Pagir 13 5-11 Page:
131-22 Page:
13 1-20 Page:
13.1-16 Page-131 15 Page-13 1-13 Page:
13 1-12 Page:
1319 Page 1316 Page:
13 1-7 Page 13.1-8 Page:
13.1 5 T:ble' 13.1-1 Sheet 2 Table:
13 1-1 Sheet 1 Figurs:
1312d Sheet Figure' 1312c Sheet Fgure 13120 Sheet Fgure-13 1-2 Sheet Figura:
1311 Sheet.
i l
Attach nt 2 t) ET 98-0018 l
Page 10 of 23 i
- USAR Change Request Description i
97-125 DOCUMENTS FIGURE MISSED IN REVISION 10 OF THE USAR ASSOCIATED TO USARCR 97-069 Figur*
10 4-6 Sheet 6 97-126 REVISES HYDROGEN RECOMBINER START TIME Page:
6 24.4 Page:
6 2-82 T;ble-7A4 Sheet 64 Table:
7A 2 Sheet 2 97.C7 REVISES DISCUSSION 3 REMOVE REFERENCE TO COF TROL ROOM STRIP CHART RECORDERS.
Page:
7.7 11 97 128 ADDS REGULATORY GUIDE 1.163 TO TABLE 3A Page:
3A-60 97 129 REVISES FIGURE TO CORRECT VALVE NUMBER i
l FQure-955-1 Sheet 2 l
97 130 REVISES FIGURE AND FIRE HAZARDS ANALYSIS TO DELETE PROTECTIVE CLOTHING STORAGE AREA Page' 9 58-59 l
l Fgure 1.2-13 Sheet 1 97 131 REVISES RESIDUAL HEAT REMOVAL SYSTEM DESCRIPTION Page.
5 4-40 Page-3 1-29 Page.
1220 Trbte-54-9 Sheet 1 Table-5 4A-3 Sheet 97 132 REVISES FIGURES TO REFLECT REPLACEMENT OF EDUCTOR AND CLARIFY CODE CLASSIFICATIONS l
Fgure 9 3-11 Sheet. 2 Fgure 9 3-11 Sheet i f
97 133 REVISES REFERENCES TO ELECTRO-HYDRAULIC CONTROL SYSTEM PRESSURES Page.
10 2-3 Page.
35-6 i
I l-to ET 98-0018 Page 11 of 25 USAR Change Request Description 97 134 CLARIFIES A STATEMENT IN THE AUXILIARY FEEDWATER DESCRIPTION TO REFLECT EITHER MOTOR DRIVEN AUXILIARY FEEDWATER PUMP WILL PROVIDE 100% FLOW AND TO CLARIFY FLOW MINIMUM Page.
10 4-48 Table.
10 4-13 Sheet 2 l
97-136 REVISES DESCRIPTION TO MORE CLEARLY REFLECT WOLF CREEK GENERATING STATION OPERATION Page:
5 4-42 Page:
5 4-41 Page-5 4-39 Page-5 4-38 I
l 97 136 REVISES DESCRIPTION TO CLARIFY SERVICE WATER HEADER PRESSURE REQUIREMENTS Page:
92-3 Page:
92-2 l
l 97-137 REVISES FIGURE TO REFLECT REMOVAL OF SHOWERS IN ACCESS CONTROL MEN'S SHOWER ROOM i
Table.
17-2 steat. 5 Fgury 9217 Sheet 2 l
97 138 REVISES TABLE 3.11(B)-1 TO CLARIFY MINIMUM TEMPERATURE LIMITS Table-311(B) 1 Sheet 6 I
97-139 CORRECTS TYPOGRAPHICAL ERRORS Page:
95-7 Page-92-4 f
TLble 92-5 Sheet 2 Table:
925 Sheet 1 Table:
3.2-1 Sheet 6 97-140 CLARIFIES NUCLEAR STATION OPERATOR (NSO) RE-QUALIFICATION TRAINING REQUIREMENTS AND REVISES SAME TO ALLOW A 30 DAY GRACE PERIOD I
Page:
13 2-17 l
l 97 141 CORRECTS TYPOGRAPHICAL ERRORS Page:.
3C-2 Page 3 5-14 97-142 REFLECTS THE ALLOWED USE OF PRECISION STEAM FLOW CALORIMETRIC IN ADDITION TO A FEEDWATER CALORIMETRIC IN DETERMINING SECONDARY SYSTEM POWER PaDe' 15 0-11 Table:
15 0-5 Sheet
i j to ET 98-0018 Page 12 of 25
[
USAR Change Request Description 97 143 CORRECTS REFERENCES TO MEGA WATTS ELECTRICAL Page-9 2-31
. Page-241 97-144 REVISES REACTOR COOLANT PUMP MOTOR FLYWHEEL EXAhlNATION REQUIREMENTS Page:
16 4-7 Page.
3A-7 I
I 97 145 REMOVES LOCKED VALVE NOTES FROM FIGURES AND UPDATES VALVE TABLES ON CONTAINMENT PENETRATION FIGURES Fgurt 624-1 Sheet 24 Fgure.
6.2 01 Sheet 35 Fgure.
6.2.41 Sheet 15 Figure.
624-1 Sheet 16 Fgure:
624-1 Sheet 17 Figure.
6241 Sheet 16 Figure:
6241 Sheet 19 F1ure 6241 Sheet 20 Fgurz 624-1 Sheet 21 Fgure:
S 2.4-1 Sheet.13 Figure.
6241 Sheet 23 Figure.
62.41 Sheet 12 l
Figurt 624-1 Sheet 25 Figure:
- 2.41 Sheet 26 Figure-.
624-1 Sheet 27 Fgure.
6.24-1 Sheet 26 Figurs:
6241 Sheet 29 Figure:
824-1 Sheet 30 Figure-6.24-1 Sheet 31 Figure.
624-1 Sheet 32 l
Ftura:
624-1 Sheet 33 Fgure 1.1-1 Sheet 2 Figure 6.24-1 Sheet 22 Figure:
1043 Sheet Figure.
9215 Sheet 2 Fgure:
9 2-15 Sheet 1 Figure 051-1 Sheet 2 Figure-10 4-12 Sheet 4 Fgurt 11 3-1 Sheet-1 Fgure:
94-3 Sheet 3 Fgure 93-6 Sheet 5 Fgure-93-6 Sheet 3 1
Fgurs:
624-1 Sheet 14 Figure:
9 2-16 Sheet Fgurt:
6.2.4-1 Sheet 36 Figure.
62.41 Sheet 1 Feurs:
6.2.4-1 Sheet 2 Figure:
6241 Sheet. 3 Fgure:
624-1 Sheet 4 F6gure:
62.4-1 Sheet 5 Fture.
624-1 Sheet 6 Fgure:
6.24-1 Sheet 7 Fgure:
624-1 Sheet 6 Fgure 6.24-1 Sheet 9 Fgure:
6241 Sheet 10 Fgure:
62.41 Sheet 11 Figure-9 2-23 Sheet Figure:
6241 Sheet 67 Fgure:
624-1 Sheet 57 Fgure:
6241 Sheet 34 Fgure:
6241 Sheet 59 Figure.
624-1 Sheet 60 i
Figurr 624-1 Sheet 61 Fgure' 6241 Sheet 62 Feure.
624-1 Sheet 63 Figure:
624-1 Sheet 64 l
Fgurt 95.11 Sheet 2 Fgure:
'J 2 4-1 Sheet 66 Fgure' 6.24-1 Sheet 56 Fgure 624-1 Sheet 66 Fgurt 624-1 Sheet 69 Fgure-62.41 Sheet 69 Figure 6.24-1 Sheet 69 Figure 624-1 Sheet 70 Fgura-6.24-1 Sheet 70 Figure.
6.24-1 Sheet 71 Figure:
624-1 Sheet 71 Foure:
6241 Sheet 72 l
Fgurt 6.24-1 Sheet 73 Fgure 624-1 Sheet 74 Fgure 624-1 Sheet 65 Figure-6.24-1 Sheet 44 l
l Figura 6241 Sheet. 37 Fgure 624-1 Sheet 36 Foure.
6.241 Sheet 39 Figure 6.24-1 Sheet 40 l
(
Fgua 624-1 Sheet 41 Fgure:
6.24-1 Sheet 42 Fgure 6241 Sheet 42 Fgure.
624-1 Sheet 42 l
Fgura:
6241 Sheet 56 Fgure:
624-1 Sheet 43 Fgure:
6.24-1 Sheet 55 Fgure 624-1 Sheet 45 Fgurs:
6.241 Sheet 45 Fgure-6241 Sheet 46 Fgure 6241 Sheet 47 Fgure 624-1 Sheet 46 Figura:
624-1 Sheet 49 Figure 6241 Sheet 50 Fgure 6.241 Sheet 51 Fgure-624-1 Sheet 52 Fguri 6241 Sheet 53 Ftgure:
624-1 Sheet 54 Figure 624-1 Sheet 43 to E T 984018 Page 13 of 25 USAR Change Request Description 97 146 REVISES TEXT AND TABLE TO REFLECT ACTUAL FEEDWATER HEATER OPERATION Page.
10 4-27 TatWe:
1045 Sheet 97-147 CORRECTS TYPOGRAPHICAL ERROR Page:
1.2-21 97-149 REVISES USAR SECTIONS TO REFLECT EXEMPTION FROM 10 CFR 70.24 Pa0e:
12.3-41 Page:
12.3-24 Page 12 3-21 Pape.
9 1-72 Page:
9 1-15 Page:
91-7 Page:
9.14 Page:
9.1-2 T ble:
12 3-2 Sheet Table.
1.3-4 Sheet 27 97-151 INCORPORATES REFERENCE TO GENERIC LETTER 97-02 INTO THE USAR FOR THE PREPARATION OF THE MOhTHLY OPERATING REPORT Page-12.5-8 Page.
3A-8 97 152 REVISES FIGURES TO REFLECT CONFIGURATION ISOLATION VALVES IN THE POTABLE WATER SYSTEM Figure:
9217 Sheet: 2 97 153 REVISES FIGURE TO CORRECT REFERENCE Figure.
10 4-10 Sheet 1 97 154 REVISES DISCUSSION OF MAIN CONDENSER AIR REMOVAL SYSTEM TO REFLECT THE OPERAllON FLEXIBILITY TO RUN PUMPS AS NEEDED TO MAINTAIN CONDENSER VACUUM.
Page-430-20 Page 10 4-6 Page:
104-5 Table 92-1 Sheet. 2 Table 92-1 Sheet i 97 155 REVISES REFUELING EQUIPMENT DESCRIPTION TO REFLECT CHANGES MADE TO THE TRANSFER PORTION OF THE SYSTEM P;ge:
1 2-21 Page.
9.1-41 Page-9 1-40 Figure 91 12 Sheet-97-156 CLARIFIES INFORMATION ASSOC!ATED WITH THE INDICATION OF AREA RADIATION MONITORS IN THE EMERGEP4CY OFFSITE FACILITY (EOF) AND TECHNICAL SUPPORT CENTER (TSC)
Page.
12.3 25 Page.
12 3-22 Page 12 3-21
f t) ET 98@i8 Page 14 of 25 USAR Change Request Description 97-157
- CLARIFIES INFORMATION ASSOCIATED WITH THE SOLID STATE PROTECTION SYSTEM (SSPS) GENERAL WARNING Page.
7.2 31 97 158 REVISES DESCRIPTION FOR EMERGENCY SERVICE WATER PUMP DISCHARGE PRESSURE AND FLOW Table:
75-1 Sheet 3 97 159 REVISES DESCRIPTION OF CONDENSATE CLEANUP SYSTEM Page:
10 4-20 97 160 REVISES USAR TO REFLECT THd USE OF ARMAFLEX INSULATION IN ROOMS 1325 AND 1326 Page-9 5B43 I
97 161 REVISES FIGURE TO REFLECT BLOCKING CLOSED THE NORMAL EXHAUST DAMPERS IN THE CONTROL ROOM HVAC Fgure-94-1 Sheet i 97-162 CLARIFIES THE DESCRIPTION OF THE FUNCTION OF COMPONENT COOLING WATER RADIATION MONITORS Page:
11 5-7 Table.
11 5-1 Sheet 2 Table' 11.5-1 Sheet 1 97 163 REVISES USAR TO INCORPORATE EXEMPTION TO 10 CFR 70.24 Page:
12.3-24 Page:
12.3-21 Page:
9115 Page-9.1 14 Page:
917 Page-916 Page:
915 Page-912 T ble' 12 3-2 Sheet 1 Table-12.1 1 Sheet 1 Table.
1.34 Sheet 27 97-164 REVISES HISTORICAL INFORMATION ASSOCIATED TO DAM MONITORING TO CHANGE TENSE OF THE INFORMATION Page' 2 5-315 to ET 98-0018 Page 15 of 25 USAR Change Request Description 97 165 RESTORES HISTORICAL FUEL INFORMATION, CORRECTS TYPOGRAPHICAL ERRORS, MAKES SECTIONS CONSISTENT AND, UPDATES INFORMATION, Page:
4 2-15 Page 41-1 Page 41-2 Page.
4.13 Page:
424 Page 425 Page:
42-9 Page 4.2 10 Page'.
4.2 11 Page:
4 2-12 Page.
4 0-vist Page.
4.2 14 Page:
4.2-17 Page.
4.2-16 Page.
4 2,18 Page:
4.2 19 Page:
4220 Page:
4226 Page.
4.2-27 Page.
4.2 37 Page.
4.2-39 Page 4 2-40 Page.
43-7 Page 919 Page-4 2-13 Table:
91A5 Sheet Table' 43-1 Sheet 2 Table.
4.3-1 Sheet 1 Table' 411 Sheet. 7 Table.
411 Sheet 6 Table 4.11 Sheet 5 Table:
41-1 Sheet. 4 Table 411 Sheet 3 Fig Jte.
4 2-15 Sheet' Hgure-4 214A Sheet Fgure-4 2-14 Sheet Fgure.
4.2 13 Sheet.
Figure.
4 212A Sheet Figure:
4 211A Sheet Fgure 4 2-6A Sheet.
Fgure 424 Sheet Figure:
4238 Sheet Figure 4 2-3A Sheet Figure:
42-3 Sheet Fgure-4 2-2B Sneet Figure:
4 2-2A Sheet Fgure:
4 2-1 A Sheet Fgure.
421 Sheet 97 166 REVISES INVENTORY METHODS FOR FUEL LOADING PROCESS Page-15 4-24 Page.
91A 34 Page 91 A-33 97 167 REVISES DESCRIPTION OF SEISMIC MONITORING TO REFLECT REPLACEMENT OF TAPE RECORDER WITH SOLID STATE COMPUTER MEMORY Page:
3.7(DF17 97 168 REVISES ORGANIZATION TO ADD NEW SHIFT SUPERVISOR Page 13119 97-169 REVISES ORGANIZATION TO REFLECT ADDITION OF MANAGER LICENSING AND CORRECTIVE ACTION AND THE CONSOLIDATION OF ENGINEERING GROUPS UNDER THE VICE PRESIDENT ENGINEERING Page 13115 Page 9 5-38 Page.
1315 Page 13 1-6 Page:
13.1 7 Page.
13 1-9 Page.
13 1-11 Page 13112 Page.
9535 Page.
13.1 14 Page 17.2-43 Page.
13 1-16 Page.
131-18 Page 13119 Page:
131 20 Page 13 1-21 Page 13122 Page 13 3-1 Page 13 5-11 Page 17.2-44 Prge:
17.2 42 Page 13 1-13 Table-1311 Sheet 2 Tabie 13 1-1 Sheet 1 Table 9 5A-1 Sheet 2 Tt ble-9 5A 1 Sheet 1
I l
Attachin nt 2 to ET 98-0018 Page 16 of 25 USAR Change Request Description 97 170 CORRECTS REFERENCE TO FIGURE IN TABLE Table:
9.5A 1 Sheet 48 97 171 REFLECTS MODIFICATION OF THE LEAK-OFFS FROM THE AUXILIARY FEEDWATER PUMP TURBINE KFCO2 GLANDS Page.
18 2-56 Fgure 10410 Sheet 1 97-172 ADMINISTRATIVE CHANGE TO CORRECT TYPOGRAPHICAL ERRORS Page.
16 7-5 Page 10 0-vi Page-9551 Table.
1.7-1 Sheet 18 Table:
7.12 Sheet 3 Table.
1.71 Sheet. 1 Table' 7.12 Sheet i Table:
321 Sheet 16 Table.
1.7-1 Sheet 21 Tobie.
1.7-3 Sheet 4 Table-171 Sheet 19 Table:
7.12 Sheet 4 Table:
1.71 Sheet 13 Table:
1.7-1 Sheet 12 Table:
1.7-1 Sheet: 9 1
Ttble:
17-1 Sneet. 8 Table-1.71 Sheet 5 Table:
17-1 Sheet. 4 Table.
171 Sheet 2 Table-1.71 Sheet 20 Table:
7.1-2 Sheet 13 Table:
1.73 Sheet 1 Table.
1.72 Sheet 7 Table-1.72 Sheet 5 Table:
1.7-2 Sheet 4 Table:
1.7-2 Sheet 3 Table:
7.1-2 Sheet 2 Table.
17-2 Sheet 1 Table.
7,12 Sheet 5 Table 7.1-2 Sheet 12 Table.
7.1-2 Sheet. 11 Table-7.12 Sheet 10 Table 7.12 Sheet 9 Table:
7.12 Sheet' 8 Table-7.12 Sheet 7 Table:
7.1-2 Sheet 6 Tible:
1.72 Sheet 2 Fgure:
10 3-1 Sheet 1 l
l 97-173 REVISES ORGANIZATION TO ADD NEW SHIFT SUPERVISOR Page.
13119 l
97-174 CLARIFIES REQUIREMENTS FOR OPERATION OF THE CENTRIFUGAL CHARGING PUMPS & NORMAL CHARGING PUMP Page-52-0 97 175 REVISES USAR TO IMPLEMENT WORDS THAT ARE IN LINE WITH INDUSTRY AND WOLF CREEK TERMS Page.
9 1-52 Page-9 1-46 I
I l
i
f
- to ET 98-0018 Page 17 of 25 USAR Change Request Description I
i l
97 176 MODIFIES THE MICRON RATING OF THE WASTE EVAPORATOR FEED FILTER TO REMOVE SMALLER RADIOACTIVE PARTICLES IN THE WASTE STREAMS Table.
11.2-1 Sheet 10 97 177 REVISES THE USAR TO CORRECTLY STATE THE ESSENTIAL SERVICE WATER PUMP START TIMES AFTER RECEIPT OF THE SAFETY INJECTION SYSTEM AND AFTER RECEIPT OF LOSS OF OFFSITE POWER SIGNAL Page 92-8 97 178 REVISES TABLE TO CLARIFY THE FLOW REQUIREMENTS FOR THE COMPONENT COOLING WATER SYSTEM UNDER DIFFERENT OPERATING AND ACCIDENT CONDITIONS.
Table-0211 Sheet 2 Table:
9211 Sheet 1 Table:
9210 Sheet 2 TLbie.
9210 Sheet 1 Table' 9.2-9 Sheet 2 Table' 92-9 Sheet 1 97-179 REVISES USAR TABLE 3.11(B)-3 TO REFLECT EFFT0003 AND EFFT0004 AS SPARED IN PLACE Table:
311(BF3 Sheet 55 97-180 REVISES USAR TABLE 3.11(B)-3 AND 9.58-2 TO ADD DIFFERENTIAL PRESSURE SWITCHES EFPDS0019A AND EFPDS0020A j
Trble 9 5B-2 Sheet 2 Table.
9 58-2 Sheet 1 Table:
311(BF3 Sheet 58 97-181 REVISES USAR TO CORRECTLY REFLECT THE CONDITIONS FOR REFUELING ACTIVITIES AS THEY ARE PERFORMED Prge:-
9148 97 182 REVISES REFUELING PROCEDURE DISCUSSION TO CLARIFY THE PROCESS OF LOWERING THE REFUELING POOL LEVEL Page:
9 1-50 97-183 REVISES DISCUSSION ON FUEL HANDLING PROCESS TO ADDRESS OPERATION OF THE TRANSFER TUBE VALVE Page' 9148
~
Attachm nt 2 to ET 98-0018 l
Page 18 of 25 j
USAR Change Request Desc.iption l
97 184 REVISES DISCUSSION ON CLEANING OF REFUELING POOL AND REFUELING WATER STORAGE TANK (RWST) l FOLLOWING DRAIN DOWN OF THE REFUELING POOL TO THE RWST TO ALLOW FOR THE USE OF ONE PUMP AND FILTER Page-0123 97-185 REVISES REFUELING SEQUENCE TO BETTER DESCRIBE ACTUAL PRACTICE Page' 9 1-33 Page.
9.1-50 Page.
9.1 49 Page:
9.1-48
)
Page.
9144 l
97-187 UPDATES SPECIFIC YEARS REFERENCED FOR THE ASME CODE (SECTION XI) TO THE iZ AR THAT IS CURRENTLY SPECIFIED BY 10CFR50.55a.
Page-5 4-19 i
97 188 REVISES DESCRIPTION OF REACTOR COOLANT SYSTEM VENTING AND DRAINDOWN ACTIVITIES.
Page-9442 Page 9 1-46 97 189 REVISES THE USAR TO ALLOW THE USE OF EITHER THE RESIDUAL HEAT REMOVAL (RHR) SYSTEIE OR CHEMICAL &
VOLUME CONTROL SYSTEM (CVCS) WHEN FILLING THE REACTOR CAVITY FOLLOWING THE LIFTING OF THE REACTOR VESSEL HEAD Page:
15 4-21 Page.
9 3-63 Page.
9 1-47 Paw 5 4-39 Page-5 4-35 4
I 97 190 REVISES DISCUSSION TO REFLECT THE ACTUAL LOCATION OF THE CLOSED COOLING WATER SYSTEM SURGE TANK Page.
9250 97-191 DELETES SPECIFIC REFERENCES TO TECHNICAL SPECIFICATION SECTIONS AND CORRECTS DISCUSSION ON OUTSIDE TANKS AND THE RADIOLOGICAL CONTROLLED AREA Page 15610 Page-14 2-12 Page-7.3-38 Page:
7.13 Page 6.2-87 Page:
6 2-70 Page 5 3-19 Page 5.2-12 Page 4419 Page 3A-57 Page-3A 15 Page 12 4-8 Toble 15 6-8 Sheet Table-13 1-1 Sheet 2 Table 9513 Sheet. 4 Table 9543 Sheet 6 Table 954-3 Sheet. 5 Table 7A-3 Sheet 81C T ble.
7A 3 Sheet 63 Table.
7A-3 Sheet 32C Table 7.2-3 Sheet 2 Tible 66-1 Sheet.
Table 52-6 Sheet j
1 to ET 98-0018 P. age 19 of 35 i
i USAR Change Request Description 97 192 REVISES DEFINITION OF CORE ALTERATION IN 10.0.2.6 TO MATCH THE REVISED DEFINITION OF CORE ALTERATION FROM AMENDMENT 109 TO TECH SPEC.1.9 Page:
1602 97 193 REVISES FIGURE 9.2-5 SHEET 2 (MAKEUP DEMIPERALIZER SYSTEM) TO REFLECT THE EXISTING AS-BUILT PLANT CONFIGURATION Fgure-92-5 Sheet. 2
' 97 194 REMOVES REFERENCE TO THE LEEDS AND NORTHRUP RECORDER AND IDENTIFIES THAT A MULTIPOINT RECORDER IS USED Page:
2.346 97 195 REVISES ORGANIZATION TO REFLECT THE TITLE AND PERSOF,NEL CHANGES OF SUPERVISOR OPERATIONS SUPPORT
]
TO SUPERINTENDENT OPERATIONS SUPPORT Page 13121 PsDe:
13 1-17 Page:
13 1-10 Page.
13.1-9 Figure.
131-2C Sheet.
i 97-196 CLARIFIES WElGHT ON THE POLAR CRANE AUXILIARY HOOK WHEN USED TO REMOVE THE 1RRADIATED SAMPLE FROM THE REACTOR VESSEL Page:
9139 97-197 REVISES REACTOR DISASSEMBLY PHASE il SECTION TO PROVIDE CONSISTENCY 4. BROADEN THE SPECTRUM OF WORD FLEXIBILITY FOR LITERAL COMPLIANCE METHODOLOGY Page' 9.1-51 Page:
9 1-50 Page:
9147 Page 9 1-46 I
97-198 CORRECTS FIGURE TO REFLECT REMOVAL OF FIRE EXTINGUISHER Fgure-951-2 Sheet: 2 97-199 REVISES THE HIERARCHICAL ARRANGEMENT OF REGULATIONS AND PLANT DOCUMENTS AS IT IS PRESENTLY UNDERSTOOD IN THE NUCLEAR INDUSTRY Page-17.2-5 Figure.
17.2 1 Sheet.
I
AttachnEnt 2 to ET 98@18 Page 20 of 25 USAR Change Request Description 97-200 REVISES THE DESCRIPTION OF THE A-23 AND T.2 FIRE AREAS IN SECTION 9.5B TO INCLUDE A DISCUSSION OF THE NON-RATED MISSILE SHIELDS Page:
9 5B-182 Page:
95B49 97 201 REVISES TABLE TO DELETE DUPLICATE INFORMATION T ble:
834 Sheet 24 Table 83-4 Sheet: 23 97 204 CHANGES SECTION 16.0.2 TO INCORPORATE A DEFINITION OF WHAT CONSTITUTES OPERATIOtJ OF THE WASTE GAS HOLDUP SYSTEM AND WHEN THE WASTE GAS ANALYZERS MUST BE IN OPERATION Prge:
16 0-3 97 205 del.ETES MOTOR OPERATED VALVE (MOV) VALVES KJHV0001, KJHV0002, KJHV0101 AND KJHV0102 (ABANDONED IN PLACE) FROM TABLE 3.9(B)-16 Table:
3 9(B)-16 Sheet 34 Table.
3 9(B)-16 Sheet-33 97 206 REVISES USAR TO REFLECT THE ACCEPTABILITY OF ALLOWING SPENT FUEL POOL WATER TEMPERATURE TO GO AS LOW AS 35 DEGREES F Pagar 91 A-10 Page:
91A4 Page' 9 1-23 97 207 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STEEL PIPING (AF-061 GBD-10) THAT HAS BEEN DEGRADED DilE TO FLOW ACCELERATED CORROSION WITH A LOW ALLOY STEEL (21/4 CR - 1 MOLY) l Figure:
to44 Sheet 3 97-208 REVISES USAR FIGURE FOR THE RF#LACEMENT OF EXISTING CARBON STEEL PIPING (AF-388-HBD-8) THAT HAS BEEN DEGRADED DUE TO FLOW ACCEU4 RATED CORROSION WITH A LOW ALLOY STEEL (21/4 CR 1 MOLY)
Figure-1044 Sheet 4 97 209 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STEEL PIPING (AF-389-HBD-8) THAT HAS BEEN DEGRADED DUE TO FLOW ACCELERATED CORROSION WITH A LOW ALLOY STEEL (21/4 CR 1 MOLY)
Figure to44 Sheet 4 to ET 98-0018 l
Page 21 of 23 l
USAR Change Request Description 97-210 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STEEL PIPING (AF-390-HBD-8) THAT HAS BEEN DEGRADED DUE TO FLOW ACCELERATED CORROSION WITH A LOW ALLOY STEEL (2 ild CR - 1 MOLY) l Figurt 1044 Sheet 4 97-211 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STEEL PIPING (FC-005-DBC-1, FC-006-DBC-1, AND FC-075-HSD-1) THAT HAS BEEN DEGRADED DUE TO FLOW ACCELERATED CORROSION WITH A LOW ALLOY STEEL (21/4 CR 1 MOLY)
Figurt 10 4-10 Sheet i 97-212 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STFEL PIPING (AE 104-ABD-1 AND AE 105-ABD-
- 1) THAT HAS BEEN DEGRADED DUE TO FLOW ACCELERATED CORROSION WITH A LOW ALLOY STEEL (2 ild CR 1 MOLY)
Fgurt 1044 Sheet 1 97 213 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STEEL PIPING (AD-104-HBD-3, AF-287-HBD-3, AF-284-HSD 1, AND AF-285-HBD-2) THAT HAS BEEN DEGRADED DUE TO FLOW ACCELERATED CORROSION WITH A LOW ALLOY STEEL (21/4 CR 1 MOLY)
Figurr 1042 Sheet 3 Fgure-.
1044 Sheet 5 97-214 REVISES FIGURE TO REFLECT CONFIGURATION CHANGE TO THE ELBOW IMMEDIATELY DOWN STREAM OF VALVE AEFV00181 AND AEFV00182 Fgurt 1044 Sheet 1 97-216 REVISES USAR FIGURE TO ADD A BLOW OFF VALVE TO THE COOLING WATER SUPPLY "Y" STRAINERS FOR AIR I
COMPRESSORS CKA01 A AND CKA01B i
Fgura 931 Sheet 1 97-216 REFLECTS TWO MODIFICATIONS THAT AFFECT THE REACTOR COOLANT PUMP LUBE OIL COLLECTION SYSTEM INSTALLED TO MEET THE REQUIREMENTS OF 10CFR50 APPENDIX R, SECTION 111.0 Page.
9 5B 181 Table.
9 5E 1 Sheet 34 Table 9 SA-1 Sheet 55 i
98-003 REVISES USAR FIGURE 9.3-1 TO SHOW NEW DRAINING LINE 6'5 JBD-if2" AND TO CORRECT MINOR ERRORS Fgurr 9 S-1 Sheet i
. 13 ET 98-0018 j
Page 22 of 25 USAR Change Request Description 57-004 REMOVES THE MOTOR OPERATOR OF VALVES ABHV-$6 & ABHV-57 AND REPLACE THEM WITH MANUAL HANDWHEELS Fgur3:
10.3-1 Sheet 3 98-005 REVISES USAR FIGURE FOR THE REPLACEMENT OF EXISTING CARBON STEEL LINE (AC067GBD-18) TO MITIGATE ABNORMAL PlPE-WALL THINNING DUE TO FLOW ACCELERATED CORROSION WITH CLASS GAD MATERIAL (2114 % CR -
1% MOLY, LOW ALLOY STEEL)
I l
l Figura:
10 4-6 Sheet 3 Fgure-10.2-1 Sheet 1 98-006 CHANGES USAR FIGURES TO REFLECT CHANGES IN THE NUMBER 7 FEEDWATER HEATER RELIEF VALVE BEING RE-ROUTED TO THE BLOWDOWN FLASH TANK RELIEF VALVE VENT STACK j
Ftur3:
1044 Sheet 1 Figure.
1048 Sheet 1 98437 CLARIFIES DETAILS REGARDING THE CONTAINMENT COOLERS Page:
6240 Page.
6259 Page:
6256 Table' 6.22.2 Sheet 4 Table:
62.2-2 Sheet 3 Table.
6.222 Sheet 2 TLble.
621-3 Sheet 2 Figur3:
94-6 Sheet 1 Fgure:
62.115 Sheet 98-009 REVISES USAR TO PROVIDE ADDITIONAL INFORMATION WITH REGARD TO OPERATING WITH A PORTION OF FEEDWATER BYPASSED AROUND THE HIGH-PRESSURE FEEDWATER HEATERS Page-10 4-29 Page 10 4-28 Page.
10 4-27 98-010 CORRECTS USAR FIGURE TO SHOW RESIDUAL HEAT REMOVAL (RHR) PUMP 1 TAKES SUCTION FROM REACTOR COOLANT SYSTEM (RCS) HOT LEG LOOP 1 AND TO CORRECT THE RANGE OF THE CONTAINMENT PRESSURE INDICATORS AND ALSO TO CORRECT PARAGRAPH HEADER TITLE Page:
6 3-43 Ttble-7A-3 Sheet 6.1 Fours 64-6 Sheet 98-011 REVISES USAR TO REFLECT THAT START-UP OPERATIONS WITH HEAT ON THE REGENERATIVE HEAT EXCHANGER IS OPTIONAL i
Page-10 4-28 98-019 UPDATES DRAWING M-12FC02 REV.13 (USAR FIGURE 10.4-10) TO CORRECT COMPONENT NUMBERS Figura.
10410 Sheet 1 l
. to ET 98-0018 P6ge 33 of 35 USAR Change Request Description 98420 ADDS M-12EM03 AS A CONTROLLED DRAWING AND ADD A NO(E TO M-12BB01, M-12EM01, M-12EM02, M 12EJ01, M.
12EP01, AND M-12BN01 TO ALERT PLANT PERSONNEL THAT WHEN CHANGING ONE OF THESE DRAWINGS, M-12EM03 MAY BE AFFECTED Fgure 631 Sheet 1 Fgure.
63-1 Sheet 4 Figure.
54-7 Sheet Fgure:
6.3-1 Sheet 3 Fgure:
631 Sheet 2 Fgure 5.11 Sheet 1 98-021 ADDS NOTE TO FIGURES 9.2 2-01 AND -02 T0 INFORM THAT THE BLIND FLANGES MAY BE SEPARATED AND STORED SAFELY IN THE ADJACENT AREA FOR FUTURE USE Fgure' 92-2 Sheet 2 Fgure-02-2 Sheet 1 98 022 REVISES FIGURE TO ADD FOUR RELIEF VALVES Fgure 9561 Sheet 2 Foure:
956-1 Sheet 1 98-023 ADDS NOTE TO FIGURE 9.3-11 TO ALERT PLANT PERSONNEL OF THE REQUIREMENT TO KEEP AT LEAST ONE RECYCLE HOLDUP TANK (RHUT) INLET ISOLATION VALVE OPEN AT ALL TIMES Fgure 9311 Sheet 2 98424 REVISES P&lD M-12WT03 TO SHOW A PIPE CAP ON THE OVERFLOW LINE ON THE ACID STORAGE TANK FOR THE WASTEWATER TREATMENT SYSTEM IN ORDER TO SHOW THE AS-BUILT CONDITION Fgure 9 2-25 Sheet 98 025 REVISES FIGURE 9.3-1-01 & -02 TO SHOW ASSIGNED COMPONENT NUMBER AS THE Y-STRAINER Fgure 931 Sheet 2 Fgure-93-1 Sheet 1 98-026 REVISES FIGURE 9.1-3 & 9.2-15 TO REMOVE THERMAL RELIEF VALVES ECV0996, ECV0997 ECV0998, AND ECV0999 Fgure 913 Sheet i 98-027 REyssES FIGURES TO REFLECT REPLACCMENT OF PlPING MATERIAL TO REDUCE FLOW ACCELERATED CORROSION Fgure.
1021 Sheet 1 Fgure 1021 Sheet 2 Fgure 10 4-8 Sheet 3
1 to ET 98-0018 Pige 24 of 25 USAR Change Request Description 98-028 REVISES FIGURES TO REFLECT REPLACEMENT OF PIPING MATERIAL TO REDUCE FLOW ACCELERATED CORROSION Figuve 10 4-2 Sheet 3 Fgure' 959-1 Sheet 2 98-029 REVISES FIGURES TO REFLECT REMOVAL OF THERMAL RELIEF VALVES ON THE CENTRIFUGAL CHARGING PUMP OIL COOLER HEAT EXCHANGER, SAFETY INJECTION PUMP OIL COOLER HEAT EXCHANGER RESIDUAL HEAT REMOVAL (RHR) PUMP SEAL COOLER HEAT EXCHANGER AND THE RHR HEAT EXCHANGER THERMAL RELIEF VALVES Fgure' 03-1 Sheet 2 Fgare:
9.3-8 Sheet 3 Figure:
9 2-15 Sneet 2 Fgure.
54-7 Sheet 98-030 REVISES FIGURE TO PROVIDE ADDITIONAL DETAIL AND CLARIFY SAFETY CLASSIFICATION OF VENTS AND DRAINS ON THE DISCHARGE S!DE OF THE AUXILIARY FEEDWATER PUMPS SEAL WATER PIPING Figure-10 4-9 Sheet 98431 REFLECTS THE ADDITION OF A LOCAL PNEUMATIC CONTROLLER ASSEMBLY AND TUBING IN THE EXISTING PNEUMATIC CONTROLS FOR THE STEAM GENERATOR ATMOSPHERIC RELIEF VALVES TO PROVIDE LOCAL OPERATION AT THE VALVES. CORRECTS NOMENCLATURE FOR POWER OPERATED RELIEF VALVES TO ATMOSPHERIC RELfrF VALVES WHERE APPROPRIATE Page 10 3-8 Page.
1034 Page.
10 3-5 Page.
10 3-4 Page 9 58-84 Page:
958-51 Page:
9 58-46 Page-958-44 Page:
9 5B-42 TLble.
7A-3 Sheet 51 Table 7A-3 Sheet 43 Table-7A-3 Sheet 42 Table:
7A-2 Sheet 2 Table.
7.73 Sheet 5 Table:
7.74 Sheet 3 Table:
7.7-4 Sheet 2 Table:
77-4 Sheet 1 Taole:
311(B)-3 Sheet 5 Table' 311(B)-3 Sheet 1 Fgurt 10 3-1 Sheet 1 98 032 REVISES FIGURES AND A TABLE TO ENHANCE THE DESCRIPTION OF THE CHEMICAL TREATMENT OF THE FIRE PROTECTION SYSTEM T0ble' 9 5A 1 Sheet 43 Figurt 95-1 Sheet 1 Figure:
92-1 Sheet 3 98-033 REVISES FIGURES TO ADD COMPONENT NUMBERS l
FCure 92-5 Sheet 2 98-036 REVISES FIGURE TO REFLECT THE REPLACEMENT OF START-UP STRAINERS WITH SPACER RINGS Fourt 11.2 1 Sheet 1 Fgure.
11 2-1 Sheet 1
~ Attachre nt 2 t) ET M MiB fage 25 of 25 USAR Change Request Description 98-044 REVISES POST ACCIDENT SAMPLING SYSTEM REQUIREMENTS TO CLARIFY CCMMITMENTS TO REGULATORY GUIDE 1.97 AND NUREG 0737 Page:
18 2-24 Page:
18.2 23 Table:
7A-3 bheet 13.2 Table:
7A 3 Sheet 13.1 Table.
7A-3 Sheet. 13 1 Table:
7A-1 Sheet 7 Table.
7A-1 Sheet 6 i
l I
UPDATED SAFETY ANALYSIS REPORT (USAR) 4 REMOVE / INSERT INSTRUCTIONS REMOVE INSERT volume 1 Coversheet, Rev 10 Coversheet, Rev 11 List of Effective Pages, Rev 10 List of Effective Pages, Rev 11
.63I"L s m Mn& Ldh;2 8 A o.g. :q e
': 250 D'
w-
-: q
- ,3
. ;_i._. '
WLUE"z-m.
- m~a w).
Valume 6 Volume 6 Text 4.0-xiii NONE Tcble 4.1-1 sht 7/4.1-2 sht 1 Table 4.1-2 sht 1/4.1-2 sht 2 Table 4.1-2 sht 2/4.1-2 sht 3 Table 4.1-2 sht 3/4.1-2 sht 4 Tcble 4.1-2 sht 4 NONE Figure 4.2-1/4.2-2 Figure 4.2-1/4.2-1A Figure 4.2-2A Figure 4.2-2/4.2-2A Figure 4.2-3/4.2-4 Figure 4.2-2B/4.2-3 NONE Figure 4.2-3A/4.2-3B Figure 4.2-5/4.2-6 Figure 4.2-4/4.2-5 NONE Figure 4.2-6/4.2-6A yigure 4.2-11/4.2-12 Figure 4.2-11/4.2-11A
)NE Figure 4.2-12/4.2-12A
" Figure 4.2-13/4.2-14 Figure 4.2-13/4.2-14 Figure 4.2-15 Figure 4.2-14A/4.2-15 Text 4.3-41/4.3-42 Text 4.3-41 Text 4.3-43 thru 4.3-53 NONE Table 4.3-6 sht 2/4.3-6 sht 3 NONE Valune 7 Volume 7 Table 6.2.2-7 sht 3/6.2.2-3 Table 6.2.2-2 sht 3/6.2.2-2 sht 4 NONE Table 6.2.2-3 Valune 8 Volume 8 NONE Table 7.1-2 sht 5 thru 7.1-2 sht 13 Valume 9 Volume 9 Table 8.3-4 sht 34/8.3-4 sht 35 Table 8.3-4 sht 34 l
Table 8.3-4 sht 36 NONE (CONTINUED ON NEXT PAGE)
All Change Request sheets found in front of Figure Drawings should also be fN.movedfromyourbinder (if applicable to your distribution).
O Page 1 of 2
UPDATED SAFETY ANALYSIS REPORT (USAR)
REMOVE / INSERT INSTRUCTICNS REMOVE INSERT
)
\\'Ttble 9.1A-7/9.1A-8
/
Tarle 9.1A-6A/9.1A-7 Table 9.1A-9/9.,1A-10 Table 9.1A-8/9.1A-9 NONE Table 9.1A-10/9.1A-10A Tcxt 9.3-81/9.3-82 Text 9.3-81 V?lume 12 Volume 12 Text 13.2-25 thru 13.2-29 NONE V Gume 13 volume 13
. Text 15.4-43 thru 15.4-46 NONE l
V?lume 14 volume 14 Taxt 17.2-49 Text 17.2-49/17.2-50 r
nb i
l 4
I All Change Pequest sheets found in front of Figure Drawings should also be
[)'7movedfromyourbinder (if applicable to your distribution).
Page 2 of 2
-