Forwards Background Info on LPSI Pumps & HPSI Pump Item. Task Interface Agreement 84-13 Also Encl
ML20216E083
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/15/1984
From: Narbut P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Licitra E
Office of Nuclear Reactor Regulation
Shared Package
ML20216D344 List:
References
FOIA-87-261 NUDOCS 8706300637
Download: ML20216E083 (2)


Text

e d

2 Trom T). u r Li Rg _ T_

to E.. _i alem, knit,%dMr% bu a

6kgowsd'ido I km Orad is at:

LT6 1 pa #.

he HPST e

w pa.9 km Q

D E R.

B S - (o f 63-'lo sh El B3-9 bh-3 82.-3 5 8I-52.

hk

~

to oa s

~2An3 err 60

'D off 870623 DR HOLMESB7-261 PDR 0h

4/

v TASKNO.:h-b TASK INTERFACE AGREEMENT TAC #:%.M4gl%Ik DATE:

141435 PROBLEM:

Palo_ Verde, LPSI Pump Problems LEAD OFFICE:

I&E X

NRR REGION JOINT NOTIFICATION:

REFERENCES:

Memo to D. Eisenhut from T. Bishop, dated 2/6/88,

Subject:

Transfer of Lead Responsibility for Evaluation of LPSI Pump Problems.

ACTION PLAN:

NRR:

1.

Evaluate licensee findings and corrective actions regarding LPSI pump problems.

Problems concern the pump's failure to start and failure to produce the required head.

(E0B Lead, RSB assist) 2.

Prepare Palo Verde SER input, as appropriate (E0B/RSB) 3.

If problem appears to be generic, prepare appropriate recorrnendations for staff action and previde to DL.

May include NRR actions or IE specific correspondence (EQB/RSB).

Region V: Assist in obtaining additional information from applicant, as appropriate.

Completion: 4/30/84 NRR: Designate Lead Project Manager to assign TACs and coordinate correspondence, meetings, and reports (LBf3 M. Licitra).

Prepare response to Region V for DL signature.

OFFICECOORDINATOlRS:

7lb

/1 jf

)./r7,l[,-

Gary Holahan' r

Rv Vp11mer (x27207)

,'.R.Ma.yutts'on'[4(x27373)

APPROVED:

2 x27425)

(l&E)

M T. Bishop b_ (x (Region V

)

//

F. Mira (x27492) cc:

V. Stello,ROG' R Reginnal Adms.

H. Thompson,DHFS R. Wessman,DL J. Heltenes,AEOD T. Speis. DST G. Polahan,DL J. Partlow,IE R. Mattson,DSI V. Noonan J. Taylor,IE D. Eisenhut,DL G. Bagchi E. Jordan,IE R. Vo11ner,DE T. Marsh M17.6D,@,'$

F. Miraglia,DL B. Sheron G. Lainas DL Y

T. Novak,DL E. Case,NRR

[pm as o:,,,

  • 4 UNITED STATES g' f
f. (

' NUCLEAR REGULATORY COMMISSION a

[

REolON V fg * \\

  • g*

1450 MARIA L ANE,$UITE 210 WALNUT CREEK, CALIFORNIA 94596 FEB6 1984 MEMORANDUM FOR:

D. G. Eisenhut, Director Division of Licensing, NRR

~FROM:

~~

T. W. Bishop. Director Division of Reactor Safety and Projects

~ TUBJECT:

REQUEST FOR TRANSFER OF LEAD RESPONIBILITY FO LPSI PUMP PROBLEMS AND MODIFICATIONS AT PALO VE GENERATING STATION There has been a series of problems with the LPSI pumps in Units I and 2.

tdsting in 1983, pumps failed to start on a number of different occasions. During LPSI pumps in Unit I had a Total Head of 315 and 297.7 ft. compared to the The required 335 ft.

l The pumps have been disassembled and inspected under Ingersol-Rand super on a number of occasions.

Modifications were made on the pumps and again tested

~

during the week of January 30, 1984.

as required.

At least one pump again failed to start Region V requests NRR assume lead responsibility for the evaluation of the mo cations and the pump failure to start problems.

problems to Region V on DER 83-61, copy enclosed.The licensee has reported these Should you or your staff have any questions regarding this request, please con me or Mr. Fiorelli, the resident inspector.

IW lp T. W. Bishop, Director i

Division of Reactor Safety and Projects

Enclosure:

As stated i

cc:

G. W. Knighteti, HQ E. Jordan IE:HQ G. Fiorelli, Palo Verde p /D

(}

v c~ I a

ou o

.) '

v

- - - - - -