ML20215N393
| ML20215N393 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/20/1981 |
| From: | Cowan L, Kile J TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20215N324 | List: |
| References | |
| M&AI-7, NUDOCS 8611050337 | |
| Download: ML20215N393 (4) | |
Text
.
o o o gis rt=pasargypwteCONyn p;
.o c
g::s pgggya w
,y l
Sequoyah Nuclear Plant DISTRIBITTION I
IC Plant M,.c., rei Pwr Plant Superintendent MODIFICATION AND ADDITIONS Assistant Pwr Plant Supt. (Oper.)
INSTRUCTION 10 Assistant Pwr Plant Supt. (Maint.)
Assistant Pwr Plant Supt. (H&S)
M&Al-7 Administrative Supervisor l
Maintenance Supervisor (M)
ELECTRICAL PENETRATION SPLICING, IU Assistant Maintenance Supervisor (M)
CABLE SPLICING AND CABLE REPAIR IC Maintenance Supervisor (E)
INSTRUCTIONS IC Assistant Maintenance Supervisor (E)
I Maintenance Supervisor (I)
Results Supervisor Operations Supervisor IC Quality Assurance Supervisor Health Physics Supervisor Public Safety Services Supv.
Chief Storekeeper I
Preop Test Program Coordinator IC Outage Director Chemical Engineer (Results)
I Radiochem I.aboratory Instrument Shop Reactor Engineer (Results)
I Instrument Engineer (Maint. I)
Mechanical Engineer (Results)
Plant Services Supervisor Training Center Coordinator I
Prepared By:
Lynn Cowan Public Safety Services - SNP Shift Engineer's Office Revised By:
Jan Kile Unit Control Room I
Submitted By:
Health Physics Laboratory IU Nucir Document Control Unit
/ Su'pe rvi sor 10 Pwr Plant Superintendent, WBNP G
Pwr Plant Superintendent, BFNP I
PORC Review: _
,,fw/ si Pwr Plant
- Superintendent, BENP Datd IU NEB-K Resident NRC Inspector - SNP Approved By:
a fh IC NSRS-K I
Pwr Plt Superintendent Technical Support Center Unit Control Room #2 Date Approved:
ss/aw/#/
Compliance Section Staff Supervisor IC Asst. Outage Director IU Outage Director, Watts Bar I
Rev. No.
_Date Revised Pages Rev. No.
Date Revised Pages 0
11/8/79 All
_1 3/4/80 Revised 1,2,18,19,46, 47,48,Added 50-56 and Title Change 2
h 49,55,56 I
The last page of this instruction is Number 56 I
86110S0337 861031 PDR ADOCK 05000327 p
f 0 0 0 3 6' ng SQNP N
C H&AI-7 I
Page 4 of 19 Rev. 0 6.0 PHOCEDUHE (Cont.)
A.
(Cont.)
Either noninsulated or self-insulated butt splices may be installed in systems of 600V or less and wire size No. 10 AWG and smaller. Self-innulated butt splices within the primary containment shall be either I
Terzel (Thomas and Betts Company) or Kynar (AMP Special Industries). The vinyl or nylon self-insulated fittings are intended for applications where the total temperature of the conductor does not exceed 105'c (221'F).
I Splices of 600V or less, wire size No. 8 AWG and larger, and those of the noninsulated type for smaller wires shall be insulated with Ray-I chem Corporation WCSF-N splice covers and installed in accordance with the manufacturer's instructions using an electric heat gun (do not use torch with open flame) available from Raychem as the heat source.
Unless otherwise noted on design drawings, rahles with rubber or rubber-like (nalicone) 125*C or a; ore insulation, in systems of 600V or less, shall be spliced by one of the following procedures:
a.
Install r.oninsulated butt splice of appropriate size and build up over exposed copper surfaces with 3M Company, Scotch 70 tape (temp-I crature rating of 180*C) to a thickness equal to the original in-sulation. The use of Raychem's WCSF-N shall be used as a replace-ment for the Jacket material, b.
For splices in multiple-conductor cable, splice and insulate the single conductors in accordance with a. above. The use of Ray-chem's WCSF-N (section 2.2.3) shall be used as a replacement for I
the Jacket material for the overall Jacket, and shall be installed as shown in Attaciunent 2.
I' r.
Install self-insulated butt splices for wire size No.10 AWG and nmaller. Self-insulated butt splices shall be either Tefzel or Kynar. Thenc self-insulated butt splices are intended for ap-piirations where the total Lcmperature of the coaductor does not exceed IS0*C (300*F),
e.g., within primary containment.
The following list serves as a guide only to the splice types (attached) for the various penetrations:
I I
I
- u.
.a g,g' j.
p.,.,,
0 0 0 3*.6 2 l. ] 0, 4 3.g
~
Sequoyah Nuclear Plant Review Transmittal Infor:::a1 PORC Review
- n=tr2ct:ca
..c.
Mr.AT-7 ELECTRICAL P EETRATION SPLICING, 7.evtston io.
7 Title cARTT 5:Pf.TCTNC AND CARTT RFPATR INSTRUCTIONS Review n:ct ne :ompicteo in the time indicated. Attaen ecceente by marking up the instruction or attacning additional cheets. The orttinator of each corament should be identtiicd b/ his initials.
FLZ.\\SE ~0:!?LETF. TOCR REVIEW IN
'iORKING DAYS Occrations Suoervisor:
Date Reviewed /B /7[dl Signed /
j M::n unanca 5 :pervisor (?!):
Date Reviewed
/pdeh'r Si:;ned JP//* ! _,
f.
'!atntenance :;u;)crvthor (E):
Date Reviewed tolulet Signed k
'fa nt nance.:u nearvisor t.I):
Date Reviewed e nA Signed
' pdm
.'*ea l th Phve. :<::.it :
Date Reviewed
/0 L Signed
'.:1 ity.t u.u r a nc.: Sunervssor:
Date Revtewed _ f e/,a >// Signed fr/ h 7
.te w l :. : ::nne rv i :o r :
Date McViewed fo/ M/gr Signed
,A 1.
- .s ie r.v in:n nee r:
Date Reviewed
$hI Signed A)/A i.
/icatstmt Plant :fanager:
- 3. ate Reviewco Signed
/
10.
?lant ta n::; :r:
Date Reviewed /6-84-8/
Signed /I[d/
~
11.
to re:oive PORC comments'.and return to PLANT
. *y..o.r*...m.
s.g - es -.. u..
~
/
ORIGINATING SUPERVISOR DATE
!2.
?*.ld;T !??. VICES tor incorporating cocnents.
r///-
/ // J Initials -
Cat
...............................................____...............e 13.
tibr /
to revtew finst copy for FORMAL PORC.
- W' i/Ho-81 O (IGisATING SUPERVISOR DATE l '..
?L.'.:iT ';;;3V!CP.S coversheet verification.
M
/_//.7() //
Initials D/
.............__.........................................................te P.EAECN FOR.E V!S:0N.
(Checx appropriate reason (s) ar.d clarify reason in remarits) 1.
Change in ? cility Design.
2.
Change in Tech Suces or performance characteristics.
3.
C: ant:r ta c::urove datety of operation.
I..
Change to clartf r, correct, expan<s. or simplify procedure.
5.
Other, aptain in ecmarxs.
REMARKS: Add place for workplan number or MR number.
ri
. m. -
.'::+'t&.
--" % '-~%
=_- - 2
O O362 l 3Q7 P
Standard Practice Page 2 SQA119 3/19/81 f
D/Yes ription of Change (Include TACF, Instruction or STEAR Number)
A.
a,rbco /sv um}dsr mamle su n1P mods s AWAT 'i 4-z g
B.
(1) Is the facility or instruction being changed described in the Safety g
g Analysts Report?
Yes
/
No NA (2) Is the test, experiment or activity described in the Safety Analysis Report?
Yes No t/
NA If the answer to (1) is yes or (2) is no, then complete Sec ion C.
llAf)
/0
/
ignature/Date'
'~
C.
Unreviewed Safety Question Determination L*
(1) Is the probability of an occurrence or the consequences of'an acci-dent or malfunction of equipment important to safety previously j
evaluated in the Safety Analysts Report increased? Yes No
/
I Ex 1anation d}un twe 5n.Lo lo dbutNAidbru adl@6Y1/bdk nariL _
Dat' bt Arn6m r%&rJh.
b 1a 6 & s/ i Niunnt. m/JNAu d
t N @rn/ at/;uv/t rof nede t/L./2m,> De// n f A iersu ou i
(2) Is the possibility for an accident or malfunction of a different type
(
than evaluated previously in the Safety Analysis.
Report created?
Yes No
/
Exp)anation dw_ Art,v. u),,n ah42sf6ua$ o dNA/xb$Jo-ACtl&ftx8 6tAmt/ ku??dn> f)ur u mo uurne/L h n /.f'a AJ_ /
t J'
f (3)~ Is the margin of safety as defined in the basis of any technical specification reduced?
Yes No
/
Explanation h andD7bNs (b /1st A)$11 ftb/1MfArnkteti l
- s. b' w Alt. @ ney n, c/
/
~d'
(
/
/0 iP/
/ Signature /Datd D.
PORC concurs with the above evaluation.
a_.srt n/as/&
PORC Chairman /Date' f
E.
Pl. ANT SUPERINTENDENT concurs with the ab'ove evaluation.
WW g'
Plant Superintendent
_