ML20215L219

From kanterella
Jump to navigation Jump to search
Environ Protection Plan 1986,Noise Related Questions/Complaints
ML20215L219
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/31/1986
From:
DUKE POWER CO.
To:
Shared Package
ML20215K614 List:
References
NUDOCS 8705120139
Download: ML20215L219 (5)


Text

ATTACIBEENT 3 CATAWBA NUCLEAR STATION ENVIRONMENTAL PROTECTION PLAN NOISE RELATED QUESTIONS / COMPLAINTS 1986 I

D K

5 00 13 R

PM t

g*V C0g nectivt0 'Y s JAN 231986 CATAWBA NUCLEAR STATION D.

RESIDENT COMPLAINT FORM q.

SER16

~

DATE: January 22, 1986 Tommy Smith Catawba Information Coordinator TIME: 8:45 a.m.

ext. 3000 I.

COMPLAINANT:

Name Pat Heavner Address 4251 Acacia Road - Old Concord Shores Phone - Home 831-1223 Business II.

TYPE OF COMPLAINT:

Description This morning at about 5:45 a.m. Mrs. Heavner said that she heard a noise coming from the plant that sounded like a lot of steam being let off.

At approximately 8:40 she also heard

(

a siren. (Div. Ops was testing a siren near their residence)

Severity She was primarily concerned with the olant's status rather than complaining about the noise.

Previous Occurrences III.

COMPLAINT SITE:

Address same Orientation with respect to plant (distance and direction).

Approx.1 mile SE of plant Terrain (hilly, flat, type of vegetation)

IV.

PLANT OPERATING CONDITIONS:

Units in operation / respective loads Unit 15-10% power up Accordina to shift sunv. we had lifted steam generator PORV at that time.

Recent start-ups and shut-downs start-un in orngrate Recent operational malfunctions

~


_--_----)

4 V.

COOLING TOWERS:

Number of towers in operation l-Number of fans in operat.on VI.

METEOROLOGICAL CONDITIONS:

Approximate wind direction very C. lear Weather conditions very clear l

VII.

FOLLOW-UP:

l

- Date and time resident was contacted: same j

I was able to satisfy her need for information.

Information given: I told her there was no need for concern and that the " noise was related to re-start of Unit 1.

I also explained the siren maintenance near her home.

It is my feelina

-that had she not also heard the siren test. she would not have 1

even called.

Corrective Actions:

Duke Power Company involved in follow-up/ corrective action: none reautred I

't I

e

- - - +,.,

e, - -, - -,

e-

,---m

,,-w w

a~,

e,,,-

.wsw---

e

,-e,w-,,e

- -,,, - -, -,,, ~,,.

e--

.-,.-,-e.,,---w,-

a, ger

--we--,,-

cW. Co%,h RECEIVED 9

7 3 1986 CATAWBA NUCLEAR STATION N

c' RESIDENT COMPLAINT FORM W

n y

3,/

I COPY: R.T. Simril.

T" #

DATE:

4-50-90 a.wraampto.e

(

\\.S. Carter' - Nuc Prod, WC-23R J

TIME:

'2146 Tommy Smith NAME: TfTg M orf\\509 9 tud NW I.

COMPLAINANT:

Name 6HA. Q A R$iL\\ S Address 4QQ(p LMaw Msu GLD Phone - Home Q ~51 - % 1'l._

Business RCT\\W.ED II.

TYPE OF COMPLAINT:

Description "Souwden LstE A.a Asa., (nups;terroie.."

OR ".TAtd 4 AWVw-f;L "

/Wices geraDEn TuC cam-Q(,Ags)T APA6MtATEtM AB rxDLAfME D mF STt Arn (2ELEW5lE.

Severity Previous Occurrences MC MMLf DOdFMTU4 cat t I TME.

JTATtON FOL dAO 00R 12.EAcoed S.

III.

COMPLAINT SITE:

l Address SAmg 4S A Psortes T RE SsOEN CE i

Orientation with respect to plant (distance and direction) l. T v.u.omeTeet,s Nog.Tg.vdesT oF PLAMT Terrain (hilly, flat, type of vegetation) W il Q 'Tr g IV.

PLANT OPERATING CONDITIONS:

Units in operation / respective loads lleM 'l - N\\coE 'i.,

N C 9tters-PSar v2.w. 04cr 2.- Mme 3 N t. azer Pnc-22 3s Recent start-ups and shut-downs Recent operational malfunctions ONtT 2. $Te-4,vi 'Recc e t 2 MS~

&} G kf M ec I

t

-e.

V.

COOLING TOWERS:

Number of towers in operation 3

ufM Mot A coo W J6r w syt as tate n Mot sE Number of fans in operation VI.

METEOROLOGICAL CONDITIONS:

Approximate wind direction 6moh f% \\930 S$WO Weather conditions _ ('2 raa.

VII.

FOLLOW-UP:

Date and time resident was contacted:

F Sb 10:00 AM Information'given:

EXhdh "Ib NR MSS TMAT Tarse %A,w 6 :14se.s vueses c_omersi oce.uas,

$ TART-OP mo MT-hJtd MW.E AN O AT AW h TAAr4T-foal E NJeisAr2. EErputuueo deJrr 1 ATATus Ar4B THAT Nb(2_E occ.uQ Ard cEX wfET2E FoRit+ Cc4A m]Cr EdT A3DT TO BE' i

_ ALAemrD. THE Siente klooco Acric4 MaanaoQ.s or A PRostEM.

Corrective Actions:

Duke Power Company involved in follow-up/ corrective action: "Tdmmq Srm tv4 I

C O W\\tweeJ rti GC t A TtOr4 5 63 ( - 7Jo 5'"7

. A \\c R O - B'bl

~3 0 0 o

..