s' 3799 Y

DOLKriEP u%HC June 15,198E7 JLN 17 P5 :30 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION OFi r;..

00CuriiN ch.

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD F

in the Matter of

)

)

TEXAS. UTILITIES ELECTRIC

)

Docket Nos. 50-445-OL COMPANY, ET AL.

)

50-446-OL

)

(Comanche Peak Steam Electric

)

Station, Units 1 and 2)

)

NRC STAFF'S FIFTH PROGRESS REPORT AND ANNOTATED BIBLIOGRAPHY 1.

PROGRESS REPORT This prog ress report is prepared in response to the Licensing Board's " Memorandum and Order (Progress Report and Notice of Available Documents)" dated June 6,1986.

1.

ORGANIZATION AND STAFF On March 19, 1987, the EDO further identified the organization and staff assignments for the newly formed TVA and Comanche Peak Project Divisions in the Office of Special Projects (OSP), issued details on the specific functions for the Office, and delegated to it certain authorities (Enclosures 1 and 2).

The present organization chart, excluding existing i

vacancies, for the Comanche Peak Project Division (CPPD) is attached (Enclosure 3).

The CPPD headquarters staff has been consolidated into one location in Bethesda, Maryland.

At the Comanche Peak site, CPPD

]

site personnel have been relocated into a new office building, which is 8706250247 870615 38O]

PDR ADOCK 05000445 Q

PDR

]

F y,

.' sufficiently large to accommodate the entire CPPD staff.

Logistical support and equipment are being procured to enable the onsite NRC Inspectors to work more effectively and to enable the Staff to issue reports and correspondence from the site.

CPPD policy is that all CPPD staff perform their review and evaluation of specific technical issues at the site as much as possible.

Effective May 24, 1987, R. F. Warnick was assigned to the Comanche Peak site as Assistant Director for inspection Programs for CPPD.

The onsite NRC inspectors have been organized into three groups, Operations, Construction, and Comanche Peak Response Team (CPRT), with the lead individuals being D.

Kelley (Senior Resident, Operations),

S.

Phillips (Senior Resident, Construction), and I. Barnes (CPRT).

W. Smith has been selected as Resident inspector, Operations, and will be on site in June 1987.

Efforts are in progress to add additional experienced personnel to the inspection staff.

In the future, each group of the onsite inspection staff will issue a monthly inspection report.

In accordance with the EDO objectives (Enclosure 2) the CPPD will perform all necessary routine licensing functions, evaluation of the Applicants' CPRT efforts,

including c corrective

actions, and most inspection activities.

The CPPD will utilize Staff resources in other offices if such effort had been initiated prior to the formation of OSP, if the effort is generic, or if special expertise is required.

in particular, CPPD will be supported by Region IV regarding radiological controls, security and safeguards, emergency preparedness, and operator licensing (Enclosure 4).

t

'l 2.

DISCOVERY Discovery (i.e., depositions) in the operating license proceeding by Intervenors against the Staff has not been completed, consistent with an agreement between the Applicants and Intervenors. II Letter from R. K.

Cad to Licensing Board, dated April 14, 1987.

1 3.

CONSTRUCTION PERMITS The status of the Staff's and App!! cants' appeal in the Unit 1 Construction Permit extension proceeding has not changed.

By letter dated April 29, 1987, Applicants applied, pursuant to 10 C.F.R. 50.55(b), for an extension of Construction Permit CPPR-127 for the Comanche Peak Steam Electric Station, Unit 2.

The current permit has a construction completion date of August 1,

1987; the requested new completion date is August 1,

1990.

The application is under Staff consideration.

4.

STAFF REVIEW AND EFFORTS The. Applicants provided to the Staff an overview on the CPRT efforts and the associated corrective action program (CAP), in two public meetings on April 2 and 7,

1987, in Bethesda, Maryland and Dallas, Texas, respectively.

Because of changes to the CPRT Program Plan since Revision 3 was issued (January 27, 1986), in a letter dated May 12, 1987, j

)

-1/

The Staff notes its disagreement with CASE's characterization on page 3 of CASE's Fifth Progress Report regarding the scope of Chairman Bloch's March 2,1987 telephone call.

i

_4-the Staff requested the Applicants to issue Revision 4 to the plan, including the details as discussed in the two meetings.

The Staff also' requested information on and clarifications of the present scope, purpose, and objectives of major ongoing programs and evaluations necessary for the licensing of Comanche Peak, and the differences and interrelationships among programs.

The Staff intends to use the information provided by the Appilcants to develop a comprehensive review and inspection program for Comanche Peak licensing activities.

Since the last progress report the Applicants have submitted eight i

results reports.

To date, NRC has received 35 results reports for review.

The CPPD headquarters staff visited the site during the week of May 18, 1987, to inspect and audit selected efforts by the Applicants.

5.

ONSITE INSPECTION ACTIVITIES The NRC onsite inspectors and consultants continued their inspections in operations and CPRT areas.

During January and February 1987,- NRC inspectors and consultants conducted a team inspection of the Applicants' CPRT evaluations of the safety significance of the Applicants' inspection and documentation findings.

Results of the team inspection are being documented in inspection Report 50-445/8704; 50-446/8704.

NRC inspectors identified the following three major concerns:

a.

By letter dated September 5,1986, Brown Boveri, supplier of the Class 1E 6.9 kv circuit breakers, notified the Appilcants that a seismic event could cause malfunction of the breakers because of the excessive slope of the concrete floor.

On November 27, 1985, the 1

i

s Applicants issued a nonconformance report for ' the excessive slope..

NRC observed the repair work on February 13, 1987, the ~ same day the Applicants made notification per 10 C.F.R. 50.55(e).

Results are documented in Inspection Reports 50-445/8703, 50-446/8703; and 50-445/8607, 50-446/8706.

The failure to report this deficiency to the NRC earlier is being pursued.

b.

The NRC inspectors have questioned the timeliness of the Applicants' determination. of reportability under 10 C.F.R. 50.55(e) for all nonconforming conditions.

The NRC Resident inspectors have expressed this concern to.the Applicants.

1 c.

The Staff has questioned the Applicants' procedures for controlling system cleanliness from construction until turnover to operations.

The NRC onsite inspectors have requested a

meeting with representatives of construction, start-up, and operations to resolve this concern.

II. ANNOTATED BIBLIOGRAPHY The following annotated bibliography is a computer-generated report prepared from the NRC's document control system.

It contains separate ilsts' of all documents originated by NRC that have been sent to the Applicants and to Intervenors relating to the Comanche Peak Project that

o 1 were indexed during the period February 14, 1987 to May 31, 1987,

)

inclusive. 2,/,

As explained in the Staff's First Progress Report, the listing of any particular document does not constitute a determination by the Staff of the document's relevance to either the OL proceeding or the CP extension proceeding.

Respectfully submitted, l

G ry

.- Izuno Counsel for NRC Staff Dated at Bethesda, Maryland this 1% day of June,1987 i

-2/

lt should be noted that there is a delay between the issuance of documents and the actual indexing onto the document control system.

Thus, the list may not contain all documents sent through this period.

Later-dated documents will appear in subsequent bibliographies.

ENCLOSURE I

/

\\

UNITED STATES

  • l f NUCLEAR REGULATORY COMMISSION I

.f.

msHWOTON, D.C.30SES

...../

MAR 191987 c,iW MEMORANmW FOR:

Office Directors and Regional Administrators FROM:

Victor Stello, ir.

Executive Director for Operations

SUBJECT:

OFFICE OF SPECIAL PROJECTS OPERATIONAL DETAILS My memorandum of February 10, 1987, announced the establishment of the Office of Special Pro.iects to. deal with the complex regulatory issues associated with the TVA and Comanche Peak' projects. The purpose of this memorandum is to describe the assignment and location of OSP staff members..

OSP became operational March 1, 1987. The staff members to be assigned to OSP.

effective March 29, 1987 are listed in Enclosure 1.

Additional people will be detailed or reassigned on an as needed basis. Actions affecting bargaining unit employees will be taken in accordance with the collective bargaining -

agreement. Individuals detailed or assigned to OSP will return to their regular or comparable positions upon completion of their assignments.

I A current organizational chart identifying OSP management and supervisory personnel is attyhed as Enclosure 2.

OSP management can now be reached on FTS-492-7761.

. All OSP Headquarters staff will likely be consolidated into the East West /

West or Air Rights buildings. Telephone nutrhers of assigned personnel will be issued after office assignments have been made.

The Assistant Directorates for Regional Operations will be in RII for the TVA projects and the Comanche Peak site for that project. Office space, travel.

and T/A support for the OSP regional staffs will be provided by the regional offices except that special arrangements will be made for Comanche Peak personnel located at the site. All other support will be handled through Headquarters.

.6.?

.l. -) /'/W_./7

(. $

Victor Stello, 0.

/

Executive Director for Operatiers

Enclosures:

As stated

p.

0FFICE OF SPECIAL PROJECTS

  • Keppler, James. G.
  • Axelrad, Jane A.

Zaleman, Barry Williams, Cordell C.

Grimes, Christopher I.

McKee, Phillip F.

Sapp, Mary Lynne Lyons, James E.

Morris, Carol V.

Schierling. Hartmut(eff. June 1)

Vietti-Cook, Annette Berney, Catherine E.

Norkin, Donald P.

Ashe, Frank Gower, George C.

Terao David Childers, Linda Warren, Wanda S.

Barnes, Ian Kelley, Dennis L.

Wagner,PhillipC.

Phillips Harry S.

l 1

Ha e, Clifton J.

Tapia, Joe I.

E11ershaw, Lawrence E.

  • Ebneter Stewart D.

{

Richardson, Steven D.

Goodwin, Edward Meador, Sheryl Zwo11nski,-John A.

Griffin, Noma Jean Wilson, Patricia Jamerson, Carole A.

Auluck,Rajender Gears, Gerald Stang, John Donohaw, Jack N.

Rotella. Thomas j

Holonich, Joseph Singh,Braj Fields,Mel Kelly, Janet Liaw, Boen-Dar Belmaggio, Veronica. J.

Pierson, Robert G11 ray, John W.

Kim, Sang Bo Watt, James Hubbard, George T.

Wescott, Rex G.

Goodman, Claire Marinos. Evangelos C.

Garg, Hukam Hearn, Peter C.

Reinhart, Frederick M.

Hermann, Robert Georgiev, George B.

Fair, John R.

Smith, David E.

Zech, Gary G.

Barr, Kenneth P.

Upright, Charles M.

Mattox, Deborah L.

Jones, Shirley A.

McCoy, Frank R.

Carroll, Robert E.

Brady, Joseph Jenison, Kenneth M.

Harmon, Paul E.

Poertner, William R.

Branch, Morris W.

Loveless, David P.

Hansell, Betty E.

Ignatonis, Algis J.

Johnson, Arthur Poston-Brown, Martha Paulk, Gerald L.

Patterson, Charles A.

Brooks, Charles R.

Elrod, Stephen A.

Huengs, Gordon York, John Bearden, William C.

Conort Euanice P.

Walton, Glenn A.

Humphrey, P. Gray Davidson, Linda'J.

Powell Thomas Menning, John E.

Detailed to 05P

__q

)

ga N

~

N I

s 8l-

~

m w.

E I

aE w

E e-n2g a.

i lll E E l

l:.gil "a

  • 5

=!

[b 1 1 il B!

lE' Ii E-aE g g:

l I' s

1 s

!s E

, wg55

'~

~

c Saj E l Eg !{ !

!i 5

31s 333 33

!lEs5 lsw EN I

Is

=

me l, me{

i e

lmei k:

1.

E 5

E'l'E*

l g*

I ll=s la. a lil v-si i

5 I5 s, a

aI g e, Es, ln ".d.

a Elwl a

E E

a I s1 aB g

l*

E ag gga Es

,n e

g_

Es*lj lsl

{

c *.

u ".

aI

((*

E

=

]

ENCLOSURE 2

'o UNITED 8TATES g

NUCLEAR REGULATORY COMMISSION

[Y g

\\

wasmMGTON, D. C. 20655 4

~

k,e...+

MAR 191987 HEMORANDUM FOR:

Janes G. Veppler. Director Office of Special Projects FROM:

Victor Stello, Jr.

Executive Director for Operations

SUBJECT:

DELEGATION OF AUTHORITY TO THE OFFICE OF SPECIAL PROJECTS Effective' February'9,1987, the Office of Special Projects was established.

'That office is to efficiently and aggressively:

1) assure the identification and resolution of those problems which gave rise to the shutdown of TVA's Sequoyah and Browns Ferry' facilities.and of steps necessary to prevent their recurrence; and 2) evaluate TVA's Wetts Bar and Bellefonte and Texas Utilities' Comanche Peak facilities in order to detemine compliance with the Comission's regulatory requirements; to assess whether identified problems are on a path to an acceptable solution, and where not, to identify acceptable solutions

,g necessary to enable the staff to complete its licensing reviews of these facilities, consistent with the NRC's statutory mandate to protect the health and safety of the public.

To carry out these functions, the Office of Special Projects is hereby delegated the authority to:

Take all actions, except an enumerated helow, associated with the licensing of the TVA facilitias and the Comanche Peak facility, including determinations of complierce with or issuance of exemptions from the regulations.

The Directer, Office of Special Projects, is not delegated the authority to issue or revoke construction permits or operating licenses. That authority is retained by the EDO.

Perform all safety and environmental reviews and evaluations and issue i

associated safety evaluations, environmental assessments, environmental impact statements, and other related documentation necessary to support its advice and reconnendations to the EDO regarding licensing decisions pertaining to the TVA and Comanche Peak facilities.

Cenduct inspection activities related to the licensing of the TVA and Conanche Peak facilities.

Conduct enforcenent activities including conduct of enforcement conferences, issuance of notices of viola *.icn purscent to 10 CFr 2.201, and issuance of proposed civil penalties pursuant to 10 CFR 2.205 subject to the approval n' the Director, Office of Inspectien and Enforcenent, until April 12, 1907, and thereafter, the Deputy Executive Director for Regional Operations.

o,

Issue orders for the modification nr suspension of licenses pursuert tn 10 CFR 2.202 and 2.204.

Erfnrcement orders are to be coordinated with the Deputy Executive Director for Regional Operations. Licensing i

orders are to be coordinated with the Director, Office of Nuclear Reactor Regulatien.

Take appropriete action on requests by persons under 10 CFR 2.706 to modify, suspend, or revoke e license, or for such other action as may be proper.

Take necessary or appropriate action in accordance with the decision of I

)

an Administrative Law Judge, an Atomic Safety and Licensing Board, the Atomic Safety and Licensing Appeal Panel, or the Commission after hearings, pursuant to 10 CFR Part 2.

Serve as the principal point of contact for the NRC with the Advisory

{

Comittee on Reactor Safeguards for matters under review by OSP.

I Develop procedures to assure the timely scheduling, review, and processing j

of all matters under review by the Office.

Administer oaths and affirmations, and issue subpoenas where necessary and appropriate pursuant to section 161c of the Atomic Energy Act of

{

1954. as amended, to enable the Director to conduct examination o' matters within the functions and authorities of the Office of Special f

J Projects.

Identify research needs required for the above programs.

Issue appropriate Federal Repister notices in connection with the actions delegated herein, including notices which offer an opportunity for public hearing in connection with the action proposed to be taken, whether or not required by statute or the Comission's regulations.

Supervise, direct, coordinate, and approve the activities, including ahinistrative functions, of the various organizational units within the Office.

Perform such other functions as may be assigned.

Redelecation:

The Director may, except where expressly prohibited, redelegate to others the authority delecoted to the Director by this or other official directives or communicatiers, sub.iect to the limitations stated herein and to such i

other stipulations as the Director may decn necessary.

I D

e 3-Such redelegation must be made in writing and a copy filed with the Executive Director for Operations. SECY, OGC, RM, and ADM.

The Director may stipulate any limitatinns on further redelegations nf authority which the Director redelegates.

To the extent that this delepation is inconsistent with my February 10, 1987, mennrandum establishing the Office of Special Projects, this delepation i

supersedes that remorandum, C '.

m

\\

ga, 6Mf'-

c Victor Stello, W.

Executive Director for Operations cc: Office Directors Regional Administrators O

f f

e 1

o' ENCLOSURE 3 c

0FFICE OF SPECIAL: PROJECTS COMANCHE PEAK PROJECT DIVISION s

Chris Grimes, Director Phil McKee, Deputy Director Sherry Meacor, Secretary AD for. Projects AD for Technical Programs AD for Inspection Programs Hans Schier11ng

. Jim Lyons Dob Warnick Carol Morris, Sec.

Catherine Berney, Sec.

Wanda Warren, Clerk Linda Childers, Clerical Aide-Melinda Melloy'

'Erank Ashe Ian Barnes Annette Vietti-Cook George Gower f.ee Ellershaw

. Don Norkin C1tff Hale

. David Terao Dennis ~ Kelly Shannon Phillips q

Ward Smith Phil Wagner

)

June 1, 1987

._U

t ENCLOSURE 4 m egDo UNITED STATES NUCLEAR REGULATORY COMMISSION h

WASHINGTON. D. C. 20555 k*....,/

i 1

~

April 30,1987

^

14EPORANDUM FOR: Robert D. Martin, Regional Administrator Region IV FROM: '

James G. Keppler, Director Office of Special Projects

SUBJECT:

REQUEST FOR REGION IV ASSISTANCE AT COMANCHE PEAK j

The ED0's March 19, 1987 memorandum to me delegated to_the Office of Special Projects'the authcrity and responsibility for the conduct of inspection ac-tivities related to the licensing of the Comanche Peak facilities. The ED0's u

Narch 19, 1987 memorandum to you identified staff members to be assigned to the Office of Special Projects (OSP). The Region IV. staff members identified as being assigned to OSP were those individuals presently working at the site, plus. Joe Tapia, who is currently working in the Region IV office. During the past several weeks, we have taken a more detailed look at the staffing needed to support inspections and operator licensing at Comanche Peak. Phil McKee talked to several of your staff about this subject during his visit to the Regional Office and.the Comanche' Peak site in early April.

Based on our further evaluation, we project a need for support from Region IV in the following areas:

d Radiological Controls (Preoperational phase inspections) )

1.

Security and Safeguards (Preoperational phase inspections 2.

3.

Emergency Preparedness (Preoperational phase inspectiens and and coordination of exercises) i 4

OperatorLicensing(Administrationofinitialandrequalification operatorandsenioroperatorexams)

J For the first three areas listed above, we request that Region IV provide the l

inspection resources necessary to complete the routine preoperational phase inspections reqtiired by Inspection and Enforcement Manual Chapter 2513.

For the fourth area, we request that Region IV. continue to administer operator and senior operator licensing examinations to appropriate TU Electric Company personnel. As.an efficient approach to coordinating Region IV's support, I pro-pose that the' Assistant Director for CP Inspection Programs, OSP, work directly with the Regional Section Chiefs who are responsible for these areas. We under-stand that the Section Chiefs currently assigned to these areas are Blaine Murray (Radiological Controls), Lawrence Yandell (Emergency Preparedness and Security) and Ralph Cooley (Operator Licensing). Correspondence with TV Electric Company related to these activities would be issued through OSP. Any conflicts in this arrangement, such as with schedules or resources, could be worked out, as nec-essary, at higher levels of management.

l Robert D. Martin !

Although Joe Tapia was originally identified in.the OSP organization chart as part of the on-site team, it is our understanding that his loss to the Region could significantly affect required Regional inspections in the civil / structural area for other facilities. Accordirigly, we have redesignated this position as vacant and will fill it ir ::r. However, we may, on occasion, need to call upon Regional project and eng'...<ering inspection expertise. We will make these l

requests on a case-by-case basis.

We will continue to work with your staff to develop more definitive plans and schedules for the inspection support needed from Region IV.

If you have any questions or concerns regarding this matter, please contact me.

0 i

G a L &g n -

8 James G. Keppler. Director Office of Special Projects cc: C. Grimes P. McKee E. Johnson R. Bangart J. Taylor 1

1 l

)

6/ 4/87 PAGE 1

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT j

8702170315 Forwards request for addl info re BISCO electrical penetration seals & NAMCO switches. Response reauested by 870209 FROM: NOONAN,V.S.

Pwk Project Directorate 5 TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870203 AVAIL: POR 6po.

DOCUMENT TYPE: CLNTU FPAC: 8702170315 TASK:

0010: IEB-79-28 F0pMAL REPT NO:

]

DOCKET NO: 05000445 05000440 FICHE: 39672 026 39672 031 RIDS:

8702170638 Ack recelot of 661009,31 & 870122 Itrs informing NRC of i

stops taken to correct violations noted in Insp Repts 50-445/86-06 & 50-446/86-04 FROM JOHNSON,E.H.

Region 4,

Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870210 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8702170638 TASK ODID:

FORMAL REPT NO:

l DOCKET NO: 05000445 05000446 FICHE 39654 351 39654 355 RIDS: IE010 8702200135 58 Generic Ltc 87-02 to all holders of OLs not reviewed to current licensing criteria on seismic eualification of equipment re verification of seismic adeauncy of mechanical

& electrical eauipment in operating reactors,USI A-46 FROH DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (851125-TO:

Atlantic City Electric Co.

ISSUED: 870219 AVAIL: PDR 40po.

DOCUMENT TYPE: CLNTU FPAC: 8702200135 TASK: GL 87-02 0010:

FORMAL REPT NO:

l DOCKET NO: 05000000 0500044b 05000446 FICHE: 39889 001 39889 040 RIDS:

8702240431 Forwards Const Inso Repts 50-445/86-25 & 50-446/86-21 on B60901-30.No violation or deviation noted. Actions taken to correct previously identified insp findings examined.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Llectrie (formerly Texas Utilities Generating Co.)

ISSUED: 870217 AVAIL: p0R 3po.

DOCUMENT TYPE: CLNTO FPAC: 8702240431*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE 39721 183 39721 194 RIDS: IE01D

[

8702250295 Forwards request for addl info re Insp Repts 50-445/P5-07, 50-446/85-05,50-445/85-10,50-446/85-11,50-445/85-16, 50-446/85-13,50-445/86-06 & 50-446/86-04. Response by 870210 requested.

FROM: NOONAN,V.S.

PWR Project Directorate 5 TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

I ISSUED: 870205 AVAIL: PDR apo.

DOCUMENT TYPE: CLNTU FPAC: 8702250295 TASK:

ODID:

FORMAL REPT NO:

i DOCKET NO: 05000445 05000446 FICHE: 39743 163 39743 166 RIOS:

6/ 4/87 PAGE 2

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARIIAL RECORD FORMAT REPORT

,s 8702250302 Ack receipt of 870119 Itr informing NRC of steps taken to correct violations noteo in Insp Repts 50-c45/85-14 &

50-446/85-11 FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670239 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTO FPAC: 8702250302 TASK:

ODID:

FORMAL REPT NO:

DOCKET ND: 05000445 0500044o FICHE: 39727 299 39727 302 RIDS: IE01D 8702250320 Forwards request for addl info re Namco switches (IE Bulletin 79-28).Pecuests response by 870209 FROM: NOONAN,V.S.

PWR Project Directorate 5 TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilitles Generating Co.)

ISSUED: 670206 AVAIL: POR opp.

DOCUMENT TYPE: CLNTU FPAC: 8702250320 TASK:

ODID: IEB-79-28 FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE 39743 133 39743 136 RIDS:

8702250452 Ack receipt of 670116 Itr in response to NRC 861031 Itr &

notice of violation %n insp Repts 50-445/86-14 &

50-446/66-11.Aerees that stated condition not violation of facility procedure. Item B.5 withdrawn.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

'COUNSIL,W.G.

TU Electric (formerly Texas Utilitles Generating Co.)

ISSUED: 870219 AVAIL: pDR 2pp.

DOCUMENT TYPE: CLNTU FPAC: 8702250452 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 39728 131 39728 148 RIDS: IE01D 8703020410 Advises that BBC Brown Boveri,Inc agreed to continue 1

jockshaft testing described in enci GA Program Inso Rept 09900835/86-01 NRC will review results of testing to determine generic applicapility of problem.W/o enc 1, FROM: MERSCH0FF,E.W.

Vendor Program Branch TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilit%es Generating Co.)

ISSUED: 870225 AVAIL: CF 1p.

DOCUMENT TYPE: CLNTU FPAC: 8703020410 TASK:

0010:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 68770 360 68770 360 RIDS:

5703040324 Forwards request for addl info on Ofe of Inspector & Auditor Rept 86-10 re piping spool Piece. Size & location of spool pioce within chemical volume control sys requested.

1 1

FROM: N00 NAN,V.S.

PHR Project Directorate 5 TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870218 AVAIL: POR app.

DOCUMENT TYPE: CLNTU FPAC: 8703040324 TASK:

ODID:

FORMAL REPT NO DOCKET NO: 05000445 0500044o FICHE: 39870 326 39870 329 RIDS:

l 1

l

6/ c/87 PAGE 3

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 4

I i

8703050062 58 Generic Ltc 87-04 to all power reactor licensees re temporary exemotion from provisions of FBI criminal history rule for temporary workers.svc list ene).

FROM DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (851125-TO:

Atlantic City Electric Co.

ISSUED: 870306 AVAIL: PDR 4390 DOCUMENT TYPE: CLNTU FPAC: 8703050062 TASK: GL 87-04 ODID:

FORMAL REPT NO:

DOCKET NO: 05000000 05000445 05000446 FICHE 40001 228 40001 269 RIDS:

8703060181 Offers no comments on 860811 & 1017 submittals of Rev 0 to Issue Specific Action Plan III.a.5, "Preoperational Test...

Results" & Rev 1 to VII.a.9, " Adequacy of Purchased Safety-Related Matl & Equipment,* respectively.

FROM: NOONAN,V.S.

Pnd Project Directorate 5 TO:

COUNSIL,N.G.

TJ Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870224 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8703060181 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE 39906 166 39906 168 RIDS:

8703060307 58 Generic Ltc B7-03 to all licensees, applicants & holders of OL not required to be reviewec for seismic adecuacy of oquipment under provisions of USI A-46, " Seismic Gustification of Eeuipment in Operating...." Svc list encl.

FROM: DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (851125-TO:

Atlantic City Electric Co.

ISSUED: 870227 AVAIL: POR 2 cop.

DOCUMENT TYPE: CLNTU FPAC: 8703060307 TASK: GL 87-03 ODID:

FORMAL REPT NO:

DOCKET No: 05000000 0500044b 05000446 FICHE: 40074 212 40074 235 RIDS:

8703130202 Forwards IE Invest 3sation Reets 50-445/78-06 & 50-446/76-06 on 780321 re allegation of possible fraudulent actions.No noncompliance identifiec.

FROM: SEIDLE,h.C.

Region 4, Dallas, Office of the Director TO:

GARY,R.J.

Tu Electric (formerly Texas Utilities Generating Co.)

ISSUED: 780406 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTU FPACt 8703130179A TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 40007 067 40007 068 RIDS:

l 8703160202 58 Generic Ltc B7-06 to all holders of OLs re periodic verification of leak tight integrity of pressure isolation valves.Svc list enc 1 FROM: DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (851125-TO:

Atlantic Clty Electr%c Co.

ISSUED: 870313 AVAIL: POR 45pp.

DOCUMENT TYPE: CLNTU FPAC: 8703160202 TASK GL 87-06 ODID:

FORMAL REPT NO:

DOCKET NO: 05000000 0500044b 05000446 FICHE: 40166 003 40166 047 RIDS:

l 6/ 8/87 PAGF a

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8703180141 Ack recelot of 661013,1104 & 870109 Itrs informing NRC of otops taken to correct violations noted in Inso Repts 50-c45/86-01 & 50-446/86-01.

FRnM

.10 H N S O N, E. H.

Region 4, Office of Director TO:

CUUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670306 AVAIL: POR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8703180141 TASK ODID:

FORMAL REPT NO:

j DOCKET ND: 05000445 0500044b FICHE: 40063 066 40063 074 RIDS: IE010 8703180201 Forwards Inso Rept 50-445/86-24 on 860801-1031.No violations or deviations noted.

1 FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilitles Generating Co.)

ISSUED: e70303 AVAIL: PDR 3pp.

DOCUMENT TYPE: CLNTU FPAC: A703180201*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40066 128 40066 136 RIDS: IE01D 8703190287 58 Generic L tr 87-07 to all facility licensees re info transmittal of final rulemaking for revs to operator ee licensing - 10CFR55 & conforming amends. Draft final rules 10CFR50 & 55 & svc list enc 1.

FROM: DENTON,b.R.

Office of Nuclear Reactor Regulation, Director (851125-TO:

Atlantic City Electric Co.

ISSUED: 870319 AVAIL: PDR 125pp.

DOCUMENT TYPE: CLNTU FPAC: 8703290287 TASK GL B7-07 ODID:

FORMAL REPT NO:

DOCKET NO: 05000000 05000445 05000446 FICHE: 40235 157 40235 281 RIDS:

8703230060 Forwards Insp Rept 50-455/87-05 on 870209-11.No violations or deviations noted.

FPOM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TO Liectric (formerly Texas Utilitles Generating Co.)

ISSUED: 870317 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8703230060.

TASK ODID:

AORMAL REPT NO:

DOCKET NO: 05000445 07002932 F2CHE _.c0130._123 40134 126 RIOS: IE04D B703230299 Notifies of 870414 joint public meeting w/ Regions IV & V nuclear facilities in Denver,CO re final revs to 10CFR55 re operator licenses. Suggests attendance.by three or four staff members. Meeting agenda encl for planning purposes.W/o enc 1.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870319 AVAIL: pDR 1p.

DOCUMENT TYPE: CLNTU FPAC: 8703230299 TASK ODID:

FORMAL REPT NO:

DOCKET ND: 05000445 0500044b FICHE: 40147 163 40147 163 RIDS: IE31D 2

1 I

l 6/ 4/87 PAGE 5

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT l

6703260485 Requests replacement of ref to Note 8 for masonry walls in Toble 17A-1 of plant FSAR & replacement of safety-related ncsonry well supports deleted from table per Amend 59 RoAvirements of Reg Guide 1.33,Rev 2 must be met.

FROM: GRIMES,C.I.

Office of Special Projects TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilit%es Generating Co.)

ISSUED: 970311 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: A703260485 TASK:

ODID:

FORMAL REPT NO:

DOCKET ND: 05000445 0500044o FICHE: 40239 025 40239 027 RIDS:

8703300308 Forwards Inse Repts 50-445/86-22 & 50-446/86-20 on 860701-0831 & notices of violation & deviation.

FROM: JOHNSON,E.H.

Region 4,

Office of Director To:

COUNSIL,W.G.

TV Electric (formerly Texas Utilit%es Generating Co.)

ISSUED: 870318 AVAIL: PDR 3er.

DOCUMENT TYPE: CLNTU FPAC: 8703300308*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40265 017 40265 074 RIDS: IE01D 8703300393 Forwards safety evaluation re util 850607,1118 & 861216 Itrs re status of protective coating sys & surveillance programs for protective coating maint.Suomittels meet requirements of SSER 9 & acceptable.Open Issue 34 closed.

FROM: GRIMES,C.I.

Office of Special Projects TO:

COUNSIL,W.G.

TU Llectric (formerly Texas Utilities Generating Co.)

ISSUED: B70324 AVAIL: PDR 7pp.

DOCUMENT TYPE: CLNTU FPAC: 8703300393 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40281 295 40281 301 RIDS:

8703300467 Forwards request for adc1 info re 860613 Itr concerning NUREG-0737, Item II.D.1, " Performance Testing of Relief &

Safety Valves." Response by 870324 requested.

FROM: GRIMES,C.I.

Office of Special Projects TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilit%es Generating Co.)

ISSUED: 870324 AVAIL: PDR 5pp.

DOCUMENT TYPE: CLNTU FPAC: 8703300467 TASK: TM 2.0.1 ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40269 168 40269 172 RIDS:

8703310324 Discusses Comanche Peak Technical Review Team Overview Quolity Team mentioned in SSER 13,Section 4 of GA program.

Argas needing improvements,Per regional insps,11sted.

FROM: NOONAN,V.S.

PWR Project Directorate 5 TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 860529 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8703310228A TASK 0010:

FORMAL REPT NO:

DOCKET ND: 05000445 0500044o FICHE: 40284 334 40284 335 RIDS:

6/ 4/87 PAGE 6

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REo0RT B703310324 01 Discusses Comanche Peak Technical Review Team Overview Quclity Team mentioned in SSEk 13,Section 4 of QA orogram.

Arcas needing improvements,per regional insps,11sted.

FROM: NOONAN,V.S.

PWR Project Directorate 5 TD COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 960529 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC 8703310228A-TASK -

0010:

FORMAL REPT NO:

DOCKET ND: 05000445 FICHE: 40284 334 40284 335 RIOS:

B704010001 Ack recelot of 870112 & 0312 Itrs in response to NRC 861017 Itr ce violations noted in Inso Repts 50-445/86-03 &

50-446/86-02.Addl info requested re notice of violation, Items D.1 & E & notice of. deviation, Item D.1.

FROM JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 970325 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704010001 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40318 019 40318 060 RIDSt IE01D 8704020124 Forwards Const Inso Repts 50-445/86-08 & 50-446/86-06 on 860401-0531 & notices of violation & deviation. Actions to correct overall GA audit function not completely successful.

FROM JOHNSON,E.H.

Region 4,

Office of Director Texas Utilit'es Generating Co.)

TO:

COUNSIL,W.G.

TV Electric (formerly i

ISSUED: 870330 AVAIL: POR 3po.

DOCUMENT TYPE: CLNTU FPAC 8704020124*

TASkt ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40347 122 40347 143 RIDS: IE01D 8704020218 Forwards Const Insp Repts 50-445/86-20 & 50-446/86-17 on 860701-0831 & notice of violation. Status of response to provious insp findings discussed in Paragraph 4 FROM JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670330 AVAIL: PDR 3pp.

DOCUMENT TYPE: CLNTU FPAC 8704020218*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40346 059 40346 089 RIDS: IE01D 6704020508 Forwards summary of confirmations needed to closcout j

Generic Ltc 83-28, Item 2.2.1, "Eauipment Classification l

(Program for All Safety-Related Components)." Written I

confirmation for items listed requested, l

FROM: GRIMES,C.I.

Office of Special Proj ects f

TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

i ISSUED: 870325 AVAIL: PDR Spp.

DOCUMENT TYPE: CLNTU FPAC: 8704020508 TASK:

ODID: GL-83-28 FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40343 217 40343 221 RIDS:

I

l 6/ 8/A7 PAGE 7

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT l

8704030058 Summary of 870310 meeting w/util re briefing Region IV security staff on organizational link between facility oscurity & util corporate staff.

1 FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

C O 'J N S I L, W. G.

TV Llectric (formerly Texas Utilities Generating Co.)

ISSUED: 870331 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8704030058 TASK ODID:

FORMAL REPT NO:

i DOCKET 40: 05000445 05000446 FICHE: 40379 016 40379 017 RIDS: IE450 8704070308 Forwards Inso Repts 50-445/86-28 &

50-446/86-23 on 661001-1130.No violations noted.

FROM: JOHNSON,E.H.

Region 4, Uffice of Director TO:

COUNSIL,b.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670402 AVAIL: POR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704070308 TASA:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40428 153 40428 165 RIDS: IE01D B704070369 Forwards Insp Repts 50-445/86-32 & 50-446/86-26 on

'O 861201-31.No violations noted.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870402 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTO FPAC: 8704070369*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40430 282 40430 298 RIDS: IE01D 8704130545 Ack recelot of 870220 Itr provicing clarification of 860905 response re documentation of ref meetings, discussions &

training. Criteria ref in 870220 Itr will be considered during future insps to verify corrective actions.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670408 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8704130545 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000045 0500044o FICHE 40501 304 40501 307 RIDS: IE01D B704130654 Ack recelot of 670327 supplemental response to violations noted in Insp Repts 50-445/86-14 & 50-446/86-11, revising commitment date for completion of personnel retraining.

Revised date will be utilized during future insp.

FROM JOHNSON,E.H.

Region 4,

Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670408 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8704130654 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40507 266 40507 268 RIDS: IE01D

i G/ 4/67 PAGE 8

j U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT

.s 5

)

6704130062 Ack receipt of 670202 & 06 Itrs informing NRC of steps taken to correct violations noted in Insp Repts 50-445/86-15 &

50-co6/86-12.Addl info re listed items in notices of 3

violation & deviation requested within 20 days of Itr date.

j FRON: JOHNSON,E.H.

Region 4, Office of Director 1

TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilitles Generating Co.)

ISSUED: 870408 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704130662 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40509 001 40509 028 RIDS: IE01D ]

8704130737 Forwards Insp Repts 50-445/86-26 & 50-446/86-22 on 860901-1031 & notices of violation & deviation. Evaluation of unresolved item in Paragraph 3.d of rest & response GescriDing circunstances 6 actions taken.on item requested.

.FROM: JOHNSON,E.H.

Region 4,

Office of Director j

TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870402 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: A704130737*

TASK:

0010:

FORMAL REPT NO:

J DOCKET NO: 05000445 05000446 FICHE: 40498 050 40498 101 RIDS: IE01D 8704220243 Forwards Region IV physical security inspectors response to util questions re miscellaneous amends to 10CFR73.55 generic issues,per 661028 meeting.

FROM: JOHNSON,E.H.

Region 4, Office of Director TDs COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870406 AVAIL: PDR Spo.

DOCUMENT TYPE: CLNTU FPAC: 8704220243 TASK:

ODID:

FORMAL REPT NO:

J DOCKET NO: 05000445 0500044o FICHE: 40620 149 40620 153 RIDS: IE45D

~

8704270351 Ack receipt of 660402,870128,0220 & 0327 Itrs informing NRC of steps taken to correct violations noted in Insp Repts 50-445/85-07 & 50-446/85-05.

FROM: JOHNSON,E.H.

Region 4, Office of Director TDs COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: B70422 AVAIL: PDR 12po.

DOCUMENT TYPE: CLNTU FPAC: 8704270351 TASK ODID:

FORMAL REPT ND:

DOCKET ND: 05000445 05000446 FICHE: 40689 030 40689 041 RIDS: IE01D 8705040134 Informs that reactor operator & senior reactor operator licensing exams will De aaministered during wk of 670713 Ref matls listed in Enci i requested by 870515. Requirements for txam administration also enc 1 FROMJ GAGLIARDO,J.E.

Region 4, Office of Director TDs COUNSIL,H.G.

TU Electric (formerly Texas Utilities Generating Co.)

1 ISSUED: 870430 AVAIL: PDR 6pp.

DOCUMENT TYPE: CLNTU FPAC: 8705000134 TASK 0010:

FORMAL REPT NO:

DOCKET NO 05000445 FICHE: 40767 011 40787 016 RIDS: IE42C

)

6/ 4/87 PAGE 9

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8705080009 Forwards Doerations Inso Rept 50-445/86-30 on 861101-870228 No violations or deviations noted.Act3ons taken re previously identified insp findings examined.

FROMt JOHNSON,E.H.

Region 4, Office of Director T02 COUNSIL,W.G.

TU Electrie (formerly Texas Utilities Generating Co.)

ISSUED: 870430 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPACs,8705080009*

TASKt 0010 FORMAL REPT NO:

DOCKET NO3 05000445 FICHE: 40862 220 40862 226 RIDS: IE01D 8705110372 58 Generic Ltc 67-08 to all power reactor licensees re implementation of 10CFR73.SS miscellaneous amends & search requirements.Svc list encl.

FROM: MIoAGLIA,F.J.

Associate Director for Projects (Post 870411)

TO Atlantic City Electrle Co.

ISSUED 1 870511 AVAIL: PDR Sipo.

DOCUMENT TYPEt CLNTU FPAC: 8705110372 TASKt GL 67-08 ODID:

FORMAL REPT NO:

DOCKET NO 05000000 05000445 05000446 FICHE 41017 311 41018 002 RIDS:

8705180186 Reauests listed addl info re Comanche Peak response team program olen te develop more comprehensive plan identifying all activities required to supoort licensing,per 870407 met mooting & util commitment to submit Rev 4,

FROMt GRIMES,C.I.

Office of Special Projects T03 COUNS1L,h.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870512 AVAIL: CF 5po.

DOCUMENT TYPE: CLNTU FPAC: 8705180186 TASkt ODID:

FORMAL REPT NO:

DOCKET hD; 05000445 05000446 FICHEt 68875 333 68875 337 RIDS l

l i

l

l G/ 4/87 PAGE 1

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8702170315 Forwards request for addl info re BISCO electrical penetration see)s & NAMCO switches. Response requested by 870209 FROM NOONAN,V.S.

PWH Project Directorate 5 TO:

'COUNSIL,h.G.

TJ ticetric (formerly Texas Utilities Generating Co.)

ISSUED: 970203 AVAIL: POR 600 DOCUMENT TYPE: CLNTU FPAC: 8702170315 TASK:

ODID: IEB-79-28 FORMAL REPT NU 00thET NO: 05000445 05000440 FICHE: 39672 026 39672 031 RIDS:

8702170638 Ack receipt of 661009,31 & 870122 Itrs informing NRC of steps taken to correct violations noted in Inso Repts 50-445/66-Ob & 50-446/86-04 FROM: J0MNSON,E.H.

Region 4,

Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: e70210 AVAIL: POR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8702170638 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044e FICHE: 39654 351 39654 355 RIDS: IE010 8702200135 58 Generic Ltr 87-02 to all holders of OLs not reviewed to current licensing erlteria on seismic oualification of aquipment ce verification of seismic adeauncy of mechanical J

& olectrical equipment in operating reactors,USI A-46.

FRON: DENT 0a,H.R.

Office of Nuclear Reactor Regulation, Director (851125-TOs Atlantic City Electric Co.

ISSUED: 870219 AVAIL: POR 400p.

DOCUMENT TYPE: CLNTU FPAC: 8702200135 TASK GL 87-02 ODID:

FORMAL REPT NO:

DOCKET No: 05000000 0500044b 05000446 FICHE: 39889 001 39889 040 RIUS:

8702240431 Forwards Const Inso Repts 50-445/86-25 & 50-446/86-21 on i

860901-30.No violation or deviation noted. Actions taken to coerect previously identified inso findings examined.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

CouNSIL,h.G.

TV Electrie (formerly Texas Utilities Generating Co.)

ISSUED: 670217 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8702240431*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 39721 183 39721 194 RIDS: IE01D 8702250295 Forwards request for addl info re Insp Repts 50-445/85-07, 50-446/85-05,50-445/85-14,50-446/85-31,50-445/85-16, 50-446/85-13,50-445/86-06 & 50-446/86-04. Response by 870210 requested, j

FROM NOONAN,V.S.

PWR Project Directorate 5 TO COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.1 ISSUED: 870205 AVAIL: PDR apo.

DOCUMENT TYPE: CLNTU FPAC: 8702250295 1

TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 39743 163 39743 166 RIDS:

i U

6/ 4/87 PAGE 2

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT i

8702250302 Ack receipt of 570119 Itr informing NRC of steps taken to correct. violations noted in Insp Repts 50-445/85-14 &

50-446/85-11 FROM! JOHNSON,E.H.

Region 4,

Office of Director TO:

COUNSIL,W.G.

TV Llectric (formerly Texas Utilities Generating Co.)

ISSUED: 870219 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8702250302 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 30727 299 39727 302 RIDS: IE010 8702250320 Forwards request for addl info re Namco switches (IE Bulletin 79-28).Recuests response by 870209 FROM: NOONAN,V.S.

PWR Proj ect Directorate 5 TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670200 AVAIL: PDR 4po.

DOCUMENT TYPE: CLNTU FPAC: 8702250320 TASK ODID: IEB-79-28 FORMAL REPT NO:

DOCKET NO: 05000445 0500040o FICHE 39743 133 39743 136 RIDS:

8702250452 Ack rece'ipt of 670116 Itr in response to NRC 861031 Itr &

notice of violation in Insp Repts 50-445/86-14 &

50-446/66-11.Aorees that stated condition not violation of ferility procedure. Item B.5 withdrewn.

FROM JOHNSON,E.H.

Region 4, Office of Director T08 COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870219 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8702250452 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 39728 131 39728 148 RIDS: IE01D 8703020410 Aavises that dBC brown Boveri,Inc agreed to continue Jackshaft testing described in enc) OA Program Insp Rept 99900835/86-01.NRC will review results of testing to determine generic applicaoility of problem.W/o enc 1 FROM: MERSCH0FF,E.W.

Vendor Program Branch TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870225 AVAIL: CF 19.

DOCUMENT TYPE: CLNTU FPAC: 8703020410 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 68770 360 68770 360 RIDS:

8703040324 Forwards request for addl info on Ofe of Inspector & Auditor Rept 86-10 re piping soool Piece. Size & location of spool j

piece within chemical volume control sys requested.

FROM: NOONAN,V.S.

PWR Proj ect Directorate 5 T08 COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870218 AVAIL 'POR 4po.

DOCUMENT TYPE: CLNTU FPAC: 8703040324 I

TASK:

DDID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 39870 326 39870 3R9 RIDS:

I

6/ 4/87 PAGE 3

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8703050062 58 Generic Ltc 87-04 to all oower reactor licensees re tomperary exemption from provisions of FBI criminal history rule for temporary workers.Svc list enc 1 FROM: DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (851125 T0:

Atlantic City Electric Co.

ISSUED: 870306 AVAIL: POR 43po.

DOCUMENT TYPE: CLNTU FPACs.8703050062 TASK: GL 67-04 ODID:

FORMAL REPT NO:

DOCKET NO: 05000000 05000445 05000446 FICHE: 40001 228 40001 269 RIDS:

6703060181 Offers no comments on 860811 & 1017 submittels of Rev 0 to Issue Specific Action Plan III.e 5, "Preoperational Test...

Results" & Hev 1 to VII.e.9, " Adequacy of Purchased Safety-Related Matl & Equipment," respectively.

F R OF.: NOONAN,V.S.

PrM Proj ect Directorate 5 TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870224 AVAIL: POR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8703060181 TASK ODID:

FORMAL REPT NO:

l DOCKET NO: 05000445 05000446 FICHE: 39906 166 39906 168 RIDS:

8703060307 58 Generic Ltr 87-03 to all licensees, applicants & holders of OL not required to be reviewee for seismic adequacy of Gouipment under provisions of USI A-46, " Seism'c i

Ovolification of Eauipment in Operating...." Svc list encl.

FROM: DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (851125-TO:

Atlantic City Electric Co.

ISSUED: 870227 AVAIL: PDR 24pp.

DOCUMENT TYPE: CLNTU FPAC: 8703060307 TASK GL 87-03 ODID:

FORMAL REPT NO:

DOCKET f,0 05000000 05000445 05000446 FICHE: 40074 212 40074 235 RIOS:

8703130202 Forwards IE Investigation Repts 50-445/78-06 & 50-446/78-06 on 780321 re allegation of possible fraudulent actions.No noncompliance identified.

FROM: SEIDLE,h.C.

Region 4, Dallas, Office of the Director TO:

GARY,R.J.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 780406 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTV FPact 8703130179A TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40007 067 40007 068 RIDS:

8703160202 58 Generic Ltc 87-06 to all holders of OLs ce periodic verification of leak tight integrity of pressure isolation valves.Svc list encl.

FROM: DENTON,H.R.

Office of Nuclear Reactor Regulation, Director (351125-TO:

Atlantic City Electric Co.

ISSUED: 870313 AVAIL: PDR 45pp.

DOCUMENT TYPE: CLNTU FPAC: 8703160202 TASK: GL B7-06 0010 FORMAL REPT NO:

DOCKET NO: 05000000 05000445 05000446 FICHE: 40166 003 40166 047 RIDS:

1 l

6/ 4/87 PAGE 4

U.

b. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8703160141 Acb receipt of 661013,1104 & 870109 Itrs informing NRC of Oteps taken to correct violations noted in Insn Repts 50-445/86-01 & 50-446/86-01.

FROM: JOHNSON,E.H.

Region 4,

Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670306 AVAIL: POR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8703180141 TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40063 066 40063 074 RIDS: IE010 8703190287 58 Generic Ltr 87-07 to all facility licensees ce info transmittal of final rulemaking for revs to operator licensing - 10CFR55 & conforming amends. Draft final rules 10CFR50 & 55 & svc list enc 1.

FROM: DENTON,H.R.

Office of Nuclear Rsactor Regulation, Director (851125-TO:

Atlantic City Flectrle Co.

ISSUED: 870319 AVAIL: PDR 125pp.

DOCUMENT TYPE: CLNTU FPAC: 8703290287 TASK GL 87-07 ODID:

FORMAL REPT NO:

DOCKET NO: 05000000 05000445 05000446 FICHE: 40235 157 40235 281 RIDS:

8703230209 Notifies of 870414 joint public meeting w/ Regions IV & V nuclear facilities in Denver,CO re final revs to 10CFR55 re

,a coerator licenses. Suggests attendance by three or four staff mombers.Meetinn agenda enc 1 for olanning purposes.W/o ene).

FROM: JOHNSON,E.H.

Region 4,

Office of Director i

TO:

COUNSll,W.G.

TV Liectric (formerly Texas Utilities Generating Co.)

ISSUED: 670319 AVAIL: POR 1p.

DOCUMENT TYPE: CLNTU FPAC: 8703230299 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000400 FICHE: 40147 163 40147 163 RIDS: IE31D j

8703260485 Reauests replacement of ref to Note B for masonry walls in Tchle 17A-1 of plant FSAR & replacement of safety-related masonry wall suoport's deleted from table per Amend 59 PeRuirements of pe9 Guice 1.33,Rev 2 must be met.

FROM: GRIMES,C.I.

Office of Special Projects TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilitles Generating Co.)

ISSUED: 870311 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8703260485 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40239 025 40239 027 RIDS:

0703300306 Forwards Inso Repts 50-445/86-22 & 50-446/86-20 on 860701-0831 & notices of violation & deviation.

FROM JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Liectrie (formerly Texas Utilities Generating Co.)

ISSUED: 670318 AVAIL: POR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8703300308*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40265 017 40265 074 RIDS: IE01D

6/ 8/87 PAGE 5

U.

S7 NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT PEPORT-8703300393-Forwards safety evaluation re util 850607,1118 & 861216 Itra re status of protective contino sys & surveillance programs Lfor protective coating'maint.Submittals meet requirements of BSER 9 &. acceptable.Open Issue 34 closed.

FROM: GRIMES,C.I.

Office of Special Projects TO:

COUNSIL,W.G.

TO Electrie (formerly Texas Utilities Generating Co.)

ISSUED: 870324 AVAIL: pDR 7po.

DOCUMENT TYPE: CLNTU FPAC: 8703300393 TASK -

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044e FICHE '40281 295 40281'301 RIDS:

8703300467

. Forwards request-for adol info re 860613 Itr concerning NUREG-0737, Item II.D.1, " Performance Testing of Relief b Sofety Valves." Response Dy 870324 requested.

FROM: GRIMES,C.I.

Office of Special Proj ec t s TO -

'C00NSIL,W.G.

Tu Electric (formerly Texas Utilities Generating Co.)

I ISSUED: 870324 AVAIL: PDR 5po.

DOCUMENT TYPE: CLNTU FPAC: 8703300467.

TASAs-TM 2.D 1 ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40269 168 40269 172 RIDS:

8703310324 Discusses Comanche Peak Technical Peview Team Overview

~ Quality. Team mentioned in SSER 13,Section 4 of.0A program.

Areas needing. improvements,per regional insps,Iisted.

FROM: NOONAN,V,S.

PWH Project Directorate'5 TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilitles Generating Co.)

ISSUED: 960529 AVAIL: POR 2po.

DOCUMENT TYPE: CLNTU' FPAC: 8703310226A TASA:

ODID:

FORMAL REPT NO:

DOCKET No: 05000445 0500044e FICHE: 40284 334 40284 335 RIDS:

j I

8704010001 Ack receipt of 870112 & 0312 Itra in response to NRC 861017 j

lte ce violations noted in Inso Pepts 50-445/86-03 &

50-446/86-02.Adel info requested re notice of violation, Items D.1 &ER notice of deviation, Item D.1.

)

FROM: JOHNSON,E.H.

Region 4, Office of Director

]

TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Cc.)

ISSUED: 870325 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704010001 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40318 019 40318 060 RIDS: IE01D

.8704020124 Forwords Const Inso Repts 50-445/86-08 & 50-446/86-06 on 860401-0531 & notices of violation & deviation. Actions to correct overall QA audit function not completely successful.

FROM? JOHNSON,E.H.

Region 4, Office of Director T02' COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

. ISSUED: 870330 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAct 8704020124*

TASK ODID:

FORMAL REPT NO:

DOCKET AO: 05000445 05000446 FICHE: 40347 122 40347 143 RIDS: IE01D 1

0/ 4/87 PAGE 6

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT

/

8704020218 Forwards Const Inso Repts 50-445/86-20 & 50-446/86-17 on i

860701-0831 % notice of violation. Status of response to previous insp findings discussed in Paragraph 4

\\

FROM: JOHNSON,E.H.

Region 4,

Office of Director I

TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

3SSUED: 870330 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704020218*

TASK ODID:

FORMAL REPT NO:

DOCKET ND: 05000445 05000446 FICHE: 40346 059 40346 089 RIDS: IE01D 8704020508 Forwards summary of confirmations needed to closecut Goneric Ltr 83-28, Item 2.2.1, "Ecuipment Cloesification (Program for All Safety-Deleted Components)." Written confirmation for items listed requssted.

FROM GRIMES,C.I.

Office of Special Projects TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870325 AVAIL: PUR 5pp.

DOCUMENT TYPE: CLNTU FPAC: 8704020508 TASK 0010: GL-83-28 FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40343 217 40343 221 RIDS:

8704030058 Summary of 670310 meeting w/util re briefing Region IV security staff on orcanizational link between facility security & util corporate staff.

FROM: JOHNSON,E.H.

Renton 4, Office of Director TO:

COUNS!L,W.G.

TV Electric (formerly Texas Utilitles Generating Co.)

ISSUED: 870331 AVAIL: POR~

2pp.

DOCUMENT TYPE: CLNTU FPAC: 8704030058 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE 40379 016 40379 017 RIDS: IE45D 8704070308 Forwards Inse Repts 50-445/66-28 &

50-446/86-23 on 661001-1130.No violations noted.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilit'ies Generating Co.)

ISSUED: 870402 AVAIL: POR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704070308e TASK ODID:

FORMAL REPT NO:

DDCKET NO: 05000445 05000446 FICHE: 40428 153 40428 165 RIDS: IE01D 8704070369 Forwards Inse Repts 50-445/86-32 & 50-446/86-26 on 661201-31.No violations noted.

FROM JOHNSON,E.H.

Region 4,

Office of Director TO:

COUNSIL,W.G.

TV Electric (formerly Texas Utilities Generating Co.)

ISSUED: e70402 AVAIL: pDR 3po.

DOCUMENT TYPE: CLNTU FPAC: 8704070369*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40430 282 40430 296 RIDS: IE01D

6/ 4/87 PAGE 7

l U.

S.

NUCLEAR REGULATORY COMMISSION

)

1 DCS PARTIAL RECORD FORMAT REPORT 8704130545 Ack receipt of 870220 Itr providing clarification of 860905 response re documentation of ref meetings, discussions &

training. Criteria ref in 870220 Itr will be considered during future insps to verify corrective actions.

FROM JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 670406 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTU FPACt 8704130545 TASK:

ODID:

FORMAL REPT NO:

1 DOCKET NO: 05000445 0500044o FICHE 40501 304 40501 307 RIDS: IE01D 8704130654 Ack receipt of 870327 supplemental response to violations noted in Insp Repts 50-445/66-14 & 50-446/86-11, revising commitment cate for completion of personnel retraining.

Revised date will be utilized during future insp.

FROM: JOHNSDN,0.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870408 AVAIL: POR 2po.

DOCUMENT TYPE: CLNTU FPAC: 8704130654 TASK:

ODID:

FORMAL REPT NO:

DOCKET h0 05000445 05000446 FICHE 40507 266 40507 268 RIDS: IE01D 8704130662 Ack recelot of 670202 & 06 Itrs informing NRC of steps te~

to correct violations noted in Inso Repts 50-445/86-15 &

50-446/86-12.Adct info re listed items in notices of violation & deviation reauested within 20 days of Itr date.

FROM: JOHNSDN,E.H.

Region 4, Office of Director To:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870408 AVAIL: PDR 3pp.

DOCUuENT TYPE: CLNTU FPAC: 8704130662 TASK:

ODID:

FORMAL REPT NO:

DOCKET HO 05000445 0500044o FICHE: 40509 001 40509 028 RIDS: IE01D 8704130737 Forwards Insp Repts 50-445/86-26 & 50-446/86-22 on 860901-1031 & notices of violation & deviation. Evaluation of unresolved item in Paragrapn 3.d of rept & response describing circumstances & actions taken on item requested.

FROM JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870402 AVAIL: PDR 3pp.

DOCUMENT TYPE: CLNTU FPAC: 8704130737*

TASK ODID:

FORMAL REPT ND:

DOCKET ND: 05000445 05000446 FICHE: 40498 050 40498 101 RIDS: IE01D 8704220243 Forwards Region IV physical security inspectors response to util questions re miscellaneous amends to 10CFR73.55 generic (osues,per 86102R meeting.

FROM JOHNSON,E.H.

Region 4, Office of Director TO:

COUNSIL,W.G.

TU Electric (formerly Texas Utilities Generating Co.)

ISSUED: 870406 AVAIL: POR 5pp.

DOCUMENT TYPE: CLNTU FPAC: 8704220243 TASK 0010:

FORMAL REpT NO:

DOCKET NO: 05000445 0500044b FICHE: 40620 149 40620 153 RIDS: IE45D

l i

l 1

l 6/ 8/87 PAGE 8

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8704270351 Ack receipt of 860402,870128,0220 L 0327 Itra informing NRC of steps taken to correct violations noted in Inso Repts 50-a45/85-07 & 50-446/85-05.

FROM: JOHNSON,E.H.

Region 4, Office of Director TO:

CUUNSIL,W.G.

TV Electric (formerly Texas Utilit%es Generating Co.)

ISSUED: e70422 AVAIL: POR 12po.

DOCUMENT TYPE: CLNTO FPAC: 8704270351 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500040o FICHE: 40689 030 40689 041 RIDS's IE010 8705110372 58 Generic Ltc 87-08 to all power reactor licensees re implementation of 10CFR73.55 miscellaneous amends & search rocuirements.Svc list encl.

FROM: MIpAGLIA,F.J.

Associate Director for Projects (Post 870411)

TO:

Atlantic City Electr%c Co.

ISSUED: 870511 AVAIL: POR Sion.

DOCUMENT TYPE: CLNTU FPAC: 8705110372 TASK GL 87-08 ODID:

FORMAL REPT NO:

DOCKET NO: 05000000 0500044b 05000446 FICHE: 41017 311 41018 002 RIDS:

8705180186 Recuests listed modi info re Comanche Peak response team program olen to develop more comprehensive plan identifying all activities required to support licensing,per 870407 mgt msoting & util commitment to suomit Rev 4 FROM: GRIMES,C.I.

Office of Special Projects TDs COUNSIL,W.G.

TV Electric (formerly Texas Utilit%es Generating Cc.)

ISCUED: 970512 AVAIL: CF 5po.

DOCUMENT TiPE: CLNTU FPAC: 8705180186 TASK ODID:

FORMAL REPT NO:

DOCKET iv0 05000445 0500044b FICHE 68875 333 68875 337 RIDS:

i

4 6/ 4/87 PAGE 1

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8702250425 Final response to FOIA requests for documents re Allegation 4-Be-A-019. Forwards Apps 6 6 C documents. App C documents fully & partially withheld (ref FOIA Exemptions 6 & 7).

Documents also available in PDR.

FROM GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413) i TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870220 AVAIL: POR app.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425*

TASK 0D10:

FORMAL REPT N0s DOCKET NO: 05000445 0500044b FICHE: 39744 079 39744 093 RIOS 8702250476 Responds to 860925 Itr ce referrals of allegations. Region IV has not referred allegations to util other than 860530 ref in ltr.A11eger did not reguest confidentiality & has idOntified CASE as contact.

FROM: MARTIN,R.D.

Region 4, Office of Director TO:

GARDE,B.P.

Government Accountabl11ty Project ISSUED: 861009 AVAIL: POR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 87022504250 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 39744 084 39744 084 RIDS:

8702250498

. Partially deleted memo discussing Allegation 4-86-A-019 re 30% overrollina of tubes resulting in busting of tube sheet, spider web cracking.of tuce sheet & false statenents concerning tube sheet alignment.

)

FROM: EMERSON,M.

NRC - No Detailed Affiliation Given TO:

ELLIS,J.

Citizens Association for Sound Energy l

ISSUED: B60523 AVAIL: POR 3pp.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425C TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 39744 085 39744 087 RIDS:

8703050164 Partial response to FOIA request for, documents re Insp conducted on 860825-29 of S&W QA program concerning design repualification of p% ping & pipe supports of facilities.

Forwards App A & B documents. Documents also in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 970303 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703050164 TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 39906 105 39906 120 RIDS:

8703090467 Final. response to FOIA request for documents re assessment of QA/QC at facility. App C & E documents encl. App B,C & E cocuments in PDR. App CE D documents partially & completely withheld,respectively (ref FOIA Exemptions 5 & 7).

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870304 AVAIL: PDR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

TASK 2 0010:

FORMAL REPT NO:

DOCKET-NO: 05000445 05000446 FICHE: 39925 250 39925 256 RIDS:

.1

  • L6/ 4'/87 PAGE 2

1 U.

S. NUCLEAR REGULATORY COMMISSION i

l DCS PARTIAL RECORD FORMAT REPORT B703090467 XA Final response to FOIA request for documents ce assessment of QA/QC at facility. App C documents encl. App 8,C 4 E documents in PDR. App C& D cocuments partially & completely withheld,respectively (ref FOIA Exemptions 5 & 7).

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

LTO:

GARDE,B.P.

Government Accountability Project ISSUED: 570304' AVAIL: PDR 6pp.

DOCUMENT TYPE: CLNTZ FPAC3 8703090467*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40374 342 40377 266' RIDS:

8703100294 partial response to FOIA request for documents re facility QA program. Forwards App C documents. Documents also available in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project i

ISSUED: 670306 AVAIL: POR 290 DOCUMENT TYPE: CLNTZ FPAC 8703100294*

i TASK ODID:

FORMAL'REPT NO:

i DOCKET NO: 05000445 0500044b FICHE: 39953 215 39953 220 RIDS:

8703120052 Resoonds to appeal re denial of FOIA request for documente ce evaluation of issue specific action plan. Documents I-2, I-6,I-7,I-8,I-9,1-9a,I-96,1-12a,J-3 & J-3b encl. Remaining Apps I 6 J documents withheld (ref FOIA Exemption 5).

FROM -STELLO,V.

Office of the Executive Director for Operations l

T03..

GARDE,B.P.

Government Accountability Project l

ISSUED: 870310 AVAIL: pDR 5pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703120052*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 39988 062 39988 118 RIDS:

i i

8703120411 Responds to appeal re denial of FOIA request for documents j

re evaluation of ISAPs concerning plant. Forwards Document #

listed in app. Documents 1 through 3 & enc 1 to 4' withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executive Director for Operations TI :

GARDE,R.P.

Government Accountability Project O

ISSUED: 870310 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703120411*

1 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO - 05000445 05000446 FICHE
40003 171 40003 173 RIDS:

3 8703180250

. Partial response to FOIA request for documents re facility

' overview quality rev%ew team L response team. Forwards App A documents. Documents also.available in PDR.

1 FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

To BAUMAN,L.

Government Accountability Project ISSUED: 870313' AVAIL: pDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703180250*

f TASK -

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40074 106 40074 147 RIDS:

]

s-6/f4/87 PAGE 3

-U.

S.

NUCLEAR REGULATORY COMMISSION DCS PAR 1IAL RECORD FORMAT REPORT 8703250531

. Final response to FOIA reouest for documents ce NRC ovaluation of plant lesser separation between Class 1E L.

non-Class 1E circuits. Forwards App A documents. App A&B documents also available in PDR.

FROM GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TOs.

BAUMAN,L.

Government Accountability Project ISSUED: 870319 AVAIL: PDR.

3pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703250531*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40239 335 40239 344 RIDS:

'8703310228 Partial response to FOIA request for documents re Comanche Peck response team. Forwards Apo B documents.Apo B&C

-documents aveitable in PDH.

FROM GRIMSLEY,0.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870325 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTZ FPAC: 8703310228*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40284 291 40284 336 RIDS:

8704070037 Final response to FOIA request for documents re Comanche

' Peak response team. Forwards App E documents. Documents also cvailable in PDR.

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Proj ec t ISSUED: 870402 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704070037*

TASK:

'0010:

FORMAL REPT NO:

DOCKET No: 05000445 05000446 FICHE: 40440 027 40440 033 RIDS:

8704070306 Partial response to FOIA request for documents re review of Aop E (Rev 2) to Comanche Peak response team program plan.

Apo D documents enel & availacle in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413) i TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870402 AVAIL: POR 2po.

DOCUMENT TYPE: CLNTZ FPAC: 8704070306*

TASK:

ODID:

FORMAL REPT NO:

' DOCKET NO: 05000445 0500044c FICHE: 40438 094 40436 098 RIDS:

8704080127 Partial response to FOIA request for documents re Ofe of Investigations Case A4-86-003. Forwards App A documents.

Documents also being made available in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870013)

T0:

BAUMAN,L.

Government Accountability Project ISSUED:. 870403 AVAIL: POP 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704080127*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044e FICHE: 40440 164 40400 168 RIDS:

~-

6/ 4/87 PAGE a

U.

S.

NUCLEAR REGULATORY COMMIS$10N DCS PARTIAL RECORD FORMAT REPORT 8704150399 Responds to appeal re denial of FOIA request for documents on T nesterman 860530 Itr to util re Allegation 4=86=A=019 Forwards portions of Documents 1,3 & 9 & Documents 2,4,6 &

l

7. info partially withheld (ref FOIA Exemot%ons 5 & 6).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 970413 AVAIL: DDR 2pp.

DOCUMENT TYPE: CLNTZ FPACs,8704150399*

TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE 40556 296 40556 310 RIDS:

8704150402 partially deleted Itr ce 85100? meeting between CASE & NRC.

-R3puests assistance to set uo meeting & identify any remaining issues.

1 FROM: MARTIN,R.D.

Region 4, Office of Director TO:

ELLIS,il.

Citizens Association for Sound Energy j

ISSUED: 851025 AVAIL: PUR 3pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704150399A TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE 40556 298 40556 300 RIDS:

8704280186 Further response to appeals ce cenial of FOIA request for documents. Forwards Documents A=11 8 A-77 re test questions.

onswers & scores & certification results of OA personnel.

Portions withheld (ref FOIA Exemption 6).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,8.P.

Government Accountability Proj ec t ISSUED: 870416 AVAIL: PDR 19.

DOCUMENT TYPE: CLNTZ FPAC: 8704280186*

TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 0500040o FICHE: 40715 261 00716 334 RIDS:

8705080296 Responds to appeal re denial of FOIA request for records concerning repts listed in Board Notification 84=149 Documents identified on enc 1 app & forwarded will continue 1

to be partially withheld (FUIA Exemptions 6 & 7).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,R.P.

Government Accountability Project j

ISSUED: 870505 AVAIL: PDP 200.

DOCUMENT TYPE: CLNTZ FPAC: 8705080296*

j TASK ODID:

FORMAL REPT NO:

1 DOCKET NO: 05000445 0500044o FICHE: 40878 009 40878 302 RIDS:

8705140159 Further response to appeal re denial of FOIA request for documents re Comanche Peak Task Force. Documents listed in 3

App H concern potential violations. Portions of 85 App H documents continue to be withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executlve Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870508 AVAIL: pDR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8705140159 TASK ODID:

FORMAL REPT NO:

DOCKET No: 05000445 05000446 FICHE: 40920 078 40920 098 RIDS:

i

)

1

' 6/ 4/87 PAGE' 5

.U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT j

8705150227 Further response to appeal of denial.of FOIA 85-59 re Comanche' Peak Task Force.pocuments T-34 & U-42 will continue-to be withheld (ref FOIA Ewemption 5). orig %nator of Document U-12 document contacted for further info re release.

FROM: STELLO,V.

Office of the Executive Director for Operations TO GA9DE,0.P.

Government Accountability Project ISSUED: 670508 AVAIL: pDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705150227

. TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40939 106 40939 107 RIDS:

8705180029 Final response to FOIA request for documents ce cost of operating license rev_iew for facility from 851203 to present. Forwards documents listed in App B. App A documents ovailable in PDR.

FROM:'GRIMSLEY,D.H.

Division of Rules & Records (Post 870413)

TO:

RUBINTON,D.S..

Government Accountability Project i

ISSUED: 870512 AVAIL: POR 3pp.

DOCUMENT TYPE: CLNTZ FPAC 8705180029*

TASK ODID:

FORMAL REPT.NO:

4 DOCKET Nns 05000445 05000446 FICHE: 40961 109 40961 251 RIDS:

J8705180040 Final response to FOIA request re Invest %gation Case

'A4-86-003.Enct App B & D documents also.in PDR. App D.

documents partially witnheld (ref FOIA Exemptions 6 & 7), App E documents completely withheld (ref FOIA Exemptions 6 & 7).

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Post 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870513 AVAIL: PDR lopp.

DOCUMENT TYPE: CLNTZ FPAC: 8705180040*

TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 40960 307 40960 340 RIDS:

i

4 i

%'~

j 6/ 4/87 PAGE 1

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8702250425' Final response to FOIA reavests for documents re Allegation 4-86-A-019. Forwards Apps D & C documents. App C documents fully.E partially withheld tref FOIA Exemptions 6 8 7).

Documents also available.in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870220 AVAIL: PDp 4pp.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE 39744 079 39744 093 RIDS:

l 8702250425-01 Final response to FO!A requests for documents re Allegation 4-86-A-019. Forwards Aops 6 h C documents. App C documents fully & partially withheld (ref Fo!A Exemptions 6 & 7).

Documents also available in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Govert. ment Accountability Project H

ISSUED: 670220 AVAIL: p0R 4pp.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425*

)

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39744 079 39744 093 HIDS:

870225n425 02 Final response to FOIA requests for documents re Allegation 4-86-A-019. Forwards Apps d & C documents. App C documents fully 8 partially withheld (ref FOIA Exemptions 6 & 7).

. Documents also available in PuR.

FROM GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN.L.

Government Accountability Project ISSUED: 670220 AVAIL: PDR 4pp.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39744 079 39744 093 HIDS:

8702250425 03 Final response to FOIA requests for documents re Allegation 4-66-A-019. Forwards Apps e 6 C documents. App C documents fully & partially withheld (ref FOIA Exemptions 6 & 7).

Documents also available in PDR.

FRUM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountabllity Project ISBUED: 970220 AVAIL: POR opp.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39744 079 39744 093 RIDS:

.8702250476 Responds to 860925 Itr re referrals of allegations. Region IV hcs not referred allegations to util other than 860530 ref in ltr.A11eger did not request confidentiality & has identified CASE as contact.

FROM: MARTIN,R.D.

Region 4,

Office of Director Tot GARDE,B.P.

Government Accountability Project ISSUED: S61009 AVAIL: PDR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8702250425B TASK ODID:

FORMAL REPT NO:

00CKET NO: 05000445 0500044o FICHE: 39744 084 39744 084 RIDS:

J

6/ a/67 PAGE 2

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8702250498 Partially deleted memo discussing Allegation 4-86-A-019 re 30% overrolling of tubes resulting in bust 4ne of tube sheet,-

cpider wec_ cracking of tuce sneet & false statements concerning tube sheet alignment.

FROM: EMERSON,M.

NRC = No Detailed Affiliation Given TO:

ELLIS,J.

Citizens Association for Sound Energy ISSUED: 660523 AVAIL: POR 3pp.

DOCUMENT TYPE: CLNTZ FPAC 8702250425C TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000440 FICHE: 39744 085 39744 087 RIDS:

8703050164 Partial response to FOIA request for.cocuments re insp conducted on 860825-29 of S&W OA program concerning design ropvalification of piping,& pipe supports of facilities.

1 Forwards App A & B documents. Documents also in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules t Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870303 AVAIL: PDR 20p.

DOCUMENT TYPE: CLNTZ FPAC: 8703050164 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 39906 105 39906 128 RIDS:

8703090467 Final response to FOIA request for documents re assessment of QA/QC at facility. App C & E documents encl. App B,C & E

{

documents in PDR. App C & O documents partially & completely withbeld,respectively (ref FOIA Exemptions 5 & 7).

FROM: ~ GRIMSLEY,D.H.

Division of Pules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870304 AVAIL: PDR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

TASK ODID:

FORMAL REPT ND:

DOCKET NO: 05000445 0500044e FICHE: 39925 250 39925 256 RIDS:

]

8703090467 01 Final response to FOIA request for documents re assessment of QA/QC at facility. App C6 E documents encl.Apr B,C & E documents in PDR. App C 6 D documents partially & completely

{

withheld,respectively (ref FOIA Exemptions 5 & 7).

]

FROM GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413) j Tot GARDE,B.P.

Government Accountability Project

' ISSUED: 970304 AVAIL: PDR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

d TASK:

ODID:

FORMAL REPT NO:

DOCKET ND: 05000445 FICHE: 39925 250 39925 256 RIDS:

8703090467 02 Final response to FOIA request for documents re assessment of DA/DC at facility. App C& E documents encl.Apo 9,C & E documents in PDR. App C & D documents partially & completely withheld,respectively (ref FOIA Exemptions 5 & 7).

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountao314ty Project ISSUED: 870304 AVAIL: PDR 600 DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39925 250 39925 256 RIDS:

i

. 6/ 4/87 PAGE 3

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8703090467 03 Final. response to FOIA request for documents ce assessment of GA/QC at facility. App C h E documents encl. App B,C & E documents in PDR. App C& D documents partially & comoletely withheld,respectively (ref FOIA Exemption 5 & 7).

j FROM GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountability Project ISSUED: 470304 AVAIL: POR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39925 250 39925 256 RIDS:

8703090467 04 Final response to FOIA request for documents re assessment of GA/DC at facility. App C h E docucents encl.Apo B,C & E documents in POR. App C & D documents partially & completely withhetc,respectively (ref FOIA Exemptions 5 & 7).

FROM GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountabllity Project ISSUED: 870304 AVAIL: pDR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

TASK ODID:

FORMAL REPT NU DOCKET NO: 05000c45 FICHE: 39925 250 39925 256 RIDS:

8703090467 05 Final response to FOIA request for documents ce assessmen+

of GA/QC at facility.Aop C h E documents encl. App B,C & E documents in PDR. App C5 D cocuments partially & completely withheld,respectively (ref FOIA Exemptions 5 & 7).

FROM GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,0 P.

Government Accountability Project ISSUED: 870304 AVAIL: PDR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 5703090467 TASK:

0D10:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39925 250 39925 250 RIDS:

8703090467 XA Final response to FOIA request for documents re assessment of QA/DC at facility.Aep C documents encl.Apo B,C & E documents in PDR. App C h D documents cartially & completely uithheld,respectively (ref F01A Exemptions 5 & 7).

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountability Project ISSUED: B70304 AVAIL: POR 6pp.

DOCUMENT TYPE: CLNT2 FPAC: 8703090467*

TASK:

ODID:

FORMAL REPT NO:

DOCKET ND: 05000445 05000440 FICHE: 40374 342 40377 266 RIDS:

8703090467 XB Final response to FOIA request for documents ce assessment of QA/QC at facility. App C documents enet. App B,C & E documents in PDR. App C & D documents partially & completely eithheld,respectively (ret FOIA Exemptions 5 & 7).

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 670413)

TO:

GARDE,B.P.

Government Accountability Project ISSUED: B70304 AVAIL: POR 6pp.

DOCUNENT TYPE: CLNTZ FPAC 8703090467*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40374 342 40377 266 R7D51

  • o/ JrA7 PAGE 4

U.

S. NUCLEAR REGULATORY CDHMISSION DCS PAMTIAL RECORD FORMAT REPORT p 8703090467 XC Final response to FO!A reauest for docum,.mts re assessment l'

of GA/QC at facility, App C documents encl. App B,C & E dccuments in POR. App C 3, D cocuments cartielly & completely withheld,respectively (ret FOIA Exemptions 5 & 7).

FROM: GPIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government. Accountability Project ISSUED: m70304 AVAIL: POR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 6703090467.

TASK ODID:

FORMAL REPT ND:

DOCKET NO: 05000c45 FICHE: 40374 342 40377 266 RIDS:

8703090467 XD Final response to FOIA request for documents re assessment of GA/0C et facility. App C documents encl.Apo B,C & E documents in PDR. App C 0 9 documents partially & completelv ettnheld,respectively (red FOIA Exemptions 5 & 7).

FROM GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TDs GARDE,0 P.

Government Accountability Project ISSUED: B70304 AVAIL: PD#

6pp.

DOCUMENT TYPE: CLNTZ FPAC: 6703090467e TASK ODID:

FORMAL REPT NO:

' DOCKET ND: 05000445 FICHE: 40374 342 40377 266 RIDS:

8703090467 XE Final response to FOIA request for documents re assessment of QA/DC at facility. App C cocuments encl. App B,C & E documents in PDR. App C s 0 accuments cartially & completely uithheld,respectively (ref FOIA Exemptions 5 & 7).

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,0.P.

Government Accountability Project 3SSUED: R70304 A/ AIL: POR 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

17ASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40374 342 40377 266 RIDS:

6703090467 XF Final response to FOIA request for documents re assessment of QA/DC at facility. App C cocuments encl. Ape B,C & E documents in PDR. App C 6 D documents partially & completely withheld,respectively (ref FOIA Fremptions 5 & 7).

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

{

TO:

GARDE,S.P.

Government Accountability Project

{

ISSUED: B70304 AVAIL: PDR 6po.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467e

]

TASK ODID:,

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40374 342 40377 266 RIDS:

8703090467 XG Final response to FOIA request for documents ce assessment

-of QA/DC at facility. App C documents enc 1. App B,C & E documents in PDR. App Cb D documents partially & completely withheld,respectively (ref F0la Exemptions 5 & 7).

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

GARDE,B.P.

Government Accountability Project ISSUED: 670304 AVAIL: p0R 6pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703090467*

TASK:

ODID:

FORMAL REPT NO:

DOCKET No: 05000445 FICHE: 40374 342 40377 266 RIDS:

6/ 4/67 PAGE 5'

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8703090467 XH Final response to'FOIA reauest for documents re assessment of QA/QC at facility. App C cocuments encl. App B,C 8 E documents in PDR. App C-6 0 documents. partially & completely withheld,respectively (ref'FnIA Exemptions 5 & 7).

FROM: GRIMSLEY,0.H.-

Division of Rules & Records (Pre 870413)

TO:

GARDE,0.P.

Government Accountability Project

' ISSUED: 870304' AVAIL: POR 6pp.

DOCUMENT TYPE: CLNTZ FPACs,8703090467*

. TASK ODID:.

FORMAL REPT NO:

DOCKET No: 05000445 FICHE: 40374 342 403T7 266 RIDS:

8703100294 Partial response to FOIA request for documents re facility CA program. Forwards Aep C documents. Documents also available in PDo.

FROM: GRIMSLEY,0.H.

bivisionofRules& Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870306 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703100294*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE 39953 215 39953 220 RIDS:

8703120052 Responds to aopeal re denial of F0IA request for documents re evaluation of issue specific action plan. Documents 1-2, 1-6,1-7,I-8,I-9,I-9a,I-96,I-12a,J-3 & J-30 encl. Remaining Apps I.h J documents withheld (ref FOIA Exemotion 5).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870310 AVAIL: PDR 5po.

DOCUMENT TYPE: CLNTZ FPAC: 8703120052*

TASKt ODID:

FORMAL REPT NO:

00CKi? NO: 05000445 0500044o FICHE: 39988 062 39988 116 RIDS:

8703120052 01 Responds to appeal re denial of FOIA request for documents ce evaluation of issue specific action plan. Documents I-2, I-6,I-7,1-8,1-9,I-9a,I-96,I-12a,J-3 & J-30 enc 1.Remainina Apps I & J cocuments withheld (ref FOIA Exemotion 5).

FROMt.STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project 1

ISSUED: 870310 AVAIL: POR 5p0 DOCUMENT TYPE: CLNTZ FPAC: 8703120052*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39988 062 39988 118 RIDS:

8703120052 02 Responds to appeal re' denial of FOIA request for cocuments re evaluation of issue specific action plan. Documents 1-2, I-6,I-7,I-8,I-9,I-9a,I-96,I-12a,J-3 & J-3b encl. Remaining Apps I & J documents withneld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executlve Director for Operations l

To GARDE,B.P.

Government Accountability Project ISSUED: 670310 AVAIL: PDR 5pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703120052*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39988 062 39988 118 RIDS:

6/ 4/87 PAGE 6

U.

S.

NUCLEAR REGULATORY COMMISSION q

DCS PARTIAL RECORD FORMAT REPORT i

5 8703120052 03 Responds to appeal re denial of FOIA request for documents ce evaluation of issue specific action plan. Documents I-2, I-6,I-7,I-8,1-9,I-9a,I-9b,I-12a,J-3 & J-3b enc 1. Remaining Apes !E J documents withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,0.P.

Government Accountability Project ISSUED: 870310 AVAIL: DDR 5p0 DOCUMENT TYPE: CLNTZ FPAC: 8703120052*

TASK 0010:

FORMAL REPT NO:

1 DOCKET NO: 05000445 FICHE 39988 062 39988 118 RIDS:

8703120052 04 Responds to appeal re denial of FOIA request for documents re evaluation of issue specific action plan. Documents I-2, I-6,I-7,I-8el-9,I-9a,I-96,I-12a,J-3 & J-3b enet. Remaining Apps I & J documents withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executlve Director for Operations TO:

GARDE,0.P.

Government Accountability Project ISSUED: R70310 AVAIL: pDR 5pp.

DOCUMENT TYPE CLNTZ FPAC 8703120052 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39988 062 39988 118 RIDS:

8703120052 05 Responds to appeal re denial of FOIA request for document' re evaluation of issue specific action plan. Documents I-2, I-6,I-7,I-8,I-9,I-9a,I-9b,I-12a,J-3 & J-3b enc 1. Remaining Apps I & J documents withheld (ref FOIA Exemetion 5).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 970310 AVAIL: DDR 500 DOCUMENT TYPE: CLNTZ FPAC 8703120052*

TASA:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 39988 062 39988 118 RIDS:

870312n411 Responds to appeal re denial of FOIA request for documents ce evaluation of ISAPs concerninq plant. Forwards Document 4 listed in app.0ccuments 1 tneough 3 & enel to a withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870310 AVAIL: PDP 2po.

DOCUMENT TYPE CLNT2 FPAC: 8703120411*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40003 171 40003 173 RIDS:

8703120411 01 Responds to appeal re denial of FOIA request for documents ce evaluation of ISAPs concerning plant. Forwards Document 4 listed in app. Documents 1 through 3 & ene) to 4 withheld (ref FOIA Exemption 5).

l FROM: STELLO,V.

Office of the Executive Director for Operations TO:

G.A R D E, B. P.

Government Accountability Project l

ISSUED: B70310 AVAIL: pDR 2po.

DOCUMENT TYPE: CLNTZ FPAC: 8703120411*

TASK ODID:

FORMAL REPT NO:

DDCKET NO: 05000445 FICHE: 40003 171 40003 173 RIDS:

I 6/ 4/87 PAGE 7

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT B703120411 02 Responds to appeal re denial of FOIA request for documents re evaluation of ISAPs concern %ng plant. Forwards Document 4 11sted in app. Documents 1 tneough 3 & enc) to 4 withheld (rof FOIA Exemption 5).

FROM STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government AccountaD%11ty Proj ect ISSUED: 970310 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703120411*

TASK:

0010:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40003 171 40003 173 RIDS:

8703120411 03 Responds to appeal re denial of FOIA request for documents re evaluation of ISAPs concernina plant. Forwards Document a 110ted in aps.0ccuments 1 through 3 & enc) to a withheld (rof FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executive Director for Operations TOS GARDE,B.P.

Government AccounteDility Project ISSUED: 870310 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703120411 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40003 171 40003 173 RIDS:

8703120411 04 Responds to appeal re denial of FOIA request for documents ce evaluation of ISAPs concernina plant. Forwards Document 4 licted in spo. Documents 1 through 3 & encl to a withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executlve Director for Operations TOs GARDE,B.P.

Government Accountability Project ISSUED: 870310 AVAIL: ADR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703120411*

TASK ODID:

FORMAL REPT M0:

DOCKET NO: 05000445 FICHE: 40003 171 40003 173 RIDS:

8703120411 05 Responds to appeal re denial of FOIA request for documents ce evaluation of ISAPs concerning plant. Forwards Document a li0ted in app. Documents 1 through 3 8 enc) to 4 withheld (rof FOIA Exemption 5).

FROM: STELLO,V.

Office of the Execut)ve Director for Operations TO:

GARDE,B.P.

Government Accountab%14ty Proj ect ISSUED: 670310 AVAILt POR 290.

DOCUMENT TYPE: CLNTZ FPAC: 8703120411*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40003 171 40003 173 RIDS:

6703120411 06 Responds to appeal re denial of F0IA request for documents re evaluation of ISAPs concerning plant. Forwards Document U listed in app. Documents 1 through 3& enel to 4 withheld (ref FOIA Exemption 5).

l FROM: STELLO,V.

Office of the Execut%ve Director for Operations 703 GARDE,B.P.

Government Accountabllity Project ISSUED: 670310 AVAIL: ADR 2pp.

DOCUMENT TYPE CLNTZ FPAC: 8703120411*

TASK:

nDID:

FORMAL REPT ND:

DOCKET NO: 05000445 FICHE: 40003 171 40003 173 RIOS:

1

[

, 6/ 4/67 PAGE 8

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8703180250 Partial response to FOIA request for documents re facility overview quality review team b response team. Forwards App A documents. Documents also available in PDR.

FROM GRIMSLEY,D.H.

Division of Pules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountabllity Project ISSUED: 970313 AVAIL: pDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8703180250*

TASK:

0010:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044o FICHE: 40074 106 40074 147 RIDS:

8703250531 Final response to FOIA request for documents re NRC

{

evaluation of plant lesser separation between Class 1E &

W non-Class 1E circuits. Forwards App A documents. App A&B

{

documents also available in PDR.

(

FROM: GRIMSLEY,D.H.

bivision of Rules & Records'(Pre 870413)

I TO:

BAUMAN,L.

Government Accountability Project i

ISSUED: 870319 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTZ FPAC: 8703250531*

l TASK ODID:

FORMAL REPT NO:

DOChET NO: 05000445 05000446 FICHE: 40239 335 40239 344 RIDS:

8703310228 Partial response to FOIA request for documents re Comanche Peak response team.Forwaras Apo 8 documents.Apo B & C documents available in PDR.

FROM: GRIMSLEY,D.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 670325 AVAIL: PDR 30p.

DOCUMENT TYPE: CLNTZ FPAC: 8703310228*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 40284 291 40284 336 RIDS:

8703310228 01 partial response to FOIA request for documents re Comanche Peok resconse team.Forwarcs App B documents. App B&C documents available in PDR.

FROM: GRIMSLEY,0.

Division of Rules & Records-(Pre 870413)

TO:

8AUMAN,L.

Government Accountability Project ISSUED: 870325 AVAIL: 004 300.

DOCUMENT TYPE: CLNTZ FPAC: 8703310228*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40284 291 40284 331 RIDS:

8703310228 02 oartial response to FOIA request for documents re Comanche Peak response team. Forwards Apo 8 documents. App B&C documents available %n PDH.

FROM GRIMSLEY,0 Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government AccountaD%11ty Project l

ISSUED: 870325 AVAIL: PDR 3po.

DOCUMENT TYPE: CLNTZ FPAC: 8703310228*

]

TASK 0010:

FORMAL REPT NO:

t DOCKET NO: 05000445 FICHE: 40284 291 40284 331 RIDS:

j l

i a

PAGE 9

, c/ 4/87 o

U.

S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 4

8704070037 Final response to FOIA request for documents re Comanche Peak response team.Forwaras App E documents. Documents also ovoilable in PDR.

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413) l' TO:

BAUPAN,L.

Government Accountability Project ISSUED: 870402 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704070037*

TASK 0010 FORMAL REPT NO:

DOCKET NO: 05000445 0500044b FICHE: 40440 027 40440 033 RIDS:

8704070037 01 Final response to FOIA request for documents re Comanche Pook response team Forwaras Ape E documents. Documents also ovoitable in PDR.

(

.FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pro 870413) l Tot BAUMAN,L.

Government Accountability Project l

l ISSUED: 870402 AVAIL: PDP 2pp.

DOCUMENT TYPE: CLNTZ FPAC 8704070037*

TASK ODID:

FORMAL REPT NO DOCKET NO: 05000445 FICHE: 40440 027 40440 030 RIDS:

J 8704070037 02 Final response to FOIA request for documents ce Comanche Poak resconse team. Forwards App E documents. Documents also ovoilable in PDR.

FROM: GRIMSLEY,D.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870402 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTZ FPAC: 8704070037*

j TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40440 027 40440 030 RIDS:

8704070306 Partial response to FOIA request for documents re review of

)

App E (Rev 2) to Comanene Peak response team program plan.

App D documents enc 1 & available in PDR.

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TDs BAUMAN,L.

Government Accountability Project

{

ISSUED: 870402 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704070306*

i TASK:

ODID:

FORMAL REPT NO:

I DOCKET NO: 05000445 05000400 FICHE 40438 09c 40438 098 RIDS I

8704080127 Partial response to FOIA request for documents ce ofc of Investigations Case A4-86-003. Forwards App A documents.

Documents also being made available in PDR.

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Pre 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 670403 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTZ FPAC: 8704080127*

TASK ODID:

FORMAL REPT NU DOCKET NO: 05000445 0500044b FICHE: 40440 164 40400 166 RIDS:

I 5' 6/ 4/87 PAGE-10 4

f U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8704080127 01 Partial response to FOIA reauest for documents re Ofc of Investigations Case A4-B6-003. Forwards App A documents.

Documents also being mace availabic - in PDR.

FROM GRIMSLEY,0.H.

Division of Pules & Records (Pre 870413)

-TO:

BAUMAN,L.

Government Accountab411ty Project 2SSUED: 870403 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704080127*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40440 164 40440 168 RIDS:

8704150399 Responds to appeal re denial of FOIA request for documents on T Westerman 660530 Itr to util re Allegation 4-86-A=019 Forwards portions of Documents 1,3 & 9 & Documents 2,4,6 &

7. Info partia11y' withheld (ref FOIA Exemptlons 5 & 6).

FROM: STELLO,v.

Office of the Execut)ve Director for Operations To GARDE,B.P.

Government Accountability Project ISSUED: 970413 AVAIL: 90R 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704150399*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446-FICHE: 40556 296 40556 310 RIDS:

8700150399 01 Responds to appeal re denial of FOIA request for documents on T Westerman' 860530 lte to util re Allegation 4-86-A=019 Forwards documents 13sted on app. Info partially withheld (ref FOIA Exemptions 5 6 6).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B P.

Government Accountability Project

~ ISSUED: 870413 AVAIL: pDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704150399*

TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40556 296 40556 310 RIDS:

8704150399 02 Responds to appeal re denial of FOIA request for documents j

en T Westerman 860530 Itr to util re Allegation 4-86=A=019 Forwards documents Ilsted on app. Info partially withheld (ref F01A Exemptions 5 & c).

l FROM: STELLO,V.

Office of the Executive Director for Operations i

I TO:

GARDE,B.P.

Government Accountability Project ISSUED: 670413 AVAIL: PDP 2po.

DOCUMENT TYPE: CLNTZ FPAC: 8704150399*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40556 296 40556 310 RIDS:

8704150399 03 Responds to appeal re denial of FOIA request for documents on T Westerman 660530 Itr to util re Allegation 4-86-A=019 Forwards documents listed on app. Info partlally withheld (rof FOIA Exemptions 5 & 6).

J FROM STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountab411ty Project ISSUED: 870413 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8704150399*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40556 296 40556 310 RIDS:

l l' 6/ 4/67 PAGE 11 U.

S. NUCLEAR REGULATQRY COMMISSION DCS PARTIAL RECORD FORMAT REPORT B704150402 Partially deleted Itr ce 851002 meeting between CASE & NRC.

Requests assistance to set uo meeting & identify any remaining issues.

l FROM: MARTIN,R.D.

Region 4, Office of Director i

TO:

ELLIS,J.

Citizens Association for Sound Energy ISSUED: 651025 AVAIL: ADR 3po.

DOCUMENT TYPE: CLNTZ FPACs.8704150399A l

l TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40556 298 40556 300 RIDS:

l 0704150402 01 Partially deleted Itr ce 851002 meeting between CASE & NRC l

Otoff.Reauests assistance to set up meeting & identify any l

romaining issues.

FROM: MARTIN,R.D.

Region 4, Office of Director TOS ELLIS,J.

Citizens Association for Sound Energy ISSUED: B51025 AVAIL: 90R 3po.

DOCUMENT TYPE: CLNTZ FPAC: 8704150399A TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40556 298 40556 300 RIDS:

8704280186 Further response to appeals re denial of FOIA reauest for documents. Forwards Documents A-11 & A-77 re test questions, I

onswers & scores & certification results of GA personnel.

Portions withheld (ref FOIA Exemption 6).

FROM: STELLO,V.

Office of the Execut%ve Director for Operations j

TO:

GARDE,0 P.

Government AccountaDility Project

)

ISSUED: 970416 AVAIL: POR 1p.

DOCUMENT TYPE: CLNTZ FPAC 8704280186*

TASK:

ODID:

FORMAL REPT NO:

DOCKET No: 05000445 05000446 FICHE 40715 261 40716 334 RIDS:

8704280186 01 Further resoonse to appeals re denial of FOIA reauest for documents. Forwards Documents A=11 & A=77 re test questions, onswers & scores & certification results of QA personnel.

Portions withheld (ref FOIA Exemption 6).

FROM STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project l

ISSUED: 870416 AVAIL: POR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8704280186*

TASh ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40715 261 40716 334 RIDS:

1 8700280186 02 Further response to appeals ce denial of FOIA request for cocuments. Forwards Documents A-11 & A-77 re test questions, onswers & scores & certification results of GA personnel.

l Portions withheld (ref FOIA Exemption 6).

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountab314ty Project ISSUED: 870416 AVAIL: PDR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8704280186*

TASn:

0010:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40715 261 40716 334 RIDS:

\\

~6/-4/87 PAGE 12 U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 4

i 870428018e 03 Further response to appeals ce denial of FOIA request for documents. Forwards Documents A=11 & A=77 re test questions, onswers t scores & certification results of QA personnel.

l Portions withheld (ref FOIA Exemption 6).

FROM STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: e70416 AVAIL: PDR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8704280186*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40715'261 40716 334 RIDS:

8705080296 Responds to appeal re denial of FOIA request for records concerning repts listed in board Notification 84=149 i

Documents identified on encl app & forwarded will continue

'to be partis 11y withheld (FU!A Exemptions 6 & 7).

FROM 'STELLO,V.

Office of the. Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project i

ISSUED: 970505 AVAIL: DDR 2po.

DOCUMENT TYPE: CLNTZ FPAC 8705080296*

l TASK -

0D10:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40878 009 40878 342 RIDS:

8705080296 01 Responds to appeal re denial of FOIA request for records concerning repts listed in Board Notification 84=149 Documents identified on enc 1 app & forwarded will continue to be partially withhela (FOIA Exemptions 6 & 7).

FROM STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.-

Government Accountability Project ISSUED: 970505 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705080296*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40878 009 40878 342 RIDS:

8705080296 02 Responds.to appeal re denial of FOIA request for records concerning repts listed in board Notification 84=149 Documents identified on enc 1 app & forwarded will continue i

to be partially withheld (FOIA Exemptions 6 & 7).

FROM: STELLO,V.

Office of the Executive Director f'r Operations o

TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870505 AVAIL: PDR 2po.

DOCUMENT TYPE: CLNTZ FPAC 8705080296*

TASKS.

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40878 009 40878 342 RIDS:

L 6705080296 03 Responds to appeal re denia) of FOIA request for records concerning repts, listed in board Notification 84=149 Documents identified on enci app & forwarded will continue to be partially withhelo (FOIA Exemptions 6 & 7).

FROM STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870505 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705080296*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40878 009 40878 342. RIDS:

g5 6/ 4/87 PAGE 13 U. S.

NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8705140159

'Further response to appeal re denial of.FOIA request for Gocuments re Comanche Peak Task Force. Documents listed in Aep H concern potential violations. Portions of 85 App.H Gocuments continue to be withheld.(ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Execut%ve Director for Operations TO:

GARDE,B.P.

Government Accountab%11ty Project l

ISSUED - 470508 AVAIL: PDR 19.

DOCUMENT TYPE: CLNTZ FPAC: 870514016v L

TASK ODID:

FORMAL REPT NO:

l DOCKET NO: 05000445 05000446 FICHES-40920 078 40920 098 RIDS:

8705140159 01.Further response to appeal r6 denlal of FOIA request for documents re Comanche Peak. Task Force. Documents listed in App H concern potential violations. Portions of 85 App H documents continue to be withheld (ref FOIA Exemption 5).

FROM: STELLO,V.

Office of the Executive Director for Operations 10 GARDE,B.P.

Government Accountability PreJ eet ISSUED: 870508 AVAIL: pDR 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8705140159 TASK '

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40920 078 40920 098 RIDS:

8705140159 02 Further response to appeal re denial of FOIA request for Gocuments re Comanche peak Task Force. Documents listed in App H concern potential violations. Portions of 85 Ape H Gocuments continue to be withheld (ref FOIA Exemption 5),

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project

-ISSUED: 870508 AVAIL: 90R 1p.

DOCUMENT TYPE: CLNTZ FPAC: 8705140159 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHES 40920 078 40920 098 RIDS:

8705150227 Further response to appeal of denial cf FOIA 85-59 re Comanche Peak Task Force. Documents T-34 & U-42 will cont 3nue e

to be withhele (ref FOIA Exemption 5). originator of Document U-12 document contacted for further info re release.

FROM STELLO,V.

Office of the Executtwe Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 870508 AVAIL: POR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705150227

. TASK ODID:

FORMAL REPT NO:

l

-DOCKET NO: 05000445 05000446 FICHE: 40939 106 40939 107 RIDS:

8705150227.01 Further response to appeal of denial of FOIA 85-59 re Comanche Peak Task Force. Documents T-34 & U-42 will continue to be withheld (ref FDIA Exemption 5). Orig'inator of Document U=12 document contacted for further info re release.

FROM STELLO,V.

Office of the Executsve Director for Operations TO:

GARDErB.P.

Government Accountability Project ISSUED: 870508 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705150227 TASK ODID:

FORMAL REPT NO:

q

. DOCKET NO: 05000445 FICHE: 40939 106 40939 107 RIDS:

l i

Y U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT 8705150227 02 Further response to appeal of denial of FDIA 85-59 re Comanche Peak Task Force.pocuments T-34 t U-42 will continue to be withheld (ref FOIA Exemption 5). Originator of Document U-12 cocument contacted for further info re release.

FROM: STELLO,V.

Office of the Executive Director for Operations TO:

GARDE,B.P.

Government Accountability Project ISSUED: 670508 AVAIL: PDR 2pp.

DOCUMENT TYPE: CLNTZ FPACI 8705150227 TASK:

ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE 40939 106 40939 107 RIDS:

8705180029 Final response to FOIA request for documents re cost of l

eparating license review for facility from 851203 to prosent. Forwards documents listed in App B. App A documents ovailable in PDR.

FROM: GRIMSLEY,0.H.

Division of Rules & Records (Post 870413)

TO:

RUBINTON,0.S.

Government Accountability Proj ec t ISSUED: A70512 AVAILt PDR 3pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705180029*

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40961 109 40961 251 RIDS 8705180029 01 Final response to FOIA request for documents re cost of operating license review for facility from 851203 to prosent. Forwards occuments listed in App B. App A documents cvoilable in PDR.

FROM: GRTMSLEY,0.H.

Division of Rules & Records (Post 870413) l T08 RUBINTON,D.S.

Government Accountability Project j

ISSUED: 870512 AVAIL: PDR 3pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705180029*

TASK:

0010:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40961 109 40961 189 RIDS:

8705180040 Final response to FOIA request ce Investlgation Case A4-86-003.Enct App B & D documents also in PDR. App D i

documents partially withhetc (ref FOIA Exemptions 6 & 7). App i

E documents completely withheld (ref FOIA Exemptions 6 & 7).

FROM GRIMSLEY,D.H.

Division of Rules & Records (Post 870413)

T08 BAUMAN,L.

Government Accountability Project ISSUED: 870513 AVAIL: PDR lopp.

DOCUMENT TYPE: CLNTZ FPAC: 8705180040*

TASK 0010:

FORMAL REPT NO:

DOCKET NO: 05000445 05000446 FICHE: 40960 307 40960 340 RIDS:

8705180040 01 Final response to FOIA request re Investigation Case A4-86-003. Encl. App B & D documents also in POR. App D documents partially witnheid (ref F0IA Exemptions 6 & 7). App E documents completely withheld (ref FOIA Exemptions 6 & 7).

FROM GRIMSLEY,0.H.

Division of Rules & Records (Post 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870513 AVAIL: POR 10pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705180040*

TAOK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 40960 307 40960 340 RIDS:

7

\\

U.

S. NUCLEAR REGULATORY COMMISSION DCS PARTIAL RECORD FORMAT REPORT i

8705180040 02 Final response to FOIA request re Investigation Case A4=86-003. Enc 1 App B & D documents also in PDR. App D

~

documents partially witnhelo (ref FOIA Exemptions 6 & 7). App E cocuments completely withheld (ref FOIA Examptions 6 & 7).

FROM GRIMSLEY,D.H.

D4 vision of Rules & Records (Post 870413)

TO:

BAUMAN,L.

Government Accountability Project ISSUED: 870513 AVAIL: POR 10pp.

DOCUMENT TYPE: CLNTZ FPAC: 8705180040.

TASK ODID:

FORMAL REPT NO:

DOCKET NO: 05000445 FICHE: 90960 307 40960 340 RIOS:

i ed i

l 1

)

I i

i 1

l

I Doc q q.-

tm UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION g7 JUN 17 p5 30 BEFORE THE ATOMIC SAFETY AND LICENSING BOARDrt.

bOCYinu,:

n-Bia m,-

in the Matter of

)

)

TEXAS UTILITIES ELECTRIC

)

Docket Nos. 50-445 d b COMPANY, ET AL.

)

50-446

)

(Comanche Peak Steam Electric

)

Station, Units 1 and 2)

)

CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF'S FIFTH PROGRESS REPORT AND ANNOTATED BIBLIOGRAPHY" in the above-captioned proceeding have been served on the following by deposit in the United States mail, first g

class, or, as indicated by an asterisk, through deposit in the Nuclear i

Regulatory Commission's internal mall system, this 15th day of June,1987:

Peter B. Bloch, Esq., Chairman

  • Mrs. Juanita Ellis AdministrLtive Judge President, CASE
  • 6 Atomic Safety and Licensing Board 1426 South Polk Street U.S. Nuclear Regulatory Commission Dallas, TX 75224 Washington, DC 20555 Renea Hicks, Esq.

Dr. Kenneth A. McCollom Assistant Attorney General Administrative Judge Environmental Protection Division 1107 West Knapp P.O. Box 12548, Capital Station Stillwater, OK 74075 Austin, TX 78711 Elizabeth B. Johnson Robert A. Wooldridge, Esq.

Administrative Judge Worsham, Forsythe, Samples Oak Ridge National Laboratory

& Wooldridge P.O. Box X, Building 3500 2001 Bryan Tower, Suite 3200 Oak Ridge, TN 37830 Dallas, TX 75201 Dr. Walter H. Jordan Joseph Gallo, Esq.

Administrative Judge Isham, Lincoln & Beale t

881 W. Outer Drive Suite 1100 Oak Ridge, TN 37830 1150 Connecticut Avenue, N.W.

Washington, DC 20036 Billie Pirner Garde Mr. W. G. Counsil GAP - Midwest Office Executive Vice President 104 E. Wisconsin Avenue - B Texas Utilities Generating Company Appleton, WI 54911-4897 400 North Olive Street, L.B. 81 Dallas, TX 75201

William L. Brown, Esq.*

Anthony Z. Roisman, Esq.

U.S. Nuclear Regulatory Commission Suite 600 611 Ryan Plaza Drive, Suite 1000 1401 New York Avenue, NW Arlington, TX 76011 Washington, DC 20005 Mr. Harry Phillips William H. Burchette, Esq.

Resident inspector / Comanche Peak Mark D. Nozette, Esq.

Steam Electric Station Heron, Durchette, Ruckert c/o U.S. Nuclear Regulatory Commission 6 Rothwell, Suite 700 P.O. Box 38 1025 Thomas Jefferson Street, N.W.

Cien Rose, TX 76043 Washington, DC 20007 Lanny Alan Sinkin James M. McGaughy Christic Institute GDS Assoc. Inc.

1324 North Capitol Street 2525 Cumberland Parkway, Suite 450 Washington, DC 20002 Atlanta, GA 30339 Robert D. Martin

  • Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Board Panel
  • 611 Ryan Plaza Drive, Suite 1000 U.S Nuclear Regulatory Commission Arlington, TX 76011 Washington, DC 20555 Robert A. Jablon, Esq.

Atomic Safety and Licensing Appeal Spiegel & McDiarmid Board Panel

U.S. Nuclear Regulatory Commission Washington, DC 20005-4798 Washington, DC 20555 Thomas G. Dignan, Esq.

Docketing and Service Section*

Ropes & Gray Office of the Secretary 225 Franklin Street U.S. Nuclear Regulatory Commission Boston, MA 02110 Washington, DC 20555 v

Gebry $r'Mizuno Counsel for NRC Staff I

1