Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20059C4011990-08-24024 August 1990 Forwards Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27.Violations Noted ML20055H4491990-07-0303 July 1990 Forwards Summary of 900625 Meeting W/Util in Region II Ofc Re Emergency Preparedness Upgrade Program.List of Attendees Also Encl ML20059M8771990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM ML20246Q0121989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted ML20246C3941989-08-15015 August 1989 Forwards Safeguards Insp Repts 50-272/89-19,50-311/89-17 & 50-354/89-15 on 890710-14.No Violations Noted ML20246C8211989-08-11011 August 1989 Confirms 890808 Telcon Re Util Participation in NRC Regulatory Impact Survey on 891023 in Berlin,Ct.Schedule & General Discussion Groups Shown in Encl ML20248D6921989-08-0404 August 1989 Advises That Rev 6b to Generating Stations Emergency Plan Transmitted by Util 890710 Form Acceptable & Does Not Decrease Effectiveness of Plan ML20248C0561989-08-0303 August 1989 Forwards Sser Accepting 880601,0909 & 890602 Changes to ATWS Mitigation Sys Actuation Circuitry for Plants.Nrc Requested to Be Notified Upon Completion of Human Factors Review ML20245H5331989-08-0202 August 1989 Advises That 890519 Changes to QA Program Described in CPC-2A Acceptable.Issues Addressed Listed ML20247H6891989-07-25025 July 1989 Requests Proposed Design Change to Containment Hydrogen Monitoring Sys,W/Schedule for Implementing Change or Justification for Existing Configuration ML20246A2951989-06-29029 June 1989 Forwards Request for Addl Info Re NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs ML20246L2211989-06-26026 June 1989 Forwards Amends 118,33,142 & 36 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Revise Tech Specs by Removing Tech Spec Figures 6.2-1 & 6.2-2 Re Organizations Functional Requirements ML20245J3301989-06-22022 June 1989 Provides Background Info on Regulatory Analysis Supplementing NRC Proposed Backfit,Per 890413 Request.Util Expected to Provide Schedule for Implementation of Required Improvements ML20245F2691989-06-16016 June 1989 Forwards SER Accepting Licensee 850612 Response to Generic Ltr 83-28,Item 4.5.3 Re Trip Reliability & on-line Functional Testing of Trip Sys ML20245H1491989-06-15015 June 1989 Submits Correction/Clarificaton to Util 890508 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Program on Critical Air Demand Equipment Is in Addition to Investigations Performed ML20245B1731989-06-15015 June 1989 Ack Receipt of Rev 55 to QA Topical Rept CE-1-A.Program Satisfies Requirements of 10CFR50,App B & Acceptable ML20244C2941989-06-0909 June 1989 Advises Tht Util 890329 Request for Approval to Use Fuses for Electrical Isolation of non-Class 1E Dc Power Sys Acceptable Provided That Circuit Breaker in Parallel to Two Fuses Locked Open ML20245C3141989-06-0808 June 1989 Advises That Parts of 890324 Rev 23 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan.Changes Inconsistent W/Provisions Listed in Encl.Encl Withheld (Ref 10CFR73.21) ML20244C5091989-06-0101 June 1989 Advises That Bunker Ramo Penetration Assemblies Environmentally Qualified to Perform Intended Functions for Plants,Per 890224 Rept & .Concerns Expressed in Re Byron Unit 2 Satisfied ML20248C2671989-05-31031 May 1989 Forwards Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790(d) & 73.21) ML20247M7731989-05-26026 May 1989 Forwards Director'S Decision Re Ohio Citizens for Responsible Energy 10CFR2.206 Petition Re 880309 Power Oscillation Event at Lasalle,Unit 2 ML20247H3511989-05-19019 May 1989 Advises That Licensee Response to Generic Ltr 82-33 Re post-accident Monitoring Instrumentation,Per Rev 3 to Reg Guide 1.97,acceptable,except for Four Items Listed in Technical Evaluation Rept ML20247J7801989-05-19019 May 1989 Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, Mutually Agreed Upon Between NRC & Westinghouse During 890411 Meeting ML20247C1521989-05-18018 May 1989 Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. Understands That Westinghouse Will Provide Util W/Generic Bounding Analysis Re Seismic Loadings ML20247G5241989-05-18018 May 1989 Responds to Re Util Position on Dealing W/Dc Grounds After Discussion W/Nrc in 890301 Meeting.Continued Plant Operation Will Be Allowed Only So Long as Applicable Limiting Conditions/Or Action Statements Met ML20247D1731989-05-18018 May 1989 Forwards Amends 127 to Licenses DPR-32 & DPR-37 & Safety Evaluation.Amends Change Tech Spec 6.5.B.7, Station Operating Records by Clarifying Requirement to Retain Photographs of Scope Traces of Welds ML20247B2411989-05-17017 May 1989 Comments on Expeditious Actions & Notice of Audit on Generic Ltr 88-17 Re Potential Loss of Dhr.Requests Addl Info Re Training Packages,Administrative Controls for Containment Closure & RCS Level Indications ML20246Q1511989-05-16016 May 1989 Informs of Implementation Schedule for Item 1.b of NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification, Per 890411 Meeting W/Westinghouse Owners Group.Proposed Schedule for Analysis Must Be Accelerated ML20246P8141989-05-15015 May 1989 Requests Addl Info Re 881130 Application for Amends to Licenses Per Generic Ltr 87-09.Affirmation Should Be Provided That Procedures,Mgt Directives & Onsite Reviews Limit Use of Spec 3.0.4 Exceptions ML20246L2741989-05-11011 May 1989 Forwards Anl Draft Rept Re Main Steam Line Breaks in Plants Ice Condenser,Per Util 880613,0907 & 1012 Ltrs & WCAP-10988 & WCAP-10986P,for Review & Comments within 60 Days.W/O Encl ML20246Q0731989-05-0808 May 1989 Forwards Revised Tech Spec Page B 3/4 4-2,clarifying Operability Requirements for PORVs in Manual or Automatic Mode,In Response to Util 881212 Request ML20246Q3711989-05-0303 May 1989 Extends Invitation to Attend Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Agenda & Info Re Lodging Arrangements Encl ML20247A5941989-05-0303 May 1989 Extends Invitation to Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Meeting Agenda Encl ML20247A7781989-05-0303 May 1989 Extends Invitation to Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Meeting Agenda Encl ML20245L3221989-04-28028 April 1989 Ack Receipt of 881223 Submittal of Rev 8 of QA Topical Rept CPC-2A Re Transfer of QA Assigned Functions to Other Plant Organizations & Continuing QA Organizations Program Control. Topical Rept Acceptable & Meets 10CFR50,App B ML20245J0621989-04-25025 April 1989 Forwards Amends 114,30,141 & 33 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Modify Tech Specs of Four Units to Be Consistent W/Plant Restart Provision in 10CFR50.36 If Safety Limit Exceeded ML20245C3571989-04-20020 April 1989 Forwards Revised Plant Emergency Operating Procedure Insp Schedule ML20245D8511989-04-19019 April 1989 Requests Schedule to Implement Alternate Rod Injection/ Reactor Trip Sys Design in Full Compliance W/Atws Rule, within 60 Days ML20244E2811989-04-14014 April 1989 Requests Prompt Review & Reporting of Status of Implementation of TMI Action Plan Items at Plants.Printout of All TMI Items Annotated Where Tracking Sys Indicates That Implementation Not Complete Encl ML20245C8221989-04-14014 April 1989 Requests Prompt Review & Reporting of Status of Implementation of TMI Action Plan Items at Facilities. Printout of TMI Items Annotated Where Tracking Sys Indicates That Implementation Incomplete,Encl ML20244C2041989-04-10010 April 1989 Accepts Util Actions in Response to Generic Ltr 88-10 Re Nonconforming molded-case Circuit Breakers & Date of 890701 for Providing Summary of Traceability Determinations & Replacement of non-traceable Breakers ML20244A8391989-04-0606 April 1989 Advises That Emergency Operating Procedures Insp Will Be Conducted at Facilities on 890508-19.List of Required Documents & Insp Schedule Encl ML20248K5451989-04-0505 April 1989 Responds to 890224 & 0322 Ltrs Re NRC Bulletin 88-011, Pressurizer Surge Line Thermal Stratification. NRC Agrees W/Suggestion for 890407 Meeting to Discuss Util Schedular Proposal ML20247P2781989-03-31031 March 1989 Concurs W/Position Delineated in Re Fire Barrier Penetration Internal Conduit Seals 1990-08-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML20199D2291999-01-12012 January 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core of Over Safety-Related Equipment ML20155H8061998-10-29029 October 1998 Responds to Discussing NRC Initiatives & Efforts. Plans for Another Stakeholders Meeting Underway for 981113. Staff Will Continue to Solicit Feedback & Comments from Public on Initiatives ML20151T9351998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML20237B0001998-07-30030 July 1998 Confirms 980728 Telcon Between D Sommers & R Haag Re Meeting Scheduled for 980810 in Atlanta,Ga to Discuss Recent Mgt Changes & Items of Interest ML20236Q6751998-07-13013 July 1998 Forwards Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Were Identified.Conduct of Activities at Surry Facilities Was Generally Characterized by safety-conscious Operations,Sound Engineering & Maint ML20249A7951998-06-12012 June 1998 Responds to from R Saunders & L Liberatori Requesting Waiver of Fee to Review 971031 Plant,Unit 1 Risk-Informed Inservice Insp Submittal ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl ML20199G0741998-01-23023 January 1998 Discusses 980116 Meeting W/Utility in Atlanta,Ga to Provide VEPCO Opportunity to Discuss Performance at Surry Facility. List of Attendees,Plant Self Assessment ,safety Culture Memo & Suppl Handout Encl ML20198Q6451997-11-10010 November 1997 Ack Receipt of & Check for $55,000 in Payment for Civil Penalty Proposed by NRC in .Corrective Actions Will Be Examined During Future Insps ML20211N2701997-10-0707 October 1997 Forwards Insp Repts 50-280/97-11 & 50-281/97-11 on 970924. No Violations or Deviations Noted.Insp Determined Whether Activities Authorized by Licensee Were Conducted Safely & IAW NRC Requirements IR 05000280/19970011997-08-29029 August 1997 Discusses Insp Repts 50-280/97-01 & 50-281/97-01 on 970113 & 17 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 ML20141D5001997-06-25025 June 1997 Responds to 960408 Submittal Re NRC Bulletin 96-001, Control Rod Insertion Problems. Staff Determined That Required Actions Completed for North Anna Power Stations Units 1 & 2 & for Surry Power Stations,Units 1 & 2 ML20141B2731997-05-0505 May 1997 Ltr Contract:Task Order 44, Initial Exam for Surry NPP, Under Contract NRC-03-94-035,awarded to Sonalyst,Inc ML20137R2791997-03-27027 March 1997 Twentieth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App FF ML20136C4211997-03-0606 March 1997 Fifteenth Partial Response to FOIA Request for Records. App Y Records Encl & Available in PDR ML20134P3181997-02-20020 February 1997 Notifies Nuclear Power Reactor Licensees of Potential Problem Involving Protected Area Access Control at Nuclear Reactor Sites.Encl Being Withheld Due to Sensitive Info Contained within ML20133F5081996-12-31031 December 1996 Forwards Recent Revision to NRC Enforcement Policy Re All Predecisional Enforcement Conferences Scheduled After 961210.All Open to Public Observation W/Some Exceptions.Copy of Change Noted in 61FR65088 Encl ML20132E3431996-12-19019 December 1996 Fowards Emergency Response Data System Implementation Documents.W/O Encl ML20149M5511996-12-0606 December 1996 Discusses 961118 Meeting Re SALP for Surry Facility.List of Attendees & SALP Slides Encl IR 05000280/19960101996-10-28028 October 1996 Forwards Insp Repts 50-280/96-10 & 50-281/96-10 on 960908-28 & Notice of Violation ML20129H0411996-10-23023 October 1996 Extends Invitation to 961118 SALP Meeting at Plant as Observer.Subsequent to Meeting,Time Scheduled to Discuss Matters of Mutual Interest W/Regard to Regulation & Performance at Plant ML20129B8121996-10-10010 October 1996 Informs That Region II Will Host Annual Training Conference in Atlanta,Ga on 961120-21 to Inform Regional Operations & Training Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators.Map Encl ML20128G9071996-10-0303 October 1996 Forwards ERDS Implementation Documents & Data Point Library Updates for Listed Plant.W/O Encl ML20134C5451996-09-19019 September 1996 Discusses 960916 Meeting W/Util in Atlanta,Ga Re Licensee Proposal for Reviewing & Revising UFSAR ML20134C5401996-09-11011 September 1996 Confirms Predecisional Enforcement Conference to Be Held on 960909 & 10 in Atlanta,Ga to Discuss Apparent Violation Re Licensee Failure to Follow Procedures for Pressurizer Relief Tank Venting.Subj Meeting to Be Closed IR 05000280/19950201996-08-16016 August 1996 Informs That NRC Has Recently Completed Investigation of Apparent Willful Violation of Operational Procedure at Plant as Followup to Insp Repts 50-280/95-20 & 50-281/95-20 ML20059M8071993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld (Ref 10CFR73) ML20059C3471993-10-21021 October 1993 Forwards Exam Repts 50-280/93-300 & 50-281/93-300 Administered During Wk of 930920 ML20128A4951993-01-22022 January 1993 Forwards Amends 173 & 172 to Licenses DPR-32 & DPR-37 & Se. Amends Revise TS to Modify Acceptance Criteria for Functional Testing of Anchor Darling Mechanical Snubbers ML20127D2741993-01-0707 January 1993 Advises That 921222 Rev 16 to Surry,Units 1 & 2 Nuclear Security Personnel Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan ML20128Q3741991-08-26026 August 1991 Forwards Insp Repts 50-280/91-22,50-281/91-22,50-338/91-18 & 50-339/91-18 on 910731 & 0801-02.No Violations Observed ML20128Q3441991-07-11011 July 1991 Forwards Insp Repts 50-280/91-15 & 50-281/91-15 on 910520-22 & 0619.No Violations Observed ML20128Q4651991-04-17017 April 1991 Forwards Insp Repts 50-280/91-09 & 50-281/91-09 on 910326- 29.No Violations Noted ML20128Q5101991-04-12012 April 1991 Forwards Insp Repts 50-280/91-06 & 50-281/91-06 on 910224-0330 & Notice of Violations ML20059C4011990-08-24024 August 1990 Forwards Insp Repts 50-280/90-23 & 50-281/90-23 on 900723-27.Violations Noted ML20055H4491990-07-0303 July 1990 Forwards Summary of 900625 Meeting W/Util in Region II Ofc Re Emergency Preparedness Upgrade Program.List of Attendees Also Encl ML20059M8771990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C3921990-02-26026 February 1990 Approves Util 900214 Request for Use of B&W Steam Generator Plugs W/Alloy 690 as Alternative to Alloy 600.Alternate Matl Is nickel-base Alloy (ASME Designation SB-166) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20248G9731989-09-20020 September 1989 Forwards Unexecuted Amend 13 to Indemnity Agreement B-69, Reflecting Increase in Primary Layer of Nuclear Energy Liability Insurance Provided by ANI & Maelu ML20248F0321989-09-14014 September 1989 Forwards Rept of AOs at Licensed Facilities for First Calendar Quarter 1989.Plug Failure Resulted in Steam Generator Tube Leak at North Anna Unit 1 & Steam Generator Ruptured at McGuire Unit 1.W/o Encl ML20247L2401989-09-13013 September 1989 Responds to Re K Barnes Concerns Regarding Safety at Plants.Advises That to Date,Releases from Plants Remain Well within Accepted Stds ML20247G2781989-09-13013 September 1989 Partial Response to FOIA Request for Records.Apps F & G Records Available in Pdr.App H Records Partially Withheld & App I Record Completely Withheld (Ref FOIA Exemption 5) ML20247H6411989-09-12012 September 1989 Advises That 890816 Revisions to ATWS Mitigation Sys Acceptable W/Requirements of 10CFR50.62(c)(1) ML20247K2231989-09-11011 September 1989 Forwards Amends 123 & 41 to Licenses DPR-61 & NPF-49, Respectively & Safety Evaluation.Amends Change Tech Specs 4.10.1.D.1.h & 4.4.5.4.a.8 to Allow Insp of Steam Generator Tubes by Insertion of Ultrasonic Test Probe ML20247E3371989-09-0707 September 1989 Forwards Amends 122,34,143 & 40 to Licenses DPR-61,DPR-21, DPR-65 & NPF-49,respectively & Safety Evaluation.Amends Change Tech Spec Sections 6.10.2.m & 6.10.3 Re Records Retention for Radiological Effluent Monitoring & ODCM IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted 1999-09-08
[Table view] |