ML20215E874
| ML20215E874 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/06/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Tison Campbell ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20215E877 | List: |
| References | |
| IEB-85-003, IEB-85-3, NUDOCS 8610160010 | |
| Download: ML20215E874 (2) | |
See also: IR 05000313/1986026
Text
_ _ _ _ - _ _ _
_
_
__
. - - _
,
f
^
'
'
00T
f2
-
-
In Reply Refer To:
Dockets:
50-313/86-26
50-360/86-27
Arkansas Power & Light Company
ATTN:
T. Gene Campbell, Vice President -
Nuclear Operations
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. W. D. Johnson and
C. C. Harbuck of this office during the period August 1-31, 1986, of activities
authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,
Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine, and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, followup on a previously identified item, followup
on a Licensee Event Report, possible design er procedural inadequacies related
to the makeup pump room coolers, service water valve degradation, environmental
qualification of cable splices, followup on IE Bulletin 85-03, condensate
storage tank construction, followup of onsite events, and integrated
engineering safeguards test.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The findings are documented in
the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
fv4'EJohnson/cs
bCHarback
MEMIrphy
C:RPB/k g
C:RPB
. RIV:RPB
RPBfn
RPB'
i
9 jg/86
p'f/ <f 86
JEGag, ardo
RHunter
/
/ /
Is/SI6
1/jj/86
9/t4/86
/
yoe
+
G
_ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
--
.
,
,.
,
,
,
-
.
Arkansas Power & Light Company
-2-
-
',
. .. . .
'
Should you have any questions concerning this inspection, we will,be pleased to-
discuss them with you.
.
'
"
'
.
,
" -
~
-
. -
Sincerely,
j
.,
,
-
,
,
%
\\
.-
%
J. E. Gagliardo, Chief
Reactor Projects Branch
-
3
'
Enclosures:
.
~
.
l.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/86-26
50-368/86-27
cc w/ enclosures:
J. M. Levine,. Director
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
- Resident Inspector
,
R. D. Martin, RA
- EP&RPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV File
E. H. Johnson, DRS&P
- MIS SYSTEM
- RSTS Operator
- w/766
..
s
O
e