Forwards Insp Repts 50-313/86-26 & 50-368/86-27 on 860801-31 & Notice of Violation
ML20215E874
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/06/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tison Campbell
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20215E877 List:
References
IEB-85-003, IEB-85-3, NUDOCS 8610160010
Download: ML20215E874 (2)


See also: IR 05000313/1986026

Text

_ _ _ _ - _ _ _

_

_

__

. - - _

,

f

^

'

'

00T

f2

-

-

In Reply Refer To:

Dockets:

50-313/86-26

50-360/86-27

Arkansas Power & Light Company

ATTN:

T. Gene Campbell, Vice President -

Nuclear Operations

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. W. D. Johnson and

C. C. Harbuck of this office during the period August 1-31, 1986, of activities

authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One,

Units 1 and 2, and to the discussion of our findings with Mr. J. M. Levine, and

other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

maintenance, surveillance, followup on a previously identified item, followup

on a Licensee Event Report, possible design er procedural inadequacies related

to the makeup pump room coolers, service water valve degradation, environmental

qualification of cable splices, followup on IE Bulletin 85-03, condensate

storage tank construction, followup of onsite events, and integrated

engineering safeguards test.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors.

The findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

fv4'EJohnson/cs

bCHarback

MEMIrphy

C:RPB/k g

C:RPB

. RIV:RPB

RPBfn

RPB'

i

9 jg/86

p'f/ <f 86

JEGag, ardo

RHunter

/

/ /

Is/SI6

1/jj/86

9/t4/86

/

yoe

+

G

_ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

--

.

,

,.

,

,

,

-

.

Arkansas Power & Light Company

-2-

-

',

. .. . .

'

Should you have any questions concerning this inspection, we will,be pleased to-

discuss them with you.

.

'

"

'

.

,

" -

~

-

. -

Sincerely,

j

.,

,

-

,

,

%

\\

.-

%

J. E. Gagliardo, Chief

Reactor Projects Branch

-

3

'

Enclosures:

.

~

.

l.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-313/86-26

50-368/86-27

cc w/ enclosures:

J. M. Levine,. Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB
  • Resident Inspector

,

R. D. Martin, RA

  • EP&RPB
  • Section Chief (RPB/B)
  • D. Weiss, LFMB (AR-2015)
  • RIV File

E. H. Johnson, DRS&P

  • MIS SYSTEM
  • RSTS Operator
  • w/766

..

s

O

e