ML20215E646
| ML20215E646 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/11/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20215E648 | List: |
| References | |
| NUDOCS 8612230043 | |
| Download: ML20215E646 (2) | |
See also: IR 05000413/1986047
Text
_-_ ____-.
,g
N
ok. s
!
.
.
-
c
, __
,
I
DEC 111986
Docket Nos. 50-413 and 50-414
uke Power Company
ATTN: Mr. H. B. Tucker, Vice President
.
Nuclear Production Department
422-South Church Street
Charlotte, NC 28242
Gentlemen:
1
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-413/86-47 AND 50-414/86-50)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
P. K. Van Doorn, P. H. Skinner and M. S. Lesser from October 26 - November 25,
1986. The inspection included a review of activities authorized for your Catawba
facility.
At the conclusion of the inspection, the findings were discussed with
those members of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violation, references to pertinent requirements, and
elements to be included in your response are presented in the enclosed Notice
of Violation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to
the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Luis A. Reyes /for
Roger D. Walker, Director
Division of Reactor Projects
Enclosures: (See page 2)
_
eg22gh
k3
L
so/
, . . . . . .
. - _ _ _ _
_ _ - .
,s.
s
,.
Duke Power Company
2
DEC 111986
.
Enclosures:
1..
2.
NRC. Inspection Report-
c w/encls:
J. W. Hampton, Station Manager
[ccw/encis:
W RC Resident Inspector
Document Control Desk
S te of South Carolina
Ii4
d. Ja bbov Q M G C' b b'1
.
RII
RII
s:lb
VBro lee
.4/f/86
p/ q /8C
lY
_
. .
.
_
, _ . _ _ _ _ _ _ _ _ _ _
. . . - .