Text

.

IN $

Docket Nos.: STN 50-455 STN 50-456 STN 50-457 Mr. Dennis I.. Farrar Director of Nuclear I.icensing Commonwealth Edison Company P.O. Box 767 Chicago, Il 60690

Dear Mr. Farrar:

SUBJECT:

INITIAI. TEST PROGRAM - BYRON 2, BRAIDWOOD 1 AND 2 By letter dated June 23, 1986, you requested that one Startup Test be modified and that five Startup Tests be eliminated in the Startup Test Program for Byron 2 and Braidwood I and 2. Enclosure 1 is our safety evaluation which concludes that the modification to rod drop measurements test and the elimination of pseudo rod ejection test, flux asymmetry evaluation test, and turbine trip from 25% power test are acceptable. However, the elimination of shutdown from outside control room test and loss of offsite power test is not acceptable; these two tests should be done on all three units.

Enclosure 2 is a request for additional information based on changes made in FSAR Amendment 47. Please provide response to these questions within 30 days of the date of this letter.

If any further clarification is needed, contact the Byron Project Manager, l.. Olshan, at (301)-492-4937 or the Braidwood Project Manager, J. Stevens, at (301)-492-7702.

Vincent S. Noonan, Director PWR Project Directorate No. 5 Division of PWR I.icensing-A

Enclosures:

As stated cc: See next page

_ Distribution:

'~ Docitet - Files %

l. Olsh W %

M:PD#5 PM: PD#5h D:PD#5 Olshan:js J. Stevens V. Noonan pf'/ t /86 .09/ / /86 go to OFFICIAI. RECORD COPY

$$ [ /86  ;

stA188M!8t!8jk A

~  !

)

1

. IN M Docket N:s.: STN 50-455

'~ STN 50-456 STN 50-457

~

I ,, ' .

Mr. Dennis I. Farrar Director of Nuclear 1.icensing Commonwealth Edison Company P.O. Box 767 Chicago, II. 60690

Dear Mr. Farrar:

SUBJECT:

INITIAL. TEST PROGRAM - BYRON 2, BRAIDWOOD 1 AND 2 ,

By letter dated June 23, 1986, you requested that one Startup Test be modified and that five Startup Tests be eliminated in the Startup Test Program for Byron 2 and Braidwood I and 2. Enclosure 1 is our safety evaluation which concludes that the modification to rod drop measurements test and the elimination of pseudo rod ejection test, flux asymmetry evaluation test, and turbine trip from 25% power test are acceptable. However, the elimination of shutdown from outside control room test and loss of offsite power test is not acceptable; these two tests should be done on all three units.

Enclosure 2 is a request for additional information based on changes made in FSAR Amendment 47. Please provide response to these questions within 30 days of the date of this letter.

If any further clarification is needed, contact the Byron Project Manager,

l. Olshan, at (3011-492-4937 or the Braidwood Project Manager, J. Stevens, at (3011-492-7702.

Vincent S. Noonan, Director PWR Project Directorate No. 5 Division of PWR I.icensing-A -

Enclosures:

As stated cc: See next page Distribution:

Docket Files - NRC PDR Local PD. MRushbrook L. Olshan PD#5 R/F T. Novak JStevens J. Partlow B. Grim s E. Jordan ACRS (1 M:PD#5 PM:

PD#5h D:PD#5

.01shan:js J. Stevens V. Noonan -

pf/'I /86 .09/ / /86 $0/ /86 ..

to to

/

OFFICIAI. RECORD COPY

  • I :I km Ati 6 k, UNITED STATES

[" g NUCLEAR REGULATORY COMMISSION L 'e j WASHINGTON, D. C. 20655 yD 80s Docket Nos.: STN 50-455 STN 50-456 STN 50-457 Mr. Dennis t.. Farrar Director of Nuclear licensing ,

Commonwealth Edison Company l P.O. Box 767 Chicago, It. 60690

Dear Mr. Farrar:

SUBJECT:

INITIAL. TEST PROGRAM - BYRON 2, BRAIDWOOD 1 AND 2 By letter dated June 23, 1986, you requested that one Startup Test be modified  ;

and that five Startup Tests be eliminated in the Startup Test Program for Byron 2 and Braidwood 1 and 2. Enclosure 1 is our safety evaluation which concludes that the modification to rod drop measurements test and the elimination of pseudo rod ejection test, flux asymmetry evaluation test, and turbine trip from 25% power test are acceptable. However, the elimination of shutdown from outside control room test and loss of offsite power test is not acceptable; these two tests should be done on all three units.

Enclosure 2 is a request for additional information based on changes made in FSAR Amendment 47. Please provide response to these questions within 30 days of the date of this letter.

If any further clarification is needed, contact the Byron Project Manager,

l. Olshan, at (301)-492-4937 or the Braidwood Project Manager, J. Stevens, .

at (301)-492-7702.

A /

i

/ dh

. Noon n, Dir(ctor Project Dir ctorate No. 5 Division of PW t.icensing-A

Enclosures:

As stated cc: See next page g . .

~

Mr. Dennis L. Farrar

, Commonwealth Edison Company Byron /Braidwood cc:

Mr. William Kortier Dr. Bruce von Zellen Atomic Power Distribution Department of Biological Sciences Westinghouse Electric Corporation Northern Illinois University Post Office Box 355 DeKalb, Illinois 61107 Pittsburgh, Pennsylvania 15230 Joseph Gallo, Esq. U. S. Nuclear Regulatory Commission Isham,l.incoln & Beale Byron / Resident Inspectors Office 1150 Connecticut Ave., N.W. 4448 German Church Road Suite 1100 Byron, Illinois 61010 Washington, D. C. 20036 Ms. Diane Chavez C. Allen Bock, Esquire 528 Gregory Street Post Office Box 342 Rockford, Illinois 61108 Urbana, Illinois 61801 Mrs. Phillip B. Johnson Thomas J. Gordon, Esquire 1907 Stratford t.ane Waaler, Evans & Gordon Rockford, Illinois 61107 2503 S. Neil Champaign, Illinois 61820 Douglass Cassel, Esq.

109 N. Dearborn Street Ms. Bridget I.ittle Rorem Suite 1300 Appleseed Coordinator Chicago, Illinois 60602 117 North Linden Street Essex, Illinois 60935 Ms. Pat Morrison 5568 Thunderidge Drive Mr. Edward R. Crass Rockford, Illinois 61107 Nuclear Safeguards and I.icensing Division David C. Thomas, Esq.

Sargent & l. undy Engineers 77 S. Wacker Drive 55 East Monroe Street Chicago, Illinois 60601 .

Chicago, Illinois 60603 Elena 7. Kezelis, Esq.

U. S. Nuclear Regulatory Commission Isham, Lincoln & Beale Resident Inspectors Office Three First National Plaza RR#1, Box 79 Suite 5200 Braceville, Illinois 60407 Chicago, Illinois 60602

[ - .

B.

Byron /Braidwood cc:

Regional Administrator U. S. NRC, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Charles D. Jones, Director Illinois Emergency Services and Disaster Agency 110 East Adams Street Springfield, Illinois 62706 Ms. Lorraine Creek Rt. 1, Box 182 Manteno. Illinois 60950 Mr. Michael C. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outer Park Drive Springfield, Illinois 62704 Michael Miller Isham, Lincoln & Beale One First National Plaza 42nd Floor Chicago, Illinois 60603 George L. Edgar Newman & Holtzinger, P.C.

1615 L Street, N.W.

Washington, D.C. 20036 .

o

, , + . , - , , -- -