ATTACIIMENT A ORIGINAL TECHNICAL SPECIFICATION CHANGES REQUESTED BY NPF-38-30 r
f i
l i
86101002S6bb0 392 l
[
P i
J INDEX LIST OF FIGURES SE0"IAED SI###O O A AUO V#'""[
FIGURE PAGE AS A FuNc richt of CONCENTRA TIOhl 3.1-1
"!"!""" "0 "! C tC I O ST^" *CE "", "C '.""!.'""
T "." FATU": "O A TU':CT 04 Or ';T0"C0 0";0 AGM-GONGEMMAMG4.................................
3/4 1-13 3.1-2 CEA INSERTION LIMITS VS THERMAL P0WER..............
3/4 1-27 3.2-1 ALLOWA8LE PEAK LINEAR HEAT RATE VS BURNUP..........
3/4 2-2 3.2-2 DNBR MARGIN OPERATING LIMIT BASED ON COLSS.........
3/4 2-8 3.2-3 DNBR MARGIN OPERATING LIMIT BASED ON CORE PROTECTION CALCULATORS (COLSS OUT OF SERVICE)......
3/4 2-9 3.4-1 DOSE EQUIVALENT I-131 PRIMARY COOLANT SPECIFIC ACTIVITY LIMIT VERSUS PERCENT OF RATED THERMAL POWER WITH THE PRIMARY COOLANT SPECIFIC ACTIVITY >1.0 pCi/ GRAM DOSE EQUIVALENT I-131.......
3/4 4-27 3.4-2 REACTOR COOLANT SYSTEM PRESSURE / TEMPERATURE LIMITATIONS FOR 0-8 EFFECTIVE FULL POWER YEARS (HEATUP)...........................................
3/4 4-30 3.4-3 REACTOR COOLANT SYSTEM PRESSURE / TEMPERATURE LIMITATIONS FOR 0-8 EFFECTIVE FULL POWER YEARS (C00LDOWN).........................................
3/4 4-31 3.6-1 CONTAINMENT PRESSURE VS TEMPERATURE...............
3/4 6-12 4.7-1 SAMPLING PLAN FOR SNUB 8ER FUNCTIONAL TEST..........
3/4 7-26 S.1-1 EXCLUSION AREA............................
5-2 S.1-2 LOW PO PU LATION Z0NE................................
5-3 S.1-3 SITE BOUNDARY FOR RADIOACTIVE GASEOUS AND LIQUID EFFLUENTS...................................
5-4 6.2-1 0FFSITE ORGANIZATION FOR MANAGEMENT AND TECHNICAL SUPP0RT.................................
6-3 6.2-2 PLANT OPERATIONS ORGANIZATION......................
6-4 WATERFORD - UNIT 3 XIX
REACTIVITY CONTROL SYSTEMS FLOW PATHS - OPERATING LIMITING CON 0! TION FOR OPERATION l
.2 At least two of the following three boron injection flow paths s be OP a.
One flow rom the boric acid makeup tanks a boric acid makeup pump wit associated heat traci rcuit and a charging J. A/ SEAT 1 pump to the Reactor Coo
- System, b.
One flow path from the bor cid tanks via a gravity feed valve with one associ heat tracing cir and a charging pump to the Reactor nt System, or c.
The f path from the refueling water storage pool via a char '
to the Reactor Coolant System.
APPLICABILITY:
MODES 1, 2, 3, and 4.
N ref*"r'**d/8 *I Trdel4 cab
- 3. Al.1 or 3.t.l.2, ahickener is off **hk f
y ACTION:
w With only one of the above required boron injection flow paths to the Reactor Coolant System OPERABLE, restore at least two boron injection flow paths to tae Reactor Coolant System to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAND 8Y and borated to a SHUTDOWN MARGIN equivalent to.........-.... -,.,
d 200*" within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two flow paths to OPERABLE i
status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
l SURVEILLANCE REQUIREMENTS 4.1.2.2 At least two of the above required flow paths shall be demonstrated OPERABLE:
..,__________,2.._
m..
.m
.m.
m_
E ~ ': D':-[:-
- 7:' ' ;::
T
- ' :' ~ "~ ' :G : L ~"'
INSEKT2 ~~
"."....'.. ' ;.. "_ _.Z: ' :::". :1_ -". '.. :.Z, i' r;, ; r ".' '.._.'.,'.
'. T". ;..
p y
..........y b.
At least once per 31 days by verifying that each valve (manual, power.-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
c.
At least once per 18 months during shutdown by verifying that each automatic valve in the flow path actuates to its correct position on an SIAS test signal.
d.
At least once per 18 months by verifying that the flow path required by Specification 2.1.2.2
.,--d 3.1.2.2';. delivers at least 40 gpm to l
3.1.2..ta, lad.il N o.J WATERFORD - UNIT 3 3/4 1-7
. ~-_
INSERT 1 3.1.2.2 At least two boron injection flow paths to the RCS via the charging pumps shall be OPERABLE. The following flow paths may b 2 used:
a.
With the contents of either boric acid makeup tank in accordance with Figure 3.1-1, at least 2 of the following 3 flow paths shall be OPERABLE:
1.
One flow path from the boric acid makeup tank via its boric acid makeup pump; or 2.
One flow path from the boric acid makeup tank via its gravity feed valve; or 3.
One flow path from the Refueling Water Storage Pool.
b.
With the combined contents of both boric acid makeup tanks in accordance with Figure 3.1-1, both of the following flow paths shall be OPERABLE:
1.
One flow path consisting of both boric acid makeup pumps, and 2.
One flow path consisting of both gravity feed valves.
INSERT 2 a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the Reactor Auxiliary Building temperature is below 55'F by verifying that the temperature of the boric acid makeup tank (s) is above 55*F.
[
$GQ UIAEb STodGb BORIC Ac1b voLUl115 AS A
FUNCTION OF CoACENTR A TION
{
850 %
~
w k
$?EGloN O F AccEPTA6LE OPEtt1TIo6>
y k
4 a'N X
)3co&=
=
RkkT at I7po ypm
=
Ab>SP at Joco ffm
$k>$P at 23M ffm i
=
h (157.)
k 10 000 =
N x
(77%}
f 9000 =
\\
are x
g%
RE&to^l 0F UN Ac<:GPTABI.E ofGRA YlON k
God
\\
vooor g
k (S)%)
k e
1 L
n li n
.So 215 3.oo 3.2s 3.co M)ol?!)
(41,12s)
(s,asa)
(3,7eo)
(4,jps) j2s (3,450)
Boric Aczn concenrennon, or s y)
Figure s. u -I
% l-IS l
2
W 40 ATTACIDIENT B REQUESTED MODIFICATION TO NPF-38-30
r-s.
INSERT 1 3.1.2.2 At least two boron injection flow paths to the RCS via the charging pumps shall be OPERABLE. The following flow paths may.be used:
a.
With the contents of either boric acid makeup tank in accordance with Figure 3.1-1,
'- - ' ' ' the following flow paths shall be OPERABLE:
Au nce.cPrA BL.E 1.
One flow path from hboric acid makeup tank via its boric acid makeup pump; e M D AN Ac.ca PrA BL E 2.
One flow path from $ boric acid makeup tank via its gravity feed valve; or 3.
0..;
f1;; p;d.
f.._ th; ".;f;;1ic.; ";;;; C:;;;;;; ";;1.
b.
With the combined contents of both boric acid makeup tanks in accordance with Figure 3.1-1, both of the following flow paths shall be OPERABLE:
1.
One flow path consisting of both boric acid makeup pumps, and 2.
One flow path consisting of both gravity feed valves.
INSERT 2 c.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the Reactor Auxiliary Building temperature is below 55'F by verifying that the temperature of the boric acid makeup tank (s) is above 55'F.
. - - -