1 TABLE 3.3-1 REACTOR TRIP SYSTEN INSTRUNENTATION s

NINIMIN l

5 TOTAL NO.

CHANNELS CHANNELS APPLICA8LE OF CHANNELS TO TRIP OPERA 8LE M00ES _

ACTION

n FUNCTIONAL UNIT 1

5 2

1 2

1, 2 c

d 1.

Manual Reactor Trip 2

1 2

3*, 4*, 58 10 s*

Power Range, Neutron Flux 4

2 3

1, 2 2#

l e-High Setpoint 4

2 3

1###, 2 2#

2.

=

a.

b.

Low Setpoint 4

2 3

1, 2 2#

Power Range, Neutron Flux 3.

High Positive Rate 2#

2 3

1, 2 4

Power Range, Neutron Flux, 4.

{

High Negative Rate 2

1 2

188#, 2 3

Intermediate Range, Neutron Flux

{

5.

4 2##[l 5*

Source Range, Neutron Flux 2

1 2

37

'jK g o 6.

2 1

2 Startup Shutdown ( % f i I

2 Sf% (*

5 a.

b.

1

( G i-G 6#

7.

Overtemperature aT 4

2 3

1, 2 Four Loop Operation 6#

ES 8.

Overpower AT 4

2 3

1, 2

'o m to Four Loop Operation 6#

g 2

3 1

4

>o Pressurizer Pressure-Low 82 9.

SU 4d SS T OPJ i $$PU

-u m

G TABLE 3.3-1 (Continued)

ACTION STATEMENTS (Continued)

ACTION 4 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, suspend all operations involving positive reactivity changes.

ACTION 5 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip breakers, suspend all operations involving positive reactivity changes and verify Valvey

..u,

, ~, ym

  1. -* M ace closed and secured in position within the next hour.

3 fN-23o is ACTION 6 - With the number of OPERABLE channels one.less than the Total Number of Channels, STARTUP and/or POWER OPERATION tray proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and b.

The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

  • for surveillance testing of other channels per Specification 4.3.1.1.

ACTION 7 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed until performance of the next required ANALOG C-2NNEL OPERATIONAL TEST provided the inoperable channel is placed i., the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 8 - With less than the Minimum Number of Channels OPERABLE, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> determine by observation of the associated permissive status light (s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

ACTION 9 - With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STAN08Y within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.1.1, provided the other channel is OPERA 8LE.

ACTION 10 -With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor trip breakers within the next hour.

ACTION 11 -With the number of OPERABLE channels less than the Total Number of Channels, operation may continue provided the inoperable channels are placed in the tripped cogdition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

CATAWBA - UNITS 1 & 2 3/4 3-6

3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION LIMITING CONDITION FOR OPERATION The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform an 3.9.1 either:

A K,ff of 0.95 or less, or a.

A boron concentration of greater than or equal to 2000 ppa.

b.

APPLICABILITY: MODE 6."

ACTION:

With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes and initiate and continue boration at greater than or equal to 30 gpa i

of a solution containing greater than or equal to 7000 ppa boron or its J

is reduced to less than or equal to 0.95 or the' boron equivalent until KconcentrationisrINoredtogreaterthanorequalto2000ppe,whicheveris the more restrictive.

J SURVEILLANCE REQUIREMENTS The more restrictive of the above two reactivity conditions shall be l

4.9.1.1 determined prior to:

Removing or unbolting the reactor vessel head, and a.

Withdrawal of any full-length control rod in excess of 3 feet from b.

its fully inserted position within the reactor vessel.

The boron concentration of the Reactor Coolant System and the refueling J

4.9.1.2 canal shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

(uM S 4,9,1,3} y,j y,g --,-23 0 closed and secured in position by

""-Ot0, ""-241. rd /i-244 shall be verified M

00 )')

\\

e<

uu_.' "

-t 'r' ;n:r at least once per 31 days.

"The reactor shall be maintained in MODE 6 whenever fuel the head removed.

i 3/4 9-1 CATAWBA - UNITS 1 & 2