ENCLOSURE 1 NOTICE OF VIOLATION Duke Power Company Docket Nos. 50-413, 50-414 Catawba License Nos. NPF-35, NPF-48 During the Nuclear Regulatory Commission (NRC) inspection conducted on April 13-17, 1987, a violation of NRC requirements was identified. The violation involved failure to adhere to radiation control procedures for transportation of radioactive materials. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986), the violation is listed below:

Technical Specification 6.8.1 requires that written procedures be established, implemented and maintained covering applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A, Regulatory Guide 1.33, Paragraph G.S.C states that the licensee should have radiation survey procedures.

Radiation Control Procedure HP/0/B/1006/12, Shipment of Dewatered Resins, dated April 2,1987, requires in Step 4.12.1 that an exit survey be performed on a loaded vehicle and that radiation levels be listed for points: (1) one-half inch (contact) and two meters from the vertical plane projected from the outer edges of the vehicle and (2) inside the cab.

Contrary to the above, the licensee failed to adhere to radiation control procedures in that:

1. The results of radiation surveys performed inside the cab for radioactive material shipments LBD 87-13 on February 23, 1987, and CNS 87-21 on March 20, 1987, were not listed on the survey data sheets, and
2. The results of radiation surveys performed at a point two meters from the vertical plane of the vehicle for radioactive material shipments CNS 87-10 on February 6,1987, and CNS 87-13 on February 23, 1987, were not listed on the survey data sheets.

This is a Severity Level V violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, Duke Power is hereby required to submit to this Office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including:

(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further 8706120225 870501 PDR ADOCK 05000413 G PDR

t L

violations, and (5) the date when full; compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

FOR THE NUCLEAR REGULATORY COMMISSION aupnxt %

Douglas M. Collins, Chief >

Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards Dated at Atlanta, Georgia this 1 day of May 1987 1