ML20214R906

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/86-31 & 50-446/86-25 on 861101- 1231 & Notices of Violation & Deviation
ML20214R906
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/01/1987
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20214R909 List:
References
NUDOCS 8706090051
Download: ML20214R906 (3)


See also: IR 05000445/1986031

Text

t

-

e

+.s

M

!E

In Reply Refer To:

Dockets: 50-445/86-31

!

50-446/86-25

Texas Utilities Generating Company

ATTN:

Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, L.B. 81

Dallas, Texas

75201

Gentlemen:

This refers to the inspection conducted by Mr. I. Barnes and other members of

the Region IV Comanche Peak Group during the period November 1 through

December 31, 1986, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,

Units 1 and 2, and to the respective discussions of our findings with you and

other members of your staff during and at the conclusion of the inspection.

Areas examined during the inspection included Coman:he Peak Response Team

activities and assessment of allegations. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspectors. These

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

these violations, in writing, in accordance with tne provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

Also during this inspection, it was found that certain of your activities

appeared to deviate from commitments made to the NRC. These items and

references to the commitments are identified in the enclosed Notice of

Deviation.

You are requested to respond to these deviations in writing. Your

response should be based on the specifics contained in the Notice of Deviation

enclosed with this letter.

We have also examined actions you have taken with regard to previously

4

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

i

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

!

required by the Paperwork Reduction Act of 1980, PL 96-511.

RIV:RI

RI_-qg

RI h

Dh

C:CPTG 6

AC[

J

l

LEllersha tw

CHale

PWagner

RV5p%/87

'essard

IBarnes

Johnson

MEmerson

[DcW87

.f/32/87

6/2187

$/s

5/W8

&///87

$ joopg7

'

,/&oI

%

B706090051 870601

i

PDR

ADOCK 05000445

0

PDR ,+

O

e

Texas Utilities Generating Company

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed by:

R.E. HALL

E. H. Johnson, Director

Division of Reactor Safety and

Projects

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - Notice of Deviation

3.

Appendix C - NRC Comanche Peak Response

Team Activities Inspection Report

50-445/86-31

50-446/86-25

cc w/ enclosures:

Texas Utilities Electric Company

ATTN:

G. S. Keeley, Manager,

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas

75224

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P.O. Box 12548

Austin, Texas

78711-2548

Administrative Judge Peter Bloch

U. S. Nuclear Regulatory Commission

Washington, D.C.

20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P.O. Box X, Building 3500

Oak Ridge, Tennessee 37830

o'

o

Texas Utilities Generating Company

-3-

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

881 Outer Drive

Oak Ridge, Tennessee 37830

Anthony Roisman, Esq.

Executive Director

Trial Lawyers for Public Justice

2000 P. Street, N.W., Suite 611

Washington, D.C.

20036

Texas Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

"RPB

  • MIS System
  • RRI-0PS
  • RSTS Operator
  • RRI-CONS
  • R&SPB
  • T. F. Westerman, RSB

DRSP

V. Noonan, NRR

R. Martin, RA

S. Treby, ELD

  • RSB
  • RIV File

J. Taylor, IE

>

  • D. Weiss, LFMB (AR-2015)

J. Konklin, IE

  • I. Barnes, CPG

M. Emerson, AC

  • w/766

!

- _ _ - -

- _ .

-

. - _ - . -

. - - . . -

, _ - _ _ . . _ _ . - .

, - . _ _