ML20214Q283

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request for Documents Re Physical Independence of Electrical Cables at Facility.App a Documents Available in Pdr.App B Documents Forwarded & Available in PDR
ML20214Q283
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/26/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Murphy S
NUCLEAR INFORMATION & RESOURCE SERVICE
Shared Package
ML20214D170 List:
References
FOIA-86-760 NUDOCS 8612050076
Download: ML20214Q283 (3)


Text

_ _ _ - _ _ _ _ _

U.S. RUCLEAR REGULATORY COMMISSION NRC Foia REQUEST NUMBEP Si

[r"'*% ., fo/AP - 74 - 74 0 I 'O f

5 RESPONSE TO FREEDOM OF hh-hfh I"N^'

Reseo~se rvee W "''

( e...e

/ INFORMATION ACT (FOIA) REQUEST

NOV '2 61986 DOC AtT NWSER;Si i# separeces REQUESTER C,. alf Eni LJ l PART 1[-- REC DS/ELEASED OR NOT LOCATED (See checked bores)

No agency records subiect to the request have been located.

No additonal agency records subsect to the request have been located.

Agency records subject to the request that are identifed in Appendix are already available for public mapection and copymg in the NRC Public Document Room, 1717 H Street. N.W., Washington. DC.

Agency records subject to the request that are ident/ed in Appenda are being made avaelable for pubhc inspection and copying in the NRC Public Document Room,1717 H Street, N.W., Washington, DC. in a folder under this FOIA number and requester name.

The nonpropnetary versson of the proposala) that you agreed to accept in a telephone conversation with a rnember of my staff is now bemg made avaiable for public inspecton and coying at the NRC Public Document Room.1717 H Street, N W , Washington, DC, in a folder under this FOIA number and requester name.

Enclosed is informaton on how you may obtain access to and the char ges for copying records placed in the NRC Public Document Room,1717 H Street, N W. Washington, DC.

Agency records subrect to the request are enclosed. Any applicable charge for copies of the records provided and payment procedures are noted in the comments section.

Records subt ect to the request have been referred to another Federal agency (ies) for review and direct response to you.

In view of NRC~s response to tNs request no fudher action is bemg taken on appeal letter dated PART ll.A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certam mformaton in ti.e requested records is being withheld from public disclosure pursuant to the FOIA exemptons desenbed in and for the reasons stated in Part II. sec-tions B. C. and D. Any released portons of the documents for which only part of the record is bemg withheld are being made available for pubhc inspection and copying in the NRC Pubhc Document Room.1717 H Street, N W., Washington, DC. m a folder under this FOI A number and requester name.

Comments SiG TURE. DIRECTOR. OlVi 3C OF RVLf3 0 RECORD 5 li. 0 LN t. / f,rAgj&

8612050076 861126 PDR FOIA MURPHY 86-760 PDR NRC FORM 464 iPen n

,e .

j

I o -\ l F01A-86-760 APPENDIX A.

Items 1, 2, & 3
1. 06/22/83 Letter to Harold R. Denton from M. A. McDuffie, re:

Shearon Harris Nuclear Power Plant, Units 1 and 2 Acc. No. 8306270217 (6 pages)

2. 12/12/84 Inspection Report 50-400/84-41 Acc. No. 8501080572 (100 pages) - Item 2
3. 05/15/86 Letter to E.E. Utley from Bart Buckley re: " Summary of Site Visit at Shearon Harris Relating to Electrical, Instrumentation and Control Systems," Acc. No. 8605210046 (6 pages)
4. 09/29/86 Letter to Harold R. Denton from S.R. Zimmerman,.re: " Letter dated June 19, 1985 (NLS-85-200) from S.R. Zimmerman (CP&L) to H.R. Denton (NRC)," Acc. No. 8610080393 (17 pages) .

t i

i I

I i

1

F01A-86-760 APPENDIX B Items 1, 2, & 3

, 1. 02/15/86 Memorandum for Bartholomew Buckley from Charles E. Rossi, i re: "Shearon Harris Nuclear Power Plant, Unit 1 - Docket 50-400

} Test Report on Electrical Separation Verification Testing (8 pages)

2. 04/10/86 Menorandum for Bart Buckley from C. E. Rossi, re: "EICSB Site Audit Report on Shearon Harris (34 pages) l
3. 04/28/86 Memorandum for Faust Rosa from 0.P. Chopra re: " Summary of Site Visit Held on January 28-30, 1986 at Shearon Harris Plant (5 pages)
4. 07/07-16/86 Meeting Notes (2 pages) - Item 2 1

l l

6