ML20214M714

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/87-27 & 50-425/87-27 on 870310-0417 & Notice of Violation.Another Violation Described in Insp Rept Under Consideration for Escalated Enforcement Action,So No Violation Issued at Present
ML20214M714
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/19/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20214M717 List:
References
NUDOCS 8706010409
Download: ML20214M714 (3)


See also: IR 05000424/1987027

Text

'

. .,

'clJ

.. . ..

MAY 101987

Docket Nos. 50-424 and 50-425

License Nos. NPF-68 AND CPPR-109

' rgia Power Company

TTN: Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations

P. O. Box 4545-

Atlanta, GA 30302

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/87-27 AND 50-425/87-12)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Messrs, H. H. Livermore, J. F. Rogge, and R. J. Schepens on March 10 thru

April 17,1987. The inspection included a review of activities authorized for

your Vogtle facility. At the conclusion of the inspection, the findings were

discussed with those members of your staff identified in the enclosed inspection

report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to

be included in your response are presented in the enclosed Notice of Violation.

Another violation described in the enclosed Inspection Report is under

consideration for escalated enforcement action. Accordingly, no Notice of

Violation for this violation is being issued at this time, and no response is

required. However, please be advised that the characterization of the

violation described in the enclosed Inspection Report may change as a result

of further NRC review. You will be advised by separate corresdence of the

results of our deliberations on this matter. Additionally, an enforcement

conference has been scheduled for May 19, 1987, in Atlanta.

Your attention is invited to an unresolved item identified in the inspection

report. This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

.4

0

??O!__L

- .

-

% e

. - f. .

Georgia Power Company 2

MAY 191987

Should you have any questions c'oncerning this letter, please contact us.

. Sincerely,

I

/

J. Nelson Grace

Regional Administrator

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

/cw/encis:

R. E. Conway, Senior Vice President &

, Project Director

Whitney, General Manager Project

/

,

'

Support

P; D. Rice, Vice President, Project

/ Director, Unit 2

/ R. H. Pinson, Vice President, Project

/ Construction

gC.W. Hayes,VogtleQuality

Assurance Site Manager

h B. Bockhold, General Manager,

Nuclear Operations

L. Gucwa, Manager, Nuclear Safety

j and Licensing

J J. A.' Oailey, Project Licensing

/ Manager

A . W. Churchill, Esq., Shaw,

j Pittman, Potts and Trowbridge

.

yJ.E. Joiner,Troutman, Sanders,

Lockerman and Ashmore

G. Ledbetter, Commissioner,

/ Department of Human Resources

VC H. Badger, Office of Planning

h.andBudget Kirkland, III, Counsel,

Offi:e of the Consumer's Utility

/ Council

VD. Feig, Georgians Against

j Nuclear Energy

/ M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

(cc w/ enc 1s cont'd - see page 3)

(

r

. . - t - , ,r- -. . ,--. . . ,- _ _ . - n _ e,.,,,,,.,.. . - _ . _ , , . _ - - , , - . - - - . , _ - , _ , . - - . ,-.,,n..

- - - - - - _ - - - _ - - - - - - - - - _ -

,

-

%

.. ..

~

Georgia Power Company 3

MAY 19 1987

. (ed.w/enclscont'd)

I

' @ r. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/ Panel

VG. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

c w/encis:

. Reis, OGC

M. Miller, NRR

M. Sinkule, RII

/ocumentControlDeskRC

D Resident Inspector

State of Georgia

,

-

.--

b

4/W T Psc,bfes

S/f(/97

4 , /<M Reyes

/'Ti

EChristnot:Jw [ MSinkule iVLBrownlee /NLErnst

5/g/87 / 5/f/87 ' 5/lf/87 5/$/87

f 5/ M 87

. .-