1 Operations Summary October 1985 The following sununary describes the significant operation activities during the reporting period.
In support of this sununary, a chronological log of significant events is included in this report.
There were four reportable occurrences and one revis,lon to previous occurrences reported to NRC during the P.onth of October.
Unit 1 The unit was in cold shutdown the entire month an it undergoes several modifientions including those necessary to bring it into compliance with environmental qualification required under NUREG 0588.
~
~
Unit 2 The unit remained in administrative hold the entire month. The unit is also undergoing its end-of-cycle 5 refueling.
Unit 3 The unit was in cold shutdown the entire month on administrative hold to resolve various TVA and NRC concerns.
Prepared principally by B. L. Porter.
Revision 8609100335 860806 PDR ADOCK 05000259 R
3 Refueling Information OCTOBER 1985 Unit 1 The unit was shut down on March 19, 1985, and remains in cold shutdown because of unfinished modifications to meet environmental concerns. The unit began its sixth refueling on June 1, 1985. This refueling will involve loading 8x8R (retrofit) fuel assemblies into the core, replacing recirculation piping work on "A" and "B" low-pressure turbine, upgrade hangers and anchors, and environmentally qualify instrumentations.
There are 764 assemblies in the reactor vessel. The spent fuel storage pool presently contains 252 EOC-5 assemblies, 2,60 EOC-4 assemblies, 232 EOC-3 assemblies, 156 EOC-2 assemblies, and 168 EOC-1 assemblies. The present fuel pool capacity is 3,471 locations.
l Unit 2
~
Unit 2 was placed on administrative hold to resolve various TVA and NRC concerns. The unit was shut down for its fifth refueling outage on September 15, 1984, with a scheduled restart date of June 1, 1986. This refueling involves loading additional 8x8R (retrofit) assemblies into the core, finishing torus modification, turbine inspection, piping inspection TNI-2 modifications; postaccident sampling facility tie-ins, core spray change-out, and feedwater sparger inspection.
There were no assemblies in the reactor vessel. At month end, there were 277 new assemblies, 764 EOC-5 assemblies, 248 EOC-4 assemblies, 352 EOC-3 assemblies, 156 EOC-2 assemblies, and 132 EOC-1 assemblies in the spent fuel storage pool. The present available capacity of the spent fuel pool is 77 locations. All old racks have been removed from the pool and new HDRs are being installed.
e 2
5 SIGNIFICA!:T OPERATIONAL EVENTS OCTOBER 1985 1
Unit 1 10/01/85 0001 Unit remains on administrative hold to resolve various TVA and NRC concerns and end of cycle 6 refueling and modifications continues.
10/31/85 2400 Unit remains on administrative hold to resolve various TVA and NRC concerns and end of cycle 6 refueling and modifications continues.
w e
}
=a
=
e Revision o
u..
6 SIGNIFICANT OPERATIONAL EVENTS OCTOBER 1985 Unit 2 10/01/85 0001 Unit remains on administrative hold to resolve various.
TVA and NRC concerns and end of cycle 5 refueling and modifications continues.
10/31/85 2400 Unit remains on administrative hold to resolve various TVA and NRC concerns and end of cycle 5 refueling and modifications continues.
9
~
m Revision
(
h n
11
]
OPERATING DATA REPORT 50-259 DOCKET NO.
DATE 11/1/53 i
COMPLETED BY T. Thom T,ELEPHONE (205) 729-2509 OPERATING STATUS
- 1. Unit Name:
Browns Ferry One Notes
- 2. Reporting Period:
October 1985
- 3. Licensed Thermal Power (MWt):
3293 1152
- 4. Nameplate Rating (Gross MWe):
1065 S. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4 1065
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes O' cur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
c N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N /A.....
- 10. Reasons For Restrictions,If Any:
N/A
, This Month Yr to.Date Cumulative II. Hours In Reporting Period 745 7.296 98,696
- 12. Number Of Hours Reactor Was Critical 0.
1,647.78 59.521.38 0
512.22 6,997.44
- 13. Reactoe Reserve Shutdown Hours
- 14. Hours Generator On4.ine 0
1,626.67 58,267.26
- 15. Unit Reserve Shutdown Hours n
0 0
0
- 16. Gross Thermal Energy Generated (MWH).
4,950,821 168,066,787 1
- 17. Gross Electrical Energy Generated (MWH) 0 1,652,650 55,398,130
- 18. Net Electrical Energy Generated (MWH)
-7,531 1,552,365 53,766,186
[
0 22,3 59.0
- 19. Unit Service Factor
- 20. Unit Availability Factor 0
22.3 59.0
- 21. Unit Capacity Factor (Using MDC Net) 0 20.0 51.2
- 22. Unit Capacity Factor (Using DER Net) 0
,,,.2Q.0 51.2
- 23. Unit Forced Outage Rate
- 100
- 77.7.
- 27.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
P
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
9/14/86
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPERATION Revision (9/77) l
__q
i
..l 12 OPERATIAG DATA REPORT 50-260 DOCKET NO.
11-1-53 DATE COMPLETED BY T. Thom i
TELEPHONE 205/729-2509 OPERATING STATUS Notes Browns Ferry Two
- 1. Unit Name:
October 1985
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt): 1241 1152
- 4. Nameplate Rating (Gross MWe):
1065
- 5. Design Electrical Rating (Net MWe):
1098.4
- 6. Maximum Dependable Capacity (Gross MWe):
1065
- 7. Maximum Dependable Capacity (Net MWe):
8.'If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Repont, Give Reasons:
N/A
- 9. Power Level To which Restricted,If Any Net MWe):
N/A
/A
- 10. Reasons For Restrictions,If Any:
" This Month Yr.-to.Date Cumulative
~
~
745 7,296 93,583
~
f l1. Hours In Reporting Period 0.
0 55,860.03
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours o
n 1A ynn AA
, sa_aqn 16 14, Hours Generator On.Line 0
0 0
- 0 0
- 15. Unit Reserve Shutdown llours 0
0 153.245.167
- 16. Gross Thermal Energy Generated (MWH) 0 0
50,771,798
- 17. Gross Electrical Energy Generated (MWH)
-3,710
-27,910 49,275,063
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 0
0 58.1 0
0 58.1
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net).
0 0
"T9 4 0
0 49.4
- 22. Unit Capacity Factor (Using DER Net)
- 100
- 100
- 24.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.ind Duration of Each):
r,..
9
{
June 1, 1986
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior io Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIA L OPERATION
- Revision (9/77)
+,--er
50-259 UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO.
.i UNIT NAME nne
'l DATE 11-1_-RT October COMPLETED BY T.
Thom l
REFORT MONTH TELEPHONE (205) 729-2509 e.
E E
,.5_ ?
yD Licensee Eg K
Cause & Corrective No.
Date
[
3g
(
- g5 Event g,2
[3 a.
Action to H
$5 5
jgg Report a mV V
Prevent Recurrence d
11 315 10/1/85
- F 745
- F
- 4
- Administrative hold to resolve (Cont.)
various TVA and NRC concerns.
{*
~~
- l i
{'
l Z
4 I
4 I
t i
l I
I i
i 1
2 3
4 F: Forced Reason:
Method:
Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee
- Revision C-Refueling 3-Automatic Scram.
Event Repori(LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain) i Exlubit 1 - Same Source (9/77) li-Other (Explain)
=
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-260 UNIT NAME Brcuns_ Eerry Two DATE.U/1/85 COMPLETED BY T.
Thnm REPORT MONDI.Detaber_. -
TELEPHONE ?n;/790-9sno I
l
-_E E
3g 3
j EE Licensee h
ge,,
Cause & Corrective i
No.
Date g
3g
(
,5 g 5 Event g?
93 Action to i
f:
E j@g Report =
mO H
}O Prevent Recurrence 6.
305 10 /1/85
- F 720'
- F
- 4
- Administrative hold to resolve (Cont)
TVA and NRC concerns.
k 1
'e e
I 2
3 4
F: Forced Reason:
Method:
Exhibit C-Instructions S: Scheduled A Fquipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance ci Test 2-Manual Scram.
Entry Sheets for Licensee
- Revision C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrati'.c
' 5 G-Operational Error (Explam) 1 Exhibit I - Same Source 19/77)
Il-Other (Explain)