1 Operations Summary September 1985 The following summary describes the significant operation activities during the reporting period. In support of this summary, a chronological log of significant events is included in this report.
There were six reportable occurrences and no revisions to previous occurrences reported to NRC during the month of September.
Unit 1 TheunitwasincoldshutdowntheentiremEn'thasitundergoesseveral
~
modifications including those necess,ary to bring it into compliance with environmental qualification required under NURRG 0588.
1 Unit 2 The unit was in cold shutdown the entire month. On September 3, 1985, the unit was placed on administrative hold to resolve TVA and NRC concerns.
Unit 3 The unit was in cold shutdown the entire month on administrative hold to resolve various TVA and NRC concerns.
1 Prepared principally by B. L. Porter, e
Revision l
8609100333 060006 PDR ADOCK 05000259 R
3
~
Refuelina Information SEPTEMBER 1985 Unit 1 The unit was shut down on Narch 19, 1985, and remains in cold shutdown because of unfinished modifications to meet environmental concerns. The unit began its sixth refueling on June 1, 1985. This refueling will involve loading 8x8E (retrofit) fuel assemblies into the corv, replacing recirculation piping work on "A" and "B" low-pressure turbine, upgrade hangers and anchors, and environmentally qualify instrumentations.
There are 764 assemblies in the reactor vessel. The spent fuel storage pool presently contains 252 EOC-5 assemblies, 260 IOC-4 assemblies, 232 EOC-3 assemblies, 156 EOC-2 assemblies, and 168 EOC-1 assemblies. The present fuel pool capacity is 3,471 locations.
Unit 2
"~
~
Unit 2 was placed on administrative hold to r'esolve various TVA and NBC concerns. The unit was shut down for its fifth refueling outage on September 15, 1984, with a scheduled restart date of January 22, 1986.. This refueling involves loading additional 828E (retrofit) assemblies into the core, finishing torus modification, turbine inspection, piping inspection, TNI-2 modifications; postaccident sampling facility tie-ins, core spray change-out, and feedwater sparger inspection.
There were no assemblies in the reactor vessel. At month end, there were 273 new assemblies, 764 EOC-5 assemblies, 248 E0C-4 assemblies, 352 EOC-3 assemblies, 156 EOC-2 assemblies, and 132 ROC-1 assemblies in the spent fuel storage pool. The present available capacity of the spent fuel pool is 77 locations. All old racks have been removed from the pool and new HDEs are being installed.
f.
e s
Revision 6
5 SIGNIFICANT OPERATIONAL EVENTS SEPTEMBER 1985 Unit 1 09/01/85 0001 Unit remains on administrative hold to resolve various IVA and NRC concerns and end of cycle 6 refueling and modifications continues.
09/30/85 2400 Unit remains on administrative hold to resolve various TVA and NRC concerns and and of cycle 6 refueling and modifications continues.
e Revision A
6 SIGNIFICANT OPERATIONAL EVENTS SEPTENBER 1985 Unit 2 09/01/85 0001 End of cycle 5 refuel and modifications outage continues.
09/03/85 1500 Unit was placed on administrative hold until various TVA and NRC concerns are resolved.
03/30/85 2400 Unit remains on administrative hold to resolve various TVA and NRC concerns and end of cycle 5 refueling continues.
M O
g Revision A._h.--
e 4
11' OPERATING DATA REPORT DOCKET NO. 50-259 DATE 10 /1/85 COMPLETED BY T. Thorn TELEPHONE (200 729-2509 OPERATING STATUS I. Unit Name:
Browns Ferry One Notes
- 2. Reporting Period:
September 1985
- 3. Licensed Thennal Power (MWt):
3293 1152
- 4. Nameplate Rating (Gross MWe):
1065
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): - 1098.4 1065
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. lf Any (Net MWe):
N/A.
- 10. Reasons For Restrictions,If Any:
N/A
, 11is Month Yr.-to Date Cumulative II. Hours In Reporting Period 720 6,551 97.951
- 12. Number Of Hours Reactor Was Critical 0
1,647.78 59,521.38 0
512.22 _
_ _6_,997.44
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line 0
1,626.67 5B,267.26
- 15. Unit Reserve Shutdown Hours n
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 4,950,821 168,066,787
- 17. Gross Electrical Energy Generated (MWH) 0 1,652,650 55,398,130
- 18. Net Electrical Energy Generated (MWH)
-7,829 1,559,896 _ 53,773,717 0
24.8 59.5
[
- 19. Unit Service Factor
- 20. Unit Availability Factor 0
'24.8 59.5
~
- 21. Unit Capacity Factor (Using MDC Net) 0 22.4 51.5
- 22. Unit Capacity Factor (Using DER Net) 0
? ?te 51.5
- 100
- 75.2
- 26.5
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
9/14/86
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achioed INITIA L CRITICALITY
- Revision l
INITIAL ELECTRICITY COMMERCIA L OPERATION i
~
(9/77)
~
r--em
-e--
--T"h-w-
Tefr--
r
'- un v r
w-H
' ' 'T T-
12 l
OPERATING DATA REPORT 50-260 DOCKET NO.
DATE 10 /1/M COMPLETED BY T-Th -
TELEPHONE 205/729-2509 OPERATING STATUS
- 1. Unit Name:
Browns Ferry Two Notes
- 2. Reporting Period: _Sentember 1985
- 3. Licensed Thermal Power (MWt):
3293 1152
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
1065 1098.4
- 6. Maximum Dependable Capacity (Gross MWe):
1065
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report Give Reasons:
N/A
-N/A---
- 9. Power Level To Which Restricted,If An (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr.-to-Date Cumulative 720 6551 92.838 i1. Hours in Reporting Period 0
0 55,860.03
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdoh Hours 0
0 14,200.44 U
U
- 14. Hours Generator On-Line 54,338.36
- 15. Unit Reserse Shutdown flours 0
0 0
0 0
153,245,167
- 16. Gross Thermal Energy Generated (MWil) 0 0
50,771,798
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
-4,196
-24,200 49,278,773
- 19. Unit Service Factor 0
0 58.5 0
0 58.5
- 20. Unit Asailability Factor
- 21. Unit Capacity Factor (Using MDC Net) 0 0
49.8 0
0 49.8
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 100.0
- 100.0
- 23.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type, Date,and Duration of Lach):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: April 1, 1986
- 26. Units In Te.t Status IPrior to Commercial Operation):
Forecast Achiesed INITI \\L CRITICALITY INITIAL ELECTRICITY COMMERCl % L OPER ATION O Revision (9/77) 5
i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. Sn-no UNIT NAME n-~--
w---
N e DATE i5 4 55 REPORT MONTH September COMPLETED BY T-Thn TELEPHONE (205) 729-2509 I
w.
E c
.5 ?
3 y YIi Licensee
[*,
{*3 L
Cause & Corrective No-DJte i
3g d,4 2s5 Event g7 gO Action to j~
H 5 ;p, =!
Report a mO Prevent Recurrence o
4 O
6 3
315 9/1/85 uy 720
- F
- 4
- Administrative hold to resolve (Cont. >
TVA and NRC concerns, i
,.a i
b 8,
a
-l i
i
?
a s
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions J
S: Scheduled A Equipment FailureIExplain) 1-Manual for Preparation of Data d
IbMaintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG.
- Revision D-Regulatory Restriction, 4-Other ( Explain) 0161)
E. Operator Training & License Examination F-Administrative 5
G Operational E ror (Explain)
Exhibit 1 - Same Source (9/77) ll-Other ( Explain)
I
DOCKET NO.
50-260 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Browns Ferry Two l
DATE 10/1/85 I
COMPLETED BY T.
Thne REPORT MONTit Septa =her TELEPHONE 9nci17?o_9sno s
i :
i 1
_c
,j g 3
_* E3 Licensee
[%
g *'l, Cause & Corrective No.
Date i
3s 5
2s5 Event g
gO8 Action to f:
E j ig g Report =
to V Prevent Recurrence I-g eo i
e 305 9/1/85
- F 720~
- F
- 4 4 Administrative hold to resolve (Cont)
TVA and NRC concerns.
s U
i I
l i
i.
l i
1 1
i i
2 3
4 F: Forced Reason:
Method:
Exhibit G -Instructions S Scheduled A Equipinent Failure (Explain) 1-Manual for Preparation of Data li Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee o Revision C. Refueling 3-Automatic Scram.
Event Report (LER) File tNUREG-D Regulatory Restriction 4-Other ( Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G-Operatio'nal Eiror iExplain)
Exhibit I - Same Source (9/77) ll-Other (Explain t