1 Operations Susunary August 1985 The following sununary describes the significant operation activities during the reporting period.

In support of this summary, a chronological los of significant events is included in this report.

There were twelve reportable occurrences and no revisions to previous occurrences reported '.o NRC during the month of August.

Unit 1 The unit was in cold shutdown t.he entire ~ mon't$ as it undergoes seversi modifications including those necessary to bring it into compliance with environmental qualifications required *under NURIG 0588.

~

Unit 2 The unit was in cold shutdown the entire month for the unit's end-of-cycle 5 refueling outage.

Unit 3 The unit was in cold shutdown the entire month on administrative hold to resolve various TVA and NRC concerns.

Prepared principally by B. L. Porter.

Revision 0609100330 060006 PDR ADOCK 05000259 R

PDR

=

UNIT SHUTIM)WNS AND POWER REDUCTIONS DOCKET NO.

50-259 UIWT NAME Brm.ma Ferry he DATE Ali/R%

July 1985 COMPLETED BY T'. h om REPORT MN TELEPHONE (205)'729-2901 i

!l n.

2

~

a,

.a

=

f 5 'A Licensee Eg j*?

iE Cause & Corrective

=

N...

Date i

3E

(

jg5 Event u?

e.-

Action to 5:

E 5 5, =t Report =

'E 0 5'

Prevent Recurrence a

u 6

315 7/1/95

  • F 744'
  • F
  • 4
  • Administrative hold to resolve (Cont.

I TVA and NRC concerns.

w

. s.

l.

1, I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Eqmpment Failure (Esplain) 1-Manual for Preparation of Data N-Maintenance of Test 2-Manual Scram.

En ry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Repori t LER) File iNUREG-D-Regulatory Restriction 4-Ot her ( Explain) 0161)

E-Operator Training & License Examination oRevision F-Administrati.e 5

G-Operational b ror iExplain)

Exhibit I - Same Source 49/77)

Il-Other (Esplain)

3 Refueling Information AUGUST 1985 Unit 1 The unit was shut down on March 19, 1985, and~ remains in cold shutdown because of unfinished modifications to meet environmental concerns. The unit began its sixth refueling on June 1, 1985. This refueling will involve loading 8x8R (retrofit) fuel assemblies into the core, replacing recirculation piping work on "A" and "B" low-pressure turbine, upgrade hangers and anchors, and environmentally qualify instrumentations.

There are 764 assemblies in the reactor vessel. The spent fuel storage pool presently contains 252 EOC-5 assemblies, 260 EOC-4 assemblies. 232 EOC-3 assemblies, 156 EOC-2 assemblies, and 168 EOC-1 assemblies. The present fuel pool capacity is 3,471 locations.

Unit 2

'~

~

Unit 2 was shut down for its fifth refueling outage on September 15, 1984, with a scheduled restart date of December 15, 1985. This refueling outage will involve loading additional 8x8R (retrofit) assemblies into the core, finishin's,

torus modification, turbine inspection, piping inspection, TNI-2 modifications; postaccident sampling facility tie-ins, core spray change-out, and feedwater sparger inspection.

There were no assemblies in the reactor vessel. At month end, there were 273 new assemblies, 764 EOC-5 assemblies 248 EOC-4 assemblies, 352 EOC-3 assemblies, 156 EOC-2 assemblies, and 132 ROC-1 assemblies in the spent fuel storage pool. The present available capacity of the spent fuel pool is 77 locations. All old racks have been removed from the pool and new HDRs are being installed.

~

Revision f

5 SIGNIFICANT OPERATIONAL EVENTS AUGUST 1985 Unit 1 08/01/85 0001 Unit remains on administrative hold to resolve various TVA and NRC concerns and end of cycle 6 refueling and modifications continues.

08/31/85 2400 Unit remains on administrative hold to resolve various TVA and NRC concerns and end of cycle 6 refueling and modifications continues.

O w

1 e

w

'5 Revision l

---r

_,m r~~-,

,m

11' OPERATING DATA REPORT DOCKET NO. sn_?so DATE 9-1-85 COMPLETED BY T. Thom TELEPHONE 205/729-2509 OPERATING STATUS Notes I. Unit Name:

Browns Ferry One

2. Reporting Period:

August 1985

3. Licensed Thermal Power (MWt):

3293 1152

4. Nameplate Rating (Gross MWe):

1065

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 1098.4 1065
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport. Give Reasons:

N/A

9. Power Level To Which Restricted. if Any (Net MWe):

N /_A..,.

10. Reasons For Restrictions. If Any:

N/A This Month Yr to Date Cumulative 744 5,831 97,231

11. Hours In Reporting Period 0

1,647.78 59,521.38

12. Number Of Hours Reactor Was Critical 0

512.22 6,997.44

13. Reactor Reserve Shutdown Hours 0

1,626.67 58,267.26

14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours n

0 0

16. Gross Thermal Energy Generated (MWH) 0 4.950,821 168,066,787 0

1,652,650 55,398,130

17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)

-7.471 1.567.725 53.781,546 0

27.9 59.9

19. Unit Service Factor
20. Unit Availability Factor 0
  • 27.9 59.9
21. Unit Capacity Factor (Using MDC Net) 0 25.2 51.9_
22. Unit Capacity Factor (Using DER Net) 0 J_ 5d 51.9
23. Unit Forced Outage Rate
  • tnn
  • J 2.1
  • 25.8

/

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

9/14/86

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achioed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION

  • Revision gg7)

L --

6 1

UNITSHUTIM)WNS AND POWER REDUCTIONS DOCKET NO.

50-259 UNIT NAME Browns Ferry DATE 0-1-M REPORT MONTH - August COMPLETED BY r-El.EPHONE (205) 729-2309 l

s

.3?

Yk Licensee

[g Cause & Corrective Na-Date i

3?

2sE Event u7 9.?

Action to 5E 5

5 ;g =

Report =

<$ U 5'

Prevent Recurrence g

u o

315 8/1/85

  • F 744
  • F
  • 4 S

Administrative hold to resolve TVA and NRC concerns.

5 t,

.)

I 2

3 4

F: Foseed Reason:

Method:

Exhibit G-Instructions S: Scheduled A Equipment Failure (Esplain) 1-Manual for Preparation of Data It Maintenance ci Test 2-Manual Scram.

Entry Sheets for Licensee C-Retueling 3-Automatic Scram.

Event Report iLER) File (NUREG-D-Reeulatory Restriction 4 Osher (Explain) 016I)

E-Operator Training 1 Luense Exanunation F-Adtrunistrati*.e 5

Goperatidnal Lirar iExplain)

Exhibit I - Same Source t'8/77) llother (E5F ami l