Text
-
-
'( ct?
,
NOV 101986
Docket No. 50-412
Duquesne Light Company
ATTN:
Mr. J. J. Carey,
Senior Vice President
-
Nuclear Group
Post Office Box 4
Shippingport, Pennsylvania
15077
Gentlemen:
Subject:
Inspection 50-412/86-31
This refers to the routine resident safety inspection by Mr. J. Beall, and
Ms. A. Asars on October 4 - November 2, 1986, at the Beaver Valley Power Station,
Unit 2, Shippingport, Pennsylvania.
The inspection consisted of document reviews,
interviews and observation of construction and preoperational test activities.
The findings were discussed with Mr. R. Swiderski of your staff.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter.
Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspectors.
Based on the results of this inspection, it appears-that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation enclosed herewith as Appendix A.
The violation has been cate-
gorized by severity level in accordance with the " General Statement of Policy and
Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985).
You are
required to respond to the enclosed Notice, and in preparing your response, you
should follow the instructions specified therein.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation is appreciated.
Sincerely,
Originnl 1:tcr od 27:
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report 50-412/86-31
ggi j
k2
j
0
.
_ _ _ _ - _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ - _ - _ _
_ - _ _ _ _ _ _ _ - _ _ _ - _ _
__-___ - - -
o;
'
, _ g
Duquesne Light Company
2
NOV 191986
cc w/encls:
E. J. Woolever, Vice President, Nuclear Construction Division
C. E. Ewing, Quality Assurance Manager
R. J. Swidarski, Manager, Startup Group
P. RaySircar, Stone and Webster Engineering Corporation
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encls:
Region I Docket Room (with concurrences)
s
Management Assistant, DRMA (w/o encls)
DRP Section Chief
A. Cerne, SRI, Seabrook
W. Troskoski, SRI, BV-1
T. Martin, DRSS
S. Ebneter, DRS
P. Tam, LPM, NRR
Robert J. Bores, DRSS
,
I
.
8
F :$P
F.
P
F
l
),b.BEp/neo
/j r pp
zi ger
6
p(,29 pe
imuni
Yl/12/86
1[
//
II'
0FFICIA R CORD COPY
_
_ - - - - - - - - _ - - - _ - - - - - -