Forwards Enforcement Conference Insp Rept 50-219/86-12 & Notice of Violation
ML20214F927
Person / Time
Site: Oyster Creek
Issue date: 11/17/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20214F928 List:
References
NUDOCS 8611250484
Download: ML20214F927 (2)


See also: IR 05000219/1986012

Text

{{#Wiki_filter:r . . NOV 171986 Docket No. 50-219 GPU Nuclear Corporation ATTN: Mr. P. R. Clark President 1 Upper Pond Road Parsippany, New Jersey 08731 Gentlemen: Subject: Enforcement Conference for Inspection 50-219/86-12 . This letter refers to the enforcement conference held on September 12, 1986, in the Region I office to discuss the findings addressed in NRC Region I Inspection 50-219/86-12 regarding the inoperability for one operating cycle at Oyster Creek of four snubbers whose operability is required by your Technical Specifications. Conference details are described in the report enclosed with this letter. Based on results of findings during Inspection No. 50-219/86-12 conducted on April 14 - June 1,1986 and considering additional information presented during this meeting, it appears that two of your activities were not conducted in full compliance with NRC requirements. These apparent violations of requirements are cited in Appendix A and categorized at Severity Level IV in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions", 10 CFR 2, Appendix C (1986). A reply is required and should be prepared in accordance with Appendix A. With regard to item A, we note that this violation has been corrected, and therefore no response to this item is required. One of the violations involved the inoperability of four snubbers on the Isola- tion Condenser System in that the pipe lugs were not welded to the clamps, as required. Although subsequent pipe stress calculations verified that the oper- ability of the isolation condenser piping was not affected by the missing welds, we are concerned that this error was not detected by the contractor performing and controlling the work activity, and your Quality Assurance program was not effective in assessing the contractor's poor control of quality. Even though GPUN's inspections of the contractor's work indicated deficiencies existed in his control of quality, and in particular, the missing clamp-to-lug welds were specifically identified as a deficiency by a Plant Material Department engineer's inspection, GPUN failed to take action to assure the ultimate quality of work. This is considered a significant problem that merits your personal attention. 8611250484 861117 ~ PDR ADOCK 05000219 G PDR 0FFICIAL RECORD COPY 415BLOUGH11/5/86 - 0001.0.0 1 ' 2 F 3 3}l 11/07/86

. GPUN Nuclear Corporation 2 . Original Signed Byg' Enclosures: 1. Appendix A, Notice of Violations 2. NRC Region I Enforcement Conference Report _ cc w/ encl: M. Laggart, BWR Licensing Manager Licensing Manager, Oyster Creek Public Document Room (PDR) Local Public Document Room (LPDR) Nuclear Safety Information Center (NSIC) NRC Resident Inspector State of New Jersey bec w/ encl: Region I Docket Room (with concurrences) Management Assistant, DRMA (w/o encl) Section Chief, DRP Robert J. Bores, DRSS I 4 !

! QW f ' I f RI:DRP RI:DRP I. RP RI: S Sft:01fS' 3If63P g gN N Bateman Blough Kister Holody Y hane ( 5 i aa Durr kle% l 10/9/86 10/9/86 1l/]/86 10/iO/86 Id/ /86 19/G/86h 'k ! [["^C# OFFICIAL RECORD COPY 415BLOUGH115/86 - 0002.0.0 j j ' c% 10/23/8 i ^J r r II / C f( a a . - - - }}