e APPENDIX A NOTICE OF VIOLATION Power Authority of the State of New York Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant License No. DPR-59 As a result of the inspection conducted on March 30 - April 3,1987, and in accordance with the " General Statement of Policy and Procedure for NRC Enforce ment Actions," 10 CFR Part 2, Appendix C (Enforcement Policy) (1986), the following violations were identified:

A. 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, states in part,

" Measures shall be established to assure that conditions adverse to quality, such as... defective material and equipment...are promptly identified and corrected. In the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition...the cause of the condition, and the corresponding action taken shall be documented...." The licensee's Quality Assurance Procedure 16-1, Corrective Action Control-Plant, Revision 2, requires the nonconformances which are identified by inspection be documented on a Nonconformance and Corrective Action (NCA) form or a Deficiency and Corrective Action Report (DCAR) form.

Contrary to the above, as of April 3,1987, neither an NCA nor DCAR form had been initiated to document the cause and corrective action associated with defective material and equipment caused by significant pitting of the internal surfaces of the three inch carbon steel piping connected to the inlet and outlet sides of Core Spray System Valves 14-M0V-5A and SB and which exceeded the ANSI B31.1 allowable tolerance of 12.5% for surface imperfections.

This is a Severity Level IV violation. (Supplement I)

B. Technical Specification 6.8(A), states in part, " Written procedures...

shall be established and implemented...that meet or exceed the require-ments and recommendations of... Appendix A of Regulatory Guide 1.33, November 1972." Appendix A, paragraphs I.5 and H, (of RG 1.33) require procedures for modification work and for measuring and test equipment control.

1. Licensee Procedure No. 10, Engineering and Change Requests (ECR),

Revision 3, requires that Quality Assurance / Quality Control (QA/QC) review and concur with an ECR that affects a QA requirement or revises a QC inspection requirement.

8705210591 PDR 870512 G ADOCK 05000333 PDR

e O-2 Appendix A Contrary. to the above,' as of' April 3,1987:

ECR No. 5 to Modification FI-82-33, dated January 29, 1985, that-added.-QC inspection requirements for penetrant testing and post weld heat treating was not reviewed and concurred to by QA/QC.

ECRLNo. 17 to Modification FI-82-33, dated March 26, 1985, that added- QC inspection requirements for visual examination and-penetrant testing of socket welds, was not reviewed and concurred to by QA/QC.

ECR - No. 3 and 6 to Modification FI-85-09, dated February 20, 1987, that added QC inspection requirements for the removal and installation of a piping section -in the "A" Core Spray minimum flow line, was not reviewed or concurred to by QA/QC.

2. Licensee Administrative Procedure No. 4.2, Control of Measuring and Test Equipment, Revision 2, requires each test instrument to have a log (card) recording when and where that instrument was used and the initials of the user.

Contrary to the above, as of April 3,1987, the following instrument usages were not recorded on the respective logs for:

Biddle Megger E-817, used for measurements (PMWR 0730, January 18,1987) on .the QA Category IEH Reactor Core Isolation Cooling System inboard Steam Isolation Valve (13M0V-15) Motor.

Biddle' Megger E-817 and Fluke Multimeter E-808, used to perform measurements (WR-033055, October 2, 1986) on QA Category 1EH High Pressure Coolant Injection System inboard Containment Isolation Valve (23M0V-15) Motor.

This is a Severity Level V violation. (Supplement I)

Pursuant to the provisions of 10 CFR 2.201, the Power Authority of the State of New York is hereby required to submit to this office within thirty-days of the date of the letter which transmitted this Notice, a written statement or explanation in reply, including: (1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending this response time.