Forwards Amends 104 & 94 to Licenses DPR-39 & DPR-48, Respectively & Safety Evaluation.Amends Permit one-time Extension of Outage Time on Diesel Generator 0 for Unit 2 Spring 1987 Refueling Outage Maint & Mod Per 10CFR50,App R
ML20213G573
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/08/1987
From: Norris J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20213G575 List:
References
NUDOCS 8705180351
Download: ML20213G573 (2)


Text

_ _ _ . . ... - __ - - __ - _- . _ . - , - .-

May 8, 1987 -

. y Docket Nos. 50-295 DISTRIBUTION and 50-304 fusertv rvie) NRC PDR' Local PDR

PD3-2 Rdg. T. Novak C. Vogan J. Norris OGC L. Harmon i Mr. D. L. Farrar E. Jordan B. Grimes J. Partlow Director of Nuclear Licensing T.Barnhart-(8) W. Jones E. Butcher Commonwealth Edison Company N. Thompson ACRS(10) OPA
Post Office Box 767 LFNB t- Chicago, Illinois 60690

Dear Mr. Farrar:

I The Conslission has issued the enclosed Amendment No.104to Facility Operating License No. DPR-39 and Amendment No. 94 to Facility Operating License No.

DPR-48 for the Zion Nuclear Power Station, Unit Nos. 1 and 2, respectively.

The amendments consist of changes to the Technical Specifications in response

( to your application transmitted by letter dated February 10, 1987.

1 4

These amendments would permit a one-time change that will extend the allowable j outage time on the "0" diesel generator from 7 days to 21 days for the Spring

-1987 Unit 2 refueling outage. This extended outage period is required to '

complete required' modifications to comply with Appendix R to 10 CFR 50 and perfonn an extensive refueling outage maintenance program.

A copy of the related Safety Evaluation is enclosed. A Nntice of Issuance will ,

j- be included in the Commission's next regular bi-weekly Federal Register notice.

Sincerely, j Original signed by/

Jan A. Norris, Senior Project Manager

Project Directorate III-2 i Division of Reactor Projects - III, IV, i V and Special Projects 1

Enclosures:

i 1. Amendment No.104 to DPR-39

2. Amendment No. 94 to DPR-48 s
3. Safety Evaluation'
  • i- cc: w/ enclosures

, See next page

  • See previous concurrence

! LA:PD III-2 PM:PD III-2 JNorris:*pds OGC PD 4-2 CVogan* MKarman* det i

3/24/87 3/24/87 3/24/87 ~

f/87 i

l 8705180351 870508 PDR ADOCK 05000295 P PDR 4

1

Mr. D. L. Farrar Commonwealth Edison Company Zion Station CC:

Robert J. Vollen, Esquire- Mr. Michael C. Parker, Chief 109 hurth Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, Sth Floor Director of Research and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Mr. P. Steptoe Isham, Lincoln and Beale Counselors at Law ,

Three First National Plaza 51st Floor Chicago, Illinois 60602 Mayor of Zion l Zion. Illinois 60099 Illinois Department of Nuclear Safety

[

ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive 5th Floor Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illincis 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

-