Forwards Safety Insp Rept 50-293/86-21 on 860602-0707 & Notice of Violation.Requests Schedule for Completion of Evaluations & Corrective Actions Re Listed Deficiencies, Including Extent of Fire Brigade Training
ML20212P950
Person / Time
Site: Pilgrim
Issue date: 08/25/1986
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lydon J
BOSTON EDISON CO.
Shared Package
ML20212P953 List:
References
NUDOCS 8609030346
Download: ML20212P950 (2)


See also: IR 05000293/1986021

Text

m

D

. ' ,

,

.'

AUG 25198g

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. J. Lydon

Chief Operating Officer

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection Report No. 50-293/86-21

This refers to the routine safety inspection (50-293/86-21) conducted by

Dr. M. McBride and others of this office during the period June 2, 1986 to

July 7, 1986 at the Pilgrim Nuclear Power Station, Plymouth, Massachusetts.

Areas examined during this inspection are described in the NRC Region I In-

spection Report which is enclosed with this letter. Within these areas, the

. inspection consisted of selective examinations of procedures and records, in-

terviews with personnel, and observations by the inspector.

We are concerned about several deficiencies that are identified in the enclosed

report. These include (1) the recurring failure of the recirculation motor

generator set field breaker used for anticipated transient without scram pro-

tection, (2) the apparent failure to properly schedule required surveillance

tests, (3) the completeness and technical adequacy of logic functional sur-

veillance tests, (4) excessive leakage pest primary containment isolation valves

in excess of established criteria, and (5) the extent of fire brigade training

at the station. We believe that these issues are important and we plan to re-

view them prior to startup.

Please submit, within thirty days, a schedule for

the completion of your evaluations and corrective actions with regard to these

five items so that we can complete our reviews in a timely manner.

Also, based on the results of this inspection, it appears that one of your

activities concerning safety related battery testing was not conducted in full

compliance with NRC requirements, as set forth in the Notice of Violation, en-

closed herewith as Appendix A.

This violation has been categorized by severity

l

level in accordance with the General Statement of Policy and Procedure for NRC

Enforcement Actions,10 CFR Part 2, Appendix C (Enforcement Policy 1986). You

are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

OFFICIAL RECORD COPY

IR PILGRIM 86-21 - 0001.0.0

08/21/86 lEDI

B609030346 860825

1

'

{DR

ADOCK 05000293

PDR

r

l

r

>

,

Boston Edison Company M/C Nuclear

2

'

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By

William F. Kane, Director

Division of Reactor Projects

Enclosures:

1.

Appendix A. Notice of Violation

2.

NRC Region I Inspection Report No. 50-293/86-21

cc e/encls:

L. Oxsen, Vice President, Nuclear Operations

A. Pederson, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

Chairman, Board of Selectmen

J. D. Keyes

.

Plymouth Civil Defense Director

Senator Edward P. Kirby

The Honorable E. J. Markey

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

DRP Section Chief

W. Raymond, SRI, Vermont Yankee

T. Shedlosky, SRI, Millstone 1&2

H. Eichenholz, SRI, Yankee

P. Leech, LPM, NRR

L. Doerflein, RI

R. Fuhrmeister, RI

,Mol

M.MM %

l

'R :DRP

RI:DRP

P

J:, ^ "- ' ' tiA V t~-

McBride/mjd

Strosnider

Kister

8/N/86

8/tt{/86

8/[ 86

8/ /86

0FFICIAL RECORD COPY

IR PILGRIM 86-21 - 0002.0.0

08/14/86

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _