Forwards Operations,Const & Comanche Peak Response Team Activities Insp Repts 50-445/86-01 & 50-446/86-01 on 851101-860131 & Notices of Violation & Deviation
ML20212P742
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/29/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20212P745 List:
References
NUDOCS 8609030257
Download: ML20212P742 (3)


See also: IR 05000445/1986001

Text

. , . - -

'

In Reply Refer To:

Dockets: 50-445/86-01

50-446/86-01 g

Texas Utilities Generating Company

ATTN: Mr. W. G. Counsil

Executive Vice President

~400 North Olive,'L.B. 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. T. F. Westerman and other

members of the Region IV Comanche Peak group during the period November 1,

1985, through January 31, 1986, of activities covered by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,

Units 1 and 2, and to the respective discussions of our findings with

Messrs. A. B. Scott, R. E. Camp, and J. T. Merritt, and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included operations, construction, and

Comanche Peak Response Team activities. Within these areas, the inspection

consisted of selective examination of procedures and represeritative records,

interviews with personnel, and observations by the inspectors. The inspection

findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to.

these violations, in writing, in accordance with the provisions of

Section 2.201' of the NRC's " Rules of Practice," Part 2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

Also during this inspection, it was iuund tiial certelli of your' aut-ivities

appeared to deviate from commitments made to the NFC. These items and

references to-the commitments are identified in the enclosed Notice of

' Deviation.>,You are requested.to respond to these deviations in writing. Your

response should be based on the specifics contained in the Notice of Deviation

enclosed with this-letter.

^

Six unresolved items are identified as follows in the enclosed inspection

'

"

reporti Appendix C, paragraphs ~3, 4.a, 5.b, and 5.d; Appendix E,

paragraphs 9.g and 9.1.

.

!RIV:RSB/C

. : . ..

RRI 7fM CPRT g CPG Y

Ac g

EU F DRSP NRR 1 ja h u~

i ' DLKelley HSPhillips 'IBarnes TfWesterman MEEmerson EHJo nson Noonan fFf

'

6 / 9 /86 8 //Y/86- 8 / %/86 W/p/86 ( /97/86 y Q /86 fM/86v'qf

"

8609030257 860829

PDR ADOCK 05000445

Of

o eDR

g

-

.- _ _ - _ _ _ - - _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _

-Texas Utilities Generating Company -2-

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of Appendix C, paragraph 2 of Appendix D, and paragraph 3 of

. Appendix E of the enclosed report.

The responses directed by this letter and the accompanying Notices are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

p discuss them with you.

(

'X Sincerely,

ogn9 Cgf3 B'1

r, i1 ,hhN'n

E. H. Johnson, Director

Division of Reactor. Safety

, and Projects

Enclosures:

1. Appendix A - Notice of Violation

2. . Appendix B - Notice of Deviation e

3. Appendix C - NRC Operations Inspection Report -

50-445/86-01 - -

4. Appendix D - NRC Construction Inspection Report >

50-445/86-01

50-446/86-01 ,

'

5. Appendix E - NRC Comanche Peak Response, Team- -- - .-

Activities Inspection Report

50-445/86-01 ' ~

~

50-446/86-01 .

cc w/ enclosures:

Texas Utilities Electric Company

ATTN: G. S. Keeley, Manager

Licensing

Skyway Tower

400 North Olive Street

' Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

t

- . .

. ._ _ _ _ _ _ _ _ _

______________________j

,

Texas Utilities Generating Compary -3-

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548

Austin, Texas 76711

Administrative Judge Peter Bloch

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Oak Ridge, Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

881 Outer Drive

Oak Ridge, Tennessee 37830

4

Texas Radiation Control Program Director

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB * MIS System
  • RRI-0PS *RSTS Operator
  • RRI-CONST *R&SPB
  • T. F. Westerman, CPTG DRSP

V. Noonan, NRR R. Martin, RA

S. Treby, ELD *RSB

  • RIV File J. Taylor, IE
  • D. Weiss,LFMB(AR-2015) R. Konklin, IE
  • w/766

i