ML20212P742
| ML20212P742 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/29/1986 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20212P745 | List: |
| References | |
| NUDOCS 8609030257 | |
| Download: ML20212P742 (3) | |
See also: IR 05000445/1986001
Text
. , . - -
'
In Reply Refer To:
Dockets:
50-445/86-01
50-446/86-01
g
Texas Utilities Generating Company
ATTN:
Mr. W. G. Counsil
Executive Vice President
~400 North Olive,'L.B. 81
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Mr. T. F. Westerman and other
members of the Region IV Comanche Peak group during the period November 1,
1985, through January 31, 1986, of activities covered by NRC Construction
Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric Station,
Units 1 and 2, and to the respective discussions of our findings with
Messrs. A. B. Scott, R. E. Camp, and J. T. Merritt, and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection included operations, construction, and
Comanche Peak Response Team activities. Within these areas, the inspection
consisted of selective examination of procedures and represeritative records,
interviews with personnel, and observations by the inspectors.
The inspection
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to.
these violations, in writing, in accordance with the provisions of
Section 2.201' of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Also during this inspection, it was iuund tiial certelli of your' aut-ivities
appeared to deviate from commitments made to the NFC.
These items and
references to-the commitments are identified in the enclosed Notice of
' Deviation.>,You are requested.to respond to these deviations in writing. Your
response should be based on the specifics contained in the Notice of Deviation
enclosed with this-letter.
^
Six unresolved items are identified as follows in the enclosed inspection
'
"
reporti Appendix C, paragraphs ~3, 4.a, 5.b, and 5.d; Appendix E,
paragraphs 9.g and 9.1.
1 ja h u~
Ac g
.
. : . ..
CPRT g CPG Y
EU F
DRSP
!RIV:RSB/C
RRI 7fM
i '
DLKelley
HSPhillips
'IBarnes
TfWesterman
MEEmerson EHJo nson Noonan Ff
f
6 / 9 /86
8 //Y/86-
8 / %/86
W/p/86
( /97/86 y Q /86 fM/86v'qf
'
Of
"
8609030257 860829
ADOCK 05000445
g
o
eDR
-
.-
_ _ - _
_ _ - - _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _
_
-Texas Utilities Generating Company
-2-
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of Appendix C, paragraph 2 of Appendix D, and paragraph 3 of
. Appendix E of the enclosed report.
The responses directed by this letter and the accompanying Notices are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
p
discuss them with you.
('X
Sincerely,
ogn9 Cgf3 B'1
r, i1 ,hhN'n
E. H. Johnson, Director
Division of Reactor. Safety
,
and Projects
Enclosures:
1.
Appendix A - Notice of Violation
2. . Appendix B - Notice of Deviation
e
3.
Appendix C - NRC Operations Inspection Report
-
50-445/86-01
-
-
4.
Appendix D - NRC Construction Inspection Report
>
50-445/86-01
50-446/86-01
,
5.
Appendix E - NRC Comanche Peak Response, Team-
'
--
- .-
Activities Inspection Report
50-445/86-01
' ~
50-446/86-01
~
.
cc w/ enclosures:
Texas Utilities Electric Company
ATTN:
G. S. Keeley, Manager
Licensing
Skyway Tower
400 North Olive Street
' Lock Box 81
Dallas, Texas
75201
Juanita Ellis
President - CASE
1426 South Polk Street
Dallas, Texas 75224
t
- .
.
.
._
_ _ _ _ _ _ _ _
______________________j
,
Texas Utilities Generating Compary
-3-
Renea Hicks
Assistant Attorney General
Environmental Protection Division
P. O. Box 12548
Administrative Judge Peter Bloch
U. S. Nuclear Regulatory Commission
Washington, D. C.
20555
Elizabeth B. Johnson
Administrative Judge
Oak Ridge National Laboratory
P. O. Box X, Building 3500
Oak Ridge, Tennessee 37830
Dr. Kenneth A. McCollom
1107 West Knapp
Stillwater, Oklahoma 74075
Dr. Walter H. Jordan
881 Outer Drive
Oak Ridge, Tennessee 37830
4
Texas Radiation Control Program Director
Texas Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
- MIS System
- RRI-0PS
- RSTS Operator
- RRI-CONST
- R&SPB
- T. F. Westerman, CPTG
DRSP
V. Noonan, NRR
R. Martin, RA
S. Treby, ELD
- RSB
- RIV File
J. Taylor, IE
- D. Weiss,LFMB(AR-2015)
R. Konklin, IE
- w/766
i
-
--
-
. - - -