Text
r
v
y ']
"4R 0 5 W.
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN: Mr. Warren P. Murphy
Vice President and Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection Report No. 50-271/87-02
This refers to the routine resident safety inspection conducted-by Mr. W. J. Raymond
of this office on January 5 - February 2, 1987, at the Vermont Yankee Nuclear Power
Station, Vernon, Vermont.
The inspection consisted of observation of activities,
interviews with personnel and document reviews.
The results of the inspection are
described in the NRC Region I Inspection Report enclosed with.this letter and were
discussed with Mr. J. P. Pelletier of your staff at the conclusion of the inspection.
Our inspector also reviewed your corrective actions taken in response to our letter
to you dated July 3, 1986 concerning the control of defective materials.
We have
no further questions regarding your actions at this time.
Additionally, on January 16, 1987, Mr. Raymond provided Mr. Pelletier a detailed
evaluation of licensee event report (LER) quality, Attachment II to the enclosed
inspection report, which was used as input to the Systematic Assessment of Licensee
Performance for Vermont Yankee for the period from October 1, 1985 to December 31,
1986.
The LER evaluation was made by the NRC using the basic methodology presented
in NUREG-1022, Supplement 2.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this
letter and the enclosure will be placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
Sincerely,
Original Signed Byi
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Inspection Report 50-271/87-02
0703130190 870305 ~
d; l
l
ADDCK 05000271
1l
G
.
.
.
.-.
.
_.
_-
. - - _ _ _ _
,g; ,
Vermont Yankee Nuclear Power
2
Corporation
AR 05 W
cc w/ encl:
Mr. R. W. Capstick, Licensing Engineer
Mr. J. Gary Weigand, President and Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. Donald Hunter, Vice President
n
Mr. Cort Richardson, Vermont Public' Interest Research Group, Inc.
"
Mr. Gerald Tarrant, Department of Public Service
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
' State of New Hampshire
State of Vermont
NRC Resident Inspector
bcc w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
DRP Branch Chief
M. McBride, SRI, Pilgrim
H. Eichenholz, SRI, Yankee
V. Rooney, LPM, NRR
Robert J. Bores, DRSS
/
D
RI:
R
P
Raymond/meo
Elsa er
z nger
2/27/87
2, 't.f $1
[$p
0FFICIAL RECORD COPY
.
. _ ____