Text
ca
-t
f-
AUG 2 3 606
Docket No. 50-461
Illinois Power Company
ATTN: Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. T. P. Gwynn
and others of this office on July 1-28, 1986, of activities at Clinton Power
Station authorized by NRC Construction Permit No. CPPR-137, and to the
discussion 'of our findings with Mr. D. P. Hall and others of your staff at
the conclusion of the inspection.
'
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
r
is required.
Certain other activities, set forth in Enclosure 2 to this letter, appear
to be a deviation from commitments contained in the Clinton Power Station
Final Safety Analysis Report.
Please advise us in writing within thirty
days of the date of this letter of the corrective cction you have taken or
,
plan to take, showing the estimted date of completion with regard to this
deviation.
Concerning the floodproofing of the Clinton Power Station screenhouse, we
are releasing this report at this time for your information. An Enforcement
Conference will be held on August 29, 1986, at 10:00 a.m. in the Region III
office, with you and other members of your staff.
You will be notified by
separate correspondence of our decision regarding enforcement action. No
written response is required concerning the floodproofing violation until
you are notified of the proposed enforcement action.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
<
Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
l
as required by the Paperwork Reduction Act of 1980, PL 96-511.
.
Q\\ \\ \\
B608280107 860822
ADOCK0500{gi
G
__
_
___ __.-_--
_ _ - - - _ _
i
Illinois. Power Company
2
AUG 2 21986
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
-
,
"Griginal $1gned by E.G. Gratran*
Charles E. Norelius, Director
Division of Reactor Projects
Enclosures:
1.
2.
Notice of Deviation
3.
Inspection Report
No. 50-461/86048(DRP)
cc w/ enclosures:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Richard Hubbard
Gary N. Wright, Manager
Nuclear Facility Safety
Mark Jason, Assistant
Attorney General,
Environmental Control Division
H. S. Taylor, Quality Assurance
Division
David Rosenblatt, Office of
Consumer Services
,
,
.
R I
R
- I
RII
RIII
RIII
RIII
-
hW
R
h ;' .
A
s
V
n mj
Snell V
daura
Wa
k
Gree man
TAbim
h
b
hN
%( L 2.-
-
.
.
.