TVA INPIAYEE CONCERNS REPORT NUMBER: II-85-100-001 SPECIAL PROGRAN REPORT TYPE: Welding Project REVISION NUMBER: 0 TITLE: Improperly Repaired Welds REASON POR RETISION: N/A SWEC
SUMMARY
STATEMENT: N/A PREPARATION PREPARED BY:
i Original Signed By R. M. Bateman 11-06-86 SIGNATURE DATE REVIEWS PEER:
Original Signed By J. E. Rose 11-06-86 SIGNATURE DATE f
TA
[ TECHNICAL REVIEW ONLY U
SIGNATURE DATE CONCURRENCES t
Original Signed By CEG-H: J. F. Lewis for LEM 11-25-86
/'/T-U SRP-4es44.
SIGNATURE DATE SIGNATURE
- DATE APPROVED BY-MUNA!-
l-M M MA ECS'P NANflER DATED MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)
(
- SRP Secretary's signature denotes SRP concurrences are in files.
Q12j0 5
7 P
c EMPLOYEE CONCERN SUPMARY SHEET Report Number:
XX-85-10(HX)1 Report
Title:
Improperly Repaired Welds I.
CONCERN CONSIDERED:
XX-85-100-OO1 II.
ISSUES INVOLVED Improper repair of welds at SQN.
8 III.
STATENENT ON CONCERN / ISSUE VALIDITY Validity:
Y
,N X, Substantiated: Y
,N X
l IV.
EFFECT ON HARDWARE AND/OR PROGRAN
~
N/A V.
JUSTIFICATION Objective evidence could not be obtained to substantiate this concern.
l VI.
RECOtHENDATION AND/OR CORRECTIVE ACTION NEEDED None i
i VII. REINSPECTION NEEDED:
Y
,N X
I Page a 3158T
Report Number: XX-85-100-001 VIII. ISSUE CLOSURE Close based on this report.
IX.
ATTACHMENTS A.
Approval sheet 1.
ERT Report XX-85-100-001 2.
Text of employee concern 3.
Summary of SQN specific employee concerns reviewed by WP 4.
Program summarization of weld project (WP) evaluation l
i ll Page ma 3158T
Attachment A WILDING PI3 JECT
'3 SON SPECIFIC BMPLOYEE CONCERNS DATE 11/6/86
SUBJECT:
SEQUOYAH SPECIFIC EMPLOYEE CONCERNS -
SUMMARY
OF WP ENGINEERING EVALUATION I
CONCERN CONSIDERED: II-85-100-001 l
ll[ h/Gb
, DNC, WP PREPAPED BY a
l REVIEwEoard,f-.
O E.
11/4/Ob
, DNC, WP I
uvIEno ar b.O [- 2 L
//4,/u
, oni, vP a
c I
oviEnoor A ~ s c A a,,4,/re u eom
. CEG-n, v.Iai.E b
!Ah[
/*f7
, Pr.Er. N...E.,
AePiOvEo or O
i i
i
'l
- d' 06470
WELDING PROJECT SQN SPECIFIC EMPLOYEE CONCERNS i
s ATTACHMENT 1 ERT REPORT II-85-100-001
.4 G
9
" pA 44 tbs-o4sl tomwes esi g-(
s' UNITED STATES COVERNMENT p
E einOTdn C,1478 TENNESSEE VALLEY AUTHORITY (
1 TO: H. L. Abercrombis, Site Director, Seguoyah Nuclear Plant FRON: K. W. Whitt, Director of Nuclear Safety Review staff E3A8 C-K MAR 0 61986 DATE
SUBJECT:
NUCLEAR SAFETY REVIEW STAFF INVESTIGATION REPORT '"RANSMITTAL Transmitted herein is Report No.
II-85-100-001 Subject Improperly Repaired Wolds Concern No.
KI-85-100-001
~~
No response or corrective action is required for this report.
It is being transmitted to you for information p6rposes only.
Should you have any questions, please contact W. D. Stevens at telephone 6231
)
Recommend Reportability Determination: Yes No I
[
' ' Director, NSRS/ Designee MAH:JTH mm a
nt):
W. C. Bibb, BFN E7*'
J. W. Conn, W9C135 C-K W. T. Cottle, WBN g0 James P. Darling, BLN s
R. P. Denise, LP6N40A-C j f G. B. Kirk, SQE
)(C 18 8' "'
F. E. Laurent, CEO-WBN D. R. Nichols, E10A14 C-K g
[ [ 3 e
QTC/ERT, Watts Bar Nuclear Plant h
g g3K p v Eric S11ger, LP6M48A-C J. H. Sullivan, SQN h
Kent Thorp, EG&G IOB-WBN Wut
' k 05155 Ruy l'.S. Savines Bonds Regularly on the Payroll Savines Plan
o
(
(
QUAUTY l
TECHNOLOGY j
QlC P.O. BOX 600 Sweetwater, TN 37874 (615)365 4414 ERT INVESTIGATION REPORT PAGE 1 OF 2 CONCERN NO. XX-85-100-001 CONCERN:
"An undetermined number of welds-may have been repaired improperly" l
INVESTIGATION PERFORMED BY:
William R. Pickering
~
t i
DETAILS 4
PERSONNEL CONTACTED: (CONFIDENTIAL)
DOCUMENTS REVIEWED:
Foreman's Weekly Time Cards
) SU:iMARY OF INVESTIGATION:
j s
This concern is not substantiated.
The investigation involved steamfitter personnel employed at the Sequoyah Nuclear. Plant during 1977-78.
FINDINGS:
An investigation at the Watts Bar Nuclear Plant (HI-85-013) substantiated an employee concern in which a
Steamfitter General Foreman had instructed steamfitter welders to repair welds contrary to requirements of the weld repair procedure.
The Steamfitter General Foreman was quoted as saying "that this (type of weld repair) was done a lot at SON, and we did not squeal on each other for doing it; we took care of one another."
This individual was employed at SON as a Steamfitter Foreman in 1977-78 cnd in 1979 he became a superintendent. Objective evidence could not be obtained that could identify individuals who may have been under the direction of the subject individual.
Interviews identified that the i
cubject individual was a-foreman of the -Hanger Fabrication Shop at SQN, i
- however, no one had direct knowledge of the content of his directions relative to improper weld repairs.
)
o
~
l
(.-
(
\\
ERT INVESTIGATION REPORT PAGE 2 OF 2 u*,bHCERN NO.
XX-85-100-001 DETAILS, continued CCSERVATION:
N ne I
CONCLUSION:
J This concern could not be substantiated.
Statements by the subject individual at Watts Bar indicates welds may have been improperly l
rcpaired at SQN.
However, sufficient evidence could not be obtained to cubstantiate the occurrence.
~
)
/8CJ N?Sb $
jf e
f if
.s as b
PREPARED BY:
tMA
- 27m, s. *F -N:,_
T DATE REVIEWED BY:
MT//h
' DATE 0
b
_ e-,-m
,,w -w a e,,
e ww, s
.m.
--,,,..m.-...
(
(
=qAL 4
REQUEST FOR REPORTABILITY EVALUATION
-)
1.
Request No. _ YY Ab100-not
_ _ _ _ _,,_ _ _ _ _ _ _, _ _ _ _ _ _ _)
(ID No.,
if reported (ERT Concern No.)
WgM g,,__- __ _
2.
Identificatson of Itom Involved _ (Nomenclature, system, manuf.,SN, Model, etc.)
3.
Description of Problem (Attach related documents,
- photos, sketches,etc.)
__A_n_ undetermin_ed number of (d_s__m_ay,,have been repaired improperly.
t 4.
Reason for Reportabilitys (Use supplemental sheets if necessary)
- u'*
..3=-
A.
This design or construction deficiency, were
-it to 'have remained uncorrected, could have affected adversely the safety
.i t any time throughout i
of operations of the nuclear power plant the expected lifetime of the plant.
No Y
Yes
.__ If Yes, Explain: _N/A i
y B.
This deficiency reprairments a sinnificant breakdown in any portion of the quality assurance program conducted in accordance with the requirements.of Appendix; B. ' ' * "
N/A No X_ Yes
-_ If Yes, Explain _
a-on C.
This deficiency represents a pinnificant deficiency in final design as approved and released for construction such that
- the, design does-not conform to the criteria bases stated in the -
' i ' '.
safety analysis report or construction permit.
5 No X
Yes If Yes, Explains N/A l
N.i.q.h QR
.a ERT Form M o
f n
.,.,.,.-~,-n
(
(
,...)
,, y REQUEST FOR REPORTABILITY EVALUATION D.
Thas
. deficiency represents a
significant deficiency in construction of or significant damage to a structure, system or component which will reautre extensive evaluation.
extensave
- redesign, or extensive repair to meet the criteria and baseh stated in the safety analysis report or construction permit or to otherwise establish the adecuacy of tne structure,
- system, or componeris to port form its intended safety function.
No.___I,Yes
___ If,Yes, Explains, N/A l
I i
08.
E.
This deficiency represents a sinnificant, deviation frem the performance specifications which will require extensive evaluation, extensive
- redesign, or extensive repair to establish the adequacy of the.' structure,
- systee, or component to perform its intended safety function.
l No X
Yes __
If Yes, Explains N/A
.)
IF ITEM 4A, e.NR 4B QR AC QR 4D QR 4E ARE MARKED "YES",
JMMEDIATELY tjgMD-CARRY THIS REQUEST AND SUPPORTING DOCUMENTATION TO NSRS.
E_
_.16:,11.id Thia Condition was Idontified by:
ERT Investi)ator phone Ext.
NO_&_$ 4 l
ERT Project Manager phone Ext.
Acknowledgment of receipt by NSRS
./
Dete, _' p[0 Time }$ k-w L,
U _ __. _%,.
S i g r4e, d
__ ~'
[
.e t
- 4 ERT Forse.M 0
e--.
~
Attcchinint 2 Pcgs 1 of 1 j
10/18/88 (EMPLOYEE CCNCERNS) 13:0n:28 1
CAT ISSUE PLANT PRIORITY,ORG QTC EGO INSP SD RD GD 10 ------CONCERN-------
S 1
R0 SR XX-85-100-001 t'WORDS:
s '.-*
WELDMENT IMPLEMENTATION NONSPECIFIC PROB: WCPlF SECUOYAH: AN UNDETERMINED NUMBER OF WELDS MAY HAVE BEEN IMPROPERLY REPAlRED.
DETAILS MNOWN TO QTC. WITHHELD DUE TO CONFIDENTIALITY. CONSTR. DEPT. CONCERN. Cl HAS NO FURTHER INFORMATION.
IR: XX-85-100-001 STAT:
RC:
TECHNICAL COMMENTARY:
4 4
e T
f
.g
.'!?;
Attachme:t 3 PaBe 1 of 3 SUNNARY OF SQN SPECIFIC EMPLOYER CONCERNS REVIEWED BY WELDING PROJECT EMPLOYEE CONCERN NUMBER ISSUE WP ACTION I
II-85-088-003 Alterations to Welder Not substantiated by ERT Qualification Records in Report 11-85-088-003 of Enoxville 3/8/86 (Attachment 3).
11-85-124-001 Burial of Electrode Stubs Not safety-related. No
[
action required.
11-85-086-003 Bos Anchor Design Substantiated by NSRS Report Deficiency.
I-85-560-SQN (Attachment 3).
WP concurs with report recommendations.
II-85-069-003-R1 Acceptance of Previously Not Substantiated by NSRS i
1.,
Rejected NDE Items Report I-85-738-SQN (Attach-ment 3).
WP concurs with l
'4,1 report recommen.dations.
SQM-5-001-001 Uncertified Walder Foreman Substantiated by WP Evaluation SQM-5-001-002 Performing'Preweld Report WP-16-SQN (Attachment WBN-5-001-002 Inspections 3).
Interim corrective (Also Listed in actions are being the Generic formulated. Closure is based on these actions.
Summary)
Additional corrective actions may be implemented.
q
~
II-85-068-007 Nanufacture of Dravo Spool Not substantiated by NSRS Piece REPORT I-85-636-SQN (Attachment 3).
II-85-069-001 Inadequate OJT-Records for The general issue of II-85-069-001-R1 ISI and QC Personnel for N0' inadequate OJT-records was II-85-069-105 substantiated by NSRS Report I-85-373-NPS (Attachment 3).
11-85-069-007 No falsification of records was substantiated. WP con-cars with report recommen-s
'N}
dations.
l s-05640
Page 2 of 3
)
./
EMPLOYEE CONCERN NUN 85R ISSUE WP ACTION SQM-6-005-001 Craft Welder Incapable of SQM-6-005-001 was SQN-6-005-X02 Naking Proper Welds substantiated; SQM-6-005-102 was not substantiated by NSRS Report I-86-115-SQN (Attach-ment 3).
WP concurs with report.
21-85-013-001 E309 Electrode Used to Wold This is an acceptable R316 Steels practice.
ERT investigated in ERT Report XI-85-013-001, dated 3/22/85 (Attachment 3).
WP concurs.
11-85-041-001 Improper Weld Rod Used in Not substantiated by NSRS Diesel Generator Building Report I-85-756-SQN (Attachment 3).
.t
?
XX-85-049-001 Welder Certifications IK-85-049-001 was XX-85-049-103 Updated Without Meeting substantiated as it relates Requirements to Welder Continuity Require-ments. This had previously been identified by NO in an audit. 11-85-049-103 was not substantiated. Details and recommendations are given in NSRS Report I-85-135-SQN (Attachment 3).
WP concurs 1
l with I-85-135-SQN-01 through
-03 and recommends they be closed based on the WP-Bechtel Audit of SQN in Eey Elements 4.0, 5.0, and 17.0 (Attachment 4).
I l
l QC Holdpoint Sign-Off Not substantiated by NSRS II-85-054-001 r
Violation Report I-85-346-SQN (Attachment 3).
l XI-85-065-001 Performance of Remote Visual Not substantiated by NSRS Inspections Report I-85-750-SQN l
(Attachment 3).
,}
/
05640
Attachmest 3 PaBe 3 of 3 I
EMPLOYER CONCERN NUN 88R ISSUR WP ACTION 11-85-083-001 SQN Wold Inspections not as Not substantiated by NSRS Strict as WBN Report I-85-652-SQN (Attachment 3).
X1-85-098-001 Laminated Pipe in Unit 2 Not safety-related. Not condenser. This issue is substantiated by WP Evaluaties also on the Generic Summary Report WP-18-SQN (Attachment i
3).
[
l i
31-85-100-001 Improper Weld Repair on an Not substantiate'd by IRT Undetermined Number of Report 11-85-100-001, dated Welds 3/5/96 (Attachment
).
X1-85-101-006 Welder Certification for ERT Report XI-85-101-006 the Construction Era (Attachment 3) with NSRS Recommendations indicates that this concern is sub-stantiated, k'P takes excep-tion to this ERT Report based on subsequent information provided in Attachment 4.
WP exceptions, recommen-dations, and basis for closure were discussed with NSRS as documented in Attach-ment 5.
WP recommends this I
l concern not be substantiated l
and that it be closed based i
on the WP-Bechtel Implemen-tetton Audit, Key Elements 4.0, 5.0, 17.0 tAttachment 6).
i t
XI-85-102-011 NDE Inspectors Cannot Write Not substantiated by'NSRS Notice of Indications for Report I-85-735-SQN j
Preservice-Relsted Defects (Attachment 3).
j 21-85-108-001 Socket Welds Not Inspected Not substantiated by NSRS 31-85-108-002 Report I-85-776-SQN (Attachment 3).
l
- ')
05640
-_=
~
PROGRAM SUPftARIZATION OF WELD PROJECT (WP) EVALUATION This package summarizes the actions taken by the Welding Project (WP) to evaluate and disposition the subject SQN-specific employee concern which was previously evaluated by NSRS/QTC/ERT and summarized in WP Phase I and Phase II reports.
The Welding Project analyzed each SQN-specific employee concern to determine the statement (s) being voiced by these individuals.
These statements were then evaluated both individually and collectively to develop issues.
Each issue was then incorporated into the WP review activities of Phase I,
" Procedural Assessment" and Phase II, " Procedural Implementation."
Duriang Phase I, each issue was analyzed against requirements of the applicable QA program, policies, NSRS/QTC/ERT Investigation Reports, and other relevant information to determine if program elements were deficient when evaluated i
against upper-tier requirements.
Phase II consisted of a sample reinspection of hardware and independent program audit by Bechtel.
In each area analyzed by Bechtel, the auditors found no objective evidence to s'ubstantiate the employee concerns considered. The following areas directly related to employee concerns were investigated by the audit team:
1.
Walder qualification and attendant records 2.
Welder qualification and attendant on-the-job-training 3.
Welding inspections l
4.
Welding inspectors training programs 5.
Weld material traceability 6.
Welding inspections by craft personnel l
r 7.
Weld material control Each of these areas was investigated by the auditors-for both construction and operations phases.
In all cases, there was no objnctive evidence to l
substantiate the employee concerns. The audit report concludes that both construction and operations phases have had and now have a functioning Welding Quality Assurance Program which meets code, standard, and regulatory requirements and that the employee concerne considered were found to be j
-unsubstantiated and without technical merit.
i 1
?
i l
3157T Page 1 of 2 l
1 f
4..
.... ~
~.
d The results of the reinspection program at SQN also give another, additional verification of the Welding Quality Assurance Program for both construction and operations phases and serve to establish additional confidence in the accuracy and implementation of these programs through hardware inspections and attendant document reviews. In all cases, the components and items were found i
to be acceptable upon initial reinspection or found to be acceptable after engineering analysis.
The WP analysis of SQN-Specific Employee Concerne supplemented by the independent Bechtel Audit, reinspection of installed components and system, and independent (NSRS) overview and investigations has not revealed any significant or generic inadequacies in the welding programs for either the construction or operations phase at SQN which have been directly identified through the Employee Concern Program. The Employee' Concern Program has simply reiterated problems which have been or are now being resolved through existing corrective action programs in the overall Nuclear Quality Assurance Program.
A summary analysis of the WP evaluations and recomm6ndations is included in Attachment.
i I
l-Page 2 of 2 l
v
.m_m__m_-mm_,_