ML20212J336

From kanterella
Jump to navigation Jump to search
Forwards List of Outstanding Submittals Re Licensing Issues to Which NRC Response Expected.Ack Recent Efforts to Complete Submittals Re Cyclic & Transient Limits & Diesel Generator Operability
ML20212J336
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/08/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
SL-1088, NUDOCS 8608140293
Download: ML20212J336 (4)


Text

  1. -

Georgia ibwer Company 333 Piedmont Avenue

)

Ati:nta, Georgia 30308 s

T;iephons 404 526 G526 Mailieg Addrees:

Fbs Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwa Irv souttem eeG c system Manager Nuclear Safety and Licensing SL-1088 0411C August 8, 1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBf1ITTALS LIST Gentlemen:

Enclosed please find an updated listing of those items of correspondence with the NRC to which a written response is expected.

The enclosure is tabulated chronologically by Georgia Power Company's submittal date.

Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you might have regarding these licensing issues.

Georgia Power Company acknowledges and appreciates the recent NRC efforts to complete licensing action on our submittals related to:

cyclic and transient limits, and diesel generator operability.

If you have further questions, please contact this office at any time.

Sincerely, L. T. Gucwa MJBlackwood/lc Enclosure Nuclear Regulatory Commission c: Georgia Power Company ^

Dr. J. N. Grace, Regional Administrator Mr. J. P. O'Reilly Mr. J. T. Beckham, Jr.

Senior Resident Inspector Mr. H. C. Nix, Jr.

g GO-NORf1S w12natnane P

l Pcg3 No.

1 08/05/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC

)

1 LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UPCOMING OUTAGE C ITEM CLOSED SINCE LAST REPORT N ITEM ADDED SINCE LAST REPORT 01/26/77 321 PROPOSED CHANGES TO INTEGRATED LEAK RATE TESTING 08/30/77 321 PP.OPOSED TECHNICAL SPECIFICATIONS - ALLOW USE OF MODIFIED CRANE TO LIFT SPENT FUEL CASK 10/03/78 321 PROPOSED TECHNICAL SPECIFICATIONS - CHANGE PSW, DIESEL REQUIREMENTS TO REFLECT SWING STATUS OF D/G 1B 03/05/79 321 PROPOSED TECHNICAL SPECIFICATIONS - REMOVE REFERENCE TO OUTDATED VERSION OF APPENDIX J 09/27/82 366 PROPOSED TECHNICAL SPECIFICATIONS - BUILDING SETTLEMENT SURVEILLANCE - SUBMIT UPDATED TABLE 04/15/83 321,366 GENETIC LETTER 82 REQUIREMENTS FOR EMERGENCY RESPONSE CAPABILITY 04/23/84 366 PROPOSED TECHNICAL SPECIFICATIONS - ATWS RPT LCO CLARIFICATIONS 09/05/84 366 PROPOSED TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION OF PURGE AND VENT ON HI RAD 09/12/84 321

' PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 09/19/84 366 FRACTURE MECHANICS ANALYSIS PER GENERIC LETTER 81 FEEDWATER NOZZLE 11/09/84 321,366 DIESEL GENERATOR TECHNICAL SPECIFICATIONS 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE r

05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA l

BROADENING 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 INSERVICE TESTING - INSERVICE INSPECTION PROGRAMS UPDATE 07/26/85 321 C REQUEST TO REVISE TECHNICAL SPECIFICATIONS - ADD SPECIFICATION AND TABLE ADDRESSING COMPONENT CYCLIC AND TRANSIENT LIMITS

o Pcgo No.

2 08/05/86 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC LETTER UNIT SUBJECT DATE 08/20/85 321 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS FOR HIGH RADIATION ISOLATION OF PURGE AND VENT VALVES - DOCR 85-20 09/13/85 321,366 REQUEST TO REVISE TECHNICAL SPECIFICATIONS - SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE CONTROL BUILDING CO2 FIRE SUPPRESSION SYSTEM - DOCR 85-16 01/06/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE FIRE HOSE STATIONS FROM TABLE DOCR 85-14 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE REQUIREMENT FOR HYDROGEN'RECOMBINERS 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS 01/07/86 321 APPENDIX G AND H TECHNICAL SPECIFICATIONS - REACTOR PRESSURE VESSEL MATERIAL SURVEILLANCE CAPSULES AND FRACTURE TOUGHNESS ANALYSIS 01/07/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL 01/27/86 321,366 REVISION TO GASEOUS EFFLUENT TECHNI_ CAL SPECIFICATIONS -

SAhPLING REQUIRE'5EN'TS AFTER A POWER LEVEL CHANGE, TRITIUM

,02/07/86 321,366 RFAI INSERVICE INSPECTION PROGRAM 02/17/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION

- RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, QA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL

~ 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT l03/03/86 321 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - PRIMARY CONTAINMENT ISOLATION SYSTEM LISTING CORRECTIONS 03/13/86 321,366 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAIMMENTS - GENERIC LETTER 83-08

03/27/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS

-m-_.-

i Pcg2 No.

3 108/05/86

~D-OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC

~

LETTER UNIT SUBJECT i

-DATE t

l33/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15

34/04/86 366 REITERAT. ION OF PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCORPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES
34/15/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - FUEL STORAGE REQUIREMENTS, FUEL ASSEMBLY DESIGN, MAPLHGR LIMITS, ROD WORTH MINIMIZER, ROD SEQUENCE' CONTROL, BANRED POSITION WITHDRAWAL SEQUENCE, EDITORIAL CHANGES
)5/14/86 321,366 IE BULLETIN 85 MOTOR OPERATED VALVE COMMON MODE FAILURES DURING PLANT TRANSIENTS DUE TO IMPROPER SWITCH SETTINGS

!)S/16/86 321,366 PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSITION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT REPORTING RELATIONSHIPS i)S/16/86 321,366 EXEMPTION REQUESTS - APPENDIX R

!)6/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE

~

')7/11/86 366 N ADDITIONS TO TECHNICAL SPECIFICATION TABLE ON CIRCUIT BREAKERS l)7/18/86321,366 N PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP 17/18/86 366 N TECHNICAL SPECIFICATIONS FOR ANALOG TRANSMITTER TRIP SYSTEM 17/18/86 366 N REVISION TO PCIS TABLE TECHNICAL SPECIFICATION 7/25/86 321,366 N CHANGE TO TECHNICAL SPECIFICATIONS - DELETION OF FIRE l

PROTECTION TECHNICAL SPECIFICATIONS AND LICENSE CONDITIONS DUE TO INCORPORATION IN FIRE HAZARDS ANALYSIS i

7/23/86 366 N FRACTURE MECHANICS ANALYSIS OF FEEDWATER NOZZLES - REQUEST FOR SCHEDULE FOR REPLACEMENT OF CONTROLLER OR NEW ANALYSES 7/28/86 321,366 C ONE TIME EXTENSION OF LCO FOR LOSS OF DIESEL GENERATOR 7/28/86 321,366 C ADDITIONAL INFORMATION - ONE TIME EXTENSION OF LCO FOR LOSS OF DIESEL GENERATOR 1

.....