Forwards Insp Repts 50-206/86-45,50-361/86-34 & 50-362/86-33 on 861115-1220 & Notice of Violation.Unit 2 861210 Reactor Trip Involved Issues of Concern,Including Improper Transfer of Uninterruptible Power Supply
ML20212H979
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/09/1987
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Baskin K
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20212H986 List:
References
NUDOCS 8701280067
Download: ML20212H979 (2)


See also: IR 05000206/1986045

Text

(

'7+

>

w. .

.

-

.g*

_ g s

.

'

.

v-

_

,

JAN 091987

,

>

~

Docket Nos. 50-206, 50-361,.'50-362

'

'

.

  1. .

.

Southern >CalifdrniaEdisonCompany-

~

P..O. Box 800.

2244 Walnut Grove: Avenue

Rosemead, California 92770

Attention:

Mr. Kenneth P. Baskin, Vice President'

Nuclear Engineering Safety and Licensing

Gentlemen:

,

,

This refersito'the routine inspection conducted by Messrs. F. R. Huey, J. P.

Stewart, J. E. Tatum,. and Ms. R. C. Tang of thi:; office 'during the period of

November 15 through December 20, 1986, of activities authorized by NRC License

Nos.:DPR-13, NPF-10 and NPF-15 and to the discussion of our findings held by

the inspectors with Mr. H. B. Ray and other members of the Southern California

Edison staff at the conclusion of the inspection.

Areas examined.during this inspection are described in the enclosed inspection

report. Within these areas,.the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A.

Your. response to this Notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

.The Unit 2 reactor trip on December 10, 1986, discussed in paragraph 3.b of

the enclosed inspection report, involved issues of concern to the NRC.

The

improper transfer of an uninterruptible power supply, which initiated the

trip, demonstrated a need for more effective supervision, additional

attentiveness by operating personnel, and closer adherence to approved

procedures.

In view of your identifying these issues and taking appropriate

corrective actions, consistent with the NRC's Enforcement Policy, enforcement

action was not taken in this case.

However, you should continue to ensure

that effective action is taken to preclude recurrence.

8701280067 870109

PDR

ADOCK 05000206

G

PDR

.

/60

/

,

t

.

/

.

,-

,

..

.

_. ._

JAN 0919$h

-2_

~

In'accordance with 10 CFR 2.790(a), a copy of this letter, the enclosure, and

your response will be placed in the NRC Public Document Room.

The responses directed by this letter and the accompanying _ Notice are not

subject to.the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be glad to

discuss them with you.

Sincerely,

o,:g:not sign s ty'

O. f, Kirnh ,

A. E. Chaffee, Acting Chief

Reactor Projects Branch

Enclosures:

1.

Notice of Violation

2.

Inspection Report:

Nos. 50-206/86-45

50-361/86-34

50-362/86-33

cc w/ enclosures:

D. J. Fogarty, Executive Vice. President

H. B.-Ray,_Vice President (San Clemente)

H. E. Morgan, Station Manager (San Clemente)

State of California

bec w/ enclosures:

L

RSB/ Document Control Desk (RIDS)

'

Project Inspector

Resident Inspector

G. Cook

B. Faulkenberry

J. Martin

bcc w/o enclosure 2:

M. Smith

LFMB

l

/$

V

/b

/ dot

PJMWn

AJob son

AChaffee

87

1/ 8 /67

1/6 87

1/4/87

s

E UEST COPY ]

ST COPY ] REQUEST

P ] REQUEST C PY ]

YS / NO

ES / NO

] YES / N0

] YES / NO

]

TO PDR

YS / NO