ML20212H979
| ML20212H979 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/09/1987 |
| From: | Chaffee A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Baskin K SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20212H986 | List: |
| References | |
| NUDOCS 8701280067 | |
| Download: ML20212H979 (2) | |
See also: IR 05000206/1986045
Text
(
'7+
>
w. .
.
-
.g*
_ g s
.
'
.
v-
_
,
JAN 091987
- ,
>
~
Docket Nos. 50-206, 50-361,.'50-362
'
'
.
- .
.
Southern >CalifdrniaEdisonCompany-
~
P..O. Box 800.
2244 Walnut Grove: Avenue
Rosemead, California 92770
Attention:
Mr. Kenneth P. Baskin, Vice President'
Nuclear Engineering Safety and Licensing
Gentlemen:
,
,
This refersito'the routine inspection conducted by Messrs. F. R. Huey, J. P.
Stewart, J. E. Tatum,. and Ms. R. C. Tang of thi:; office 'during the period of
November 15 through December 20, 1986, of activities authorized by NRC License
Nos.:DPR-13, NPF-10 and NPF-15 and to the discussion of our findings held by
the inspectors with Mr. H. B. Ray and other members of the Southern California
Edison staff at the conclusion of the inspection.
Areas examined.during this inspection are described in the enclosed inspection
report. Within these areas,.the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your. response to this Notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
.The Unit 2 reactor trip on December 10, 1986, discussed in paragraph 3.b of
the enclosed inspection report, involved issues of concern to the NRC.
The
improper transfer of an uninterruptible power supply, which initiated the
trip, demonstrated a need for more effective supervision, additional
attentiveness by operating personnel, and closer adherence to approved
procedures.
In view of your identifying these issues and taking appropriate
corrective actions, consistent with the NRC's Enforcement Policy, enforcement
action was not taken in this case.
However, you should continue to ensure
that effective action is taken to preclude recurrence.
8701280067 870109
ADOCK 05000206
G
.
/60
/
,
t
.
/
.
,-
,
..
.
_. ._
JAN 0919$h
-2_
~
In'accordance with 10 CFR 2.790(a), a copy of this letter, the enclosure, and
your response will be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying _ Notice are not
subject to.the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
o,:g:not sign s ty'
O. f, Kirnh ,
A. E. Chaffee, Acting Chief
Reactor Projects Branch
Enclosures:
1.
2.
Inspection Report:
Nos. 50-206/86-45
50-361/86-34
50-362/86-33
cc w/ enclosures:
D. J. Fogarty, Executive Vice. President
H. B.-Ray,_Vice President (San Clemente)
H. E. Morgan, Station Manager (San Clemente)
State of California
bec w/ enclosures:
L
RSB/ Document Control Desk (RIDS)
'
Project Inspector
Resident Inspector
G. Cook
B. Faulkenberry
J. Martin
bcc w/o enclosure 2:
M. Smith
LFMB
l
/$
V
/b
/ dot
PJMWn
AJob son
AChaffee
87
1/ 8 /67
1/6 87
1/4/87
s
E UEST COPY ]
ST COPY ] REQUEST
P ] REQUEST C PY ]
YS / NO
ES / NO
] YES / N0
] YES / NO
]
TO PDR
YS / NO