Text
_ _
=
.p ase,,
UNITED STATES
/
'\\
NUCLEAR MEGULATCRY COMMisslON
[
ctvon m 5
tes moosavatt mono sLs= sLLvn, estimons seia January 10, 1986 S
MEMORANDUM FOR:
Charles H. Weil, Investigation and CNnpliance Specialist FROM:
T. N. Tambling, Director Enforcement and Investigation Coordination Staff
SUBJECT:
ALLEGATION - FERMI FEEDWATER PUMP / TURBINE FAILURE Alleger:
1 The individual called January 8,1986, to state that he was directly involved in the installation / erection of the operating equipment including the Main Feedwater pump / turbine at Fenni during the construction phase.
Based upon information in the paper and other contacts, he heard that the Main Feedwater 1
pump had failed. He stated that the published reasons for the failure are incorrect and if this is the same infonnation being furnished to the NRC, it too is incorrect.
i First the problem had to be in the turbine.tnd not the pump as indicated in the paper. The problem goes back to the erection / assembly procedure used by Bechtel and the incompetency of those planning, supervising, and doing the work on the turbine.
Based upon his observations, he recomended a takedown of the turbine to ensure that it was properly assembled, i
There were many other examples of Bechtel's incompetencies and operator errors that resulted in damage to equipment and its misoperations. These included recirculations and RHR pumps.
i Similar incompetencies were evidenced in the erection / assembly of the main turbine.
One indication of Bechtel management was the fact a supervisor was fired for taking kickbacks on handing out foreman jobs.
Names of parties and certoln other Identifying detalls have h.c... ru:v:3 in order to prevent a steerly unarrcnter! Inv::clen of the privecy of the Individnis..Involvede' personal 8612150415 061209 TE A-144 PDR g 8(o-S - d O O 6 engt 4.L5
Charles H. Weil 2
December 10, 1986 The individual indicated a willingness to be recontacted either by phone or in person to cover specific details on the turbine failure. He is available the week of January 13-17, 1986.
i T. M.
T. N. Tambling Director Enforcement ard Investigation Coordination Staff l