OPERATING DATA REPORT DOCKET N0. 50-266 DATE June 9, 1986 COMPLETED BY C. W. KRAUSE TELEPHONE 414 277 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1
. NOTES
- 2. REPORTING PERIOD:
MAY 1986
- 3. LICENSED THERMAL POWER (MWT):
1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET HWE): 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (HET MWE):
485.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE 4
jg
- 11. HOURS IN REPORTING PERIOD 744 3,623 136,463 n o o.
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 328.0 2,784.3 110,257.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 4.0 638.4 40
- 14. HOURS GENERATOR ON LINE 258.4 2,710.7 107,617.5
- 15. UNIT RESERVE SHUTDOWN HOURS 10.0 10.0 814.0 y[di
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 304,491 3,?57,902 147,125,846 go
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 102,980 1,352,270 49,503,950 n<
- 18. HET ELECTRICAL ENERGY GENERATED (MWH) 94,662 1,292,132 47,110,984 5
- 19. UNIT SERVICE FACTOR 34.7 74.8 78.9 ott
- 20. UNIT AVAILABILITY FACTOR 36.1 75.1 79.5
$$at
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 26.2 73.5 70.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 25.6 71.8 69.5
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 2.3
(_\\
- 24. SHUIDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
HONE p
__; }._
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE June 9, 1986 REPORT MONTH MAY 1986 COMPLETED BY C.
W.
Krause TELEPHONE 414/277-2001 c
b U
C^
e4
% Q co C
om C
o M
D r4 W o
tD o Ei v c an No.
Date
}l.$$
Licensee Event 8)$
Cause & Corrective Action h
y[$
j fjjg Report No.
gg gg To Prevent Recurrence a
m u
gym m
2 860412 S
473.6 C
4 N/A ZZ ZZZZZZ Continuation of refueling and maintenance outage No. 13.
3 860521 S
12 B
6 N/A ZZ ZZZZZZ Unit removed from service for turbine overspeed testing and secondary chemistry.
1F:
Forced 2 Reason:
3 Method:
4 Exhibit G-Instructions S:
Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets i
C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load sExhibit I-Same Source F - Administrative 6 - Other (explain)
G - Operational Error (explain)
H - Other (explain)
EQR-28B (06-86)
- ~
DOCKET NO.
50-266 UNIT NAME Point Beach, Unit 1 DATE June 9, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH May 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
-2 11
-9 21 30 2
-2 12
-7 22 118 3
-2 13
-7 23 151 4
-2 14
-8 24 461 5
-2 15
-12 25 437 6
-2 16
-12 26 439 7
-1 17
-10 27 440 8
-2 18
-11 28 453 9
-2 19
-13 29 501 10
-6 20 16 30 503 31 503 EQR-28a (04-86)
e NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE June 9, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 Unit 1 completed refueling and maintenance outage No.13.
Significant maintenance items completed during the outage include condenser tube replacement, moisture separator reheater internals replacement, 1, 2, 3, and 5 feedwater heater replacement, plant process computer replacement, and upgrading the control circuits of 20 environmentally qualified valve motor operators.
The reactor went critical at 8:05 AM on May 18, 1986, and the unit was phased on line at 4:40 PM on May 20.
After turbine trip testing, the unit was phased back on line at 2:00 PM on May 21.
k
OPERATING DATA REPORT DOCKET FO. 50-301 DATE June 9, 1986 COMPLETED BY C. W. KRAUSE TELEFHONE 414 277 2001 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2
. NOTES
- 2. REPORTING PERIOD:
MAY 1986
- 3. LICENSED THERMAL POWER (MWT): 1518.
- 4. NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWEtr 497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSb MWE): 509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 3,623 121,248
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,619.2 107,167.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 207.4
- 14. HOURS GENERATOR ON LINE 744.0 3,599.2 105,399.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 9.9 244.2
- 16. GROSS THERMAL ENERGY GENERATED (MUH) 1,110,585 5,366,571 148,246,441
- 17. GROSS ELECTRICAL ENERGY GENERATED (MUH) 371,500 1,819,240 50,235,090
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 354,556 1,739,428 47,853,914
- 19. UNIT SERVICE FACTOR 100.0 99.3 86.9
- 20. UNIT AVAILABILITY FACTOR 100.0 99.6 87.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.3 99.0 80.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.9 96.6 79.4 l
- 23. UNIT FORCED OUTAGE RATE 0.0 0.7 1.3
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
1 Refueling and maintenance outage scheduled to commence September 26, 1986.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARIUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTENBER 22, 1977
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE June 9, 1986 REPORT MONTH MAY 1986 COMPLETED BY C.
W.
Krause TELEPHONE 414/277-2001 9o P
c^
N (64 Q c1 d
o to C
o 4
0
~d0 8
C ES Po 8*o
~
e eo e
o r4 o Licensee Event ue o.c Cause & Corrective Action No.
Date g
y3
$d@
Report No.
$O
@O To Prevent Recurrence g
o o :s a:
u) o lE:.C v1 I
3 860525 S
N/A H
N/A N/A ZZ ZZZZZZ Low system power demand - holiday.
1 1F:
Forced 2 Reason:
3 Method:
4 Exhibit G-Instructions S:
Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Test 2 - Manual Scram data entry sheets C - Refueling 3 - Autcmatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load 5 Exhibit I-Same Source v - Administrative 6 - Other (explain) c; - Operational Error (explain)
H - Other (explain) i EQR-28B (06-86) 1
DOCKET NO.
50-301 UNIT NAME Point Beach, Unit 2 DATE June 9, 1986 COMPLETED BY C.
W.
Krause TELEPHONE 414/277-2001 AVERAGE DAILY UNIT POWER LEVEL MONTH May 1986 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
487 11 485 21 483 2
488 12 485 22 481 3
494 13 486 23 480 4
485 14 485 24 462 5
486 15 485 25 299 e
6 491 16 484 26 457 7
486
17 486 27 464 8
486 18 486 28 482 9
486 19 485 29 483 10 487 20 484 30 483
)
31 473 EQR-28a (04-86)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE June 9, 1986 COMPLETED BY C. W. Krause TELEPHONE 414/277-2001 Unit 2 operated at approximately 487 MWe net throughout the period with one load reduction over the Memorial Day weekend due to low system demand.
Safety-related maintenance includes the repair of a body-to-bonnet leak on 2-431B pressurizer spray valve.
l l
l l
l t
l i
i Inscomun Electnc macouna I
231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 VPNPD-86-252 NRC-86-52 June 9, 1986 Director of Nuclear Regulatory Operations U.
S. NUCLEAR REGULATORY COMMISSION Washington, D.
C.
20555 i
Gentlemen:
MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of May 1986.
Very truly yours, m
Sol Burstein Vice Chairman of the Board Attachments Copies to R. S. Cullen, PSCW 4
J. G. Keppler, NRC Region III NRC Resident Inspector Blind copies to R. W. Britt/R. H. Gorske/A. W. Finke, Sol Burstein, Gerald Charnoff, S. T. Derenne, G. M. Krieser, E. J. Lipke, R. A. Newton, J. J. Zach, C. E.
Ziegler, ANI, INPO Records Center