Monthly Operating Repts for Sept 1986
ML20211D898
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/30/1986
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20211D757 List:
References
NUDOCS 8610220298
Download: ML20211D898 (13)


Text

--

OPERATING DATA REPORT DOCKET NO.

50-369 DATE 10-15-86 COatPLETED BY 33-Renvis TELEPl!ONE 704-173-7567 OPERATING STATUS

1. Unit Name:

McGuire 1 Notes

  • Nameplate Rating (Gross MWe) calculated as
2. Reporting Period:Santamher 1.

Iqa6 saneamhar 10. 1986

3. Licensed Thermal Power 151Wt):

3411 1450.000 MVA x.90 power 1305*

factor per Page lii,

4. Nameplate Rating (Gross $1We):

NMG-00 20.

5. Design Electrical Rating (Net alWe):

1150

6. Staximum Dependable Capacity (Gross alWe):
7. Staximum Dependable Capacity (Net 31We):

1190

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

None None

9. Power Level To Which Restricted.lf Any(Net alWe):
10. Reasons For Restrictions,If Any:

This alonth Yr..to.Date Cumulative

11. Hours in Reporting Period 720.0 6 551.0 42 359.0
12. Number Of Hours Reactor Was Critical 441.8 3 555.1 28 561.0
13. Reactor Reserve Shutdown flours
14. Hours Generator On.Line 365.9 3 460.5 28 172.1
15. Unit Reserse Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 944 223 10 733 479 78 100 054
17. Gross Electrical Energy Generated (N!WH) 312 589 3 728 517 27 039 750
18. Net Electrical Energy Generated (SIWH) 286 459 3 543 926 25 695 940
19. Unit Service Factor 50.8 52.8 66.5
20. Unit Availability Factor 50.8 52.8 66.5
21. Unit Capacity Factor (Using. lDC Net) 34.6 47.0 51.6

\\

34.6 47.0 51.6

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 9.4 5.2 13.3
24. Shutdowns Scheduled Oser Nest 6.\\lonths (Type. Date.and Duration of Each t:

mnn

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commercial Operation):

Forecast Achieved INITI \\ L CRITICA LITY INITIAL ELECTRICITY CO\\l%IERCIA L OPER ATlON 8610220290 861015 ADOCK0500g9 (o/77)

PDR R

.-..-. _ = _

___m.

f 1

1 4I AYERACE DAILY UNIT POWER LEYEL 4

3, 4

}

j DOCEET NO.

50-369 tNIIT McGuire 1 i

DATE October 15, 1984 COMPLETED BY J. A. Reavis j

TELEPHONE 704-373-7567 a

f MONTH SEPTEMBER, 1984 a

q i

DAY AYERACE DAILY POWER LEVEL DAY AYERACE DAILY POWER LEVEL i

IMWE-Net!

IMWE-Neti 4

i 1

0 17 210 2

0 18 818 3

0 19 1123 i

4 0

20 1124 1

9 0

21 1994 6

0 22 933 j

7 0

23

'1838 8

0 24 741 9

0 25 17 4

10 0

26 401 I

11 0

21 1060 12 0

28 1101 13 0

29

!!!2 14 0

30 1818 l

13 122 31 q

i le 230

(

4 1

I t

d i,

n a

l 1

i 4

4

-me m,--w-

---.-.-,.-w.,,

.-wr..w,-y..-w--e,-

,y...e,-----e

,,.-.i,.-..-w,...-.

...,..y---,.-

yem-.-.r-

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME McGuire 1 DATE 10/15/86 Page 1 REPORT MONTH September 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 O

gj License Cause & Corrective y

cSO "c

uSE h"

h Action to No.

Date

~.

%h g

3gc Event S

5S E

%3$

RB EV OO Prevent Recurrence H

o-

=

E m o Report #

mo 8

86-09-01 S

316.27 C

4 RC FUELXX Refueling Outage Extension due to Repair of Damaged Fuel Assembly 9

86-09-14 F

7.18 H

3 EG CKTBRK While Closing Generator Breaker "lA",

! Picked Up Relays in the Turbine /Gener-latorTripLogic 1

20-p 86-09-14 F

B IB INSTRU Calibrate Excore to Thermal Power Best Estimate 21-p 86-09-14 F

A CH VALVEX Feed Pump "A" Recirculating Valve Wide Open Causing Vacuum to Be Low y

10 l

86-09-14 F

5.92 A

4 HA VALVEX Hydraulic 011 Leak on "lB2" Intercept l

Valve, Reactor Remained Critical 22-p l 86-09-15 F

A HC HTEXCH Low Condenser Vacuum 23-p 86-09-15 F

A WG VALVEX l"RN-277"FailedCloseddue to Regula-l ting Failure Caused by Decon Crew Work 1

24-p 86-09-15 F

F CH ZZZZZZ Hold for Secondary Chemistry 25-p 86-09-16 F

Aj HC HTEXCH Condenser Tube Leak Repairs i

1 2

3 4

Reason:

Method:

Exhibit G - Instructions

[

X-Equipment Failure (Explain) 1-Manual for Preparation of Data cg g B41aintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autcmatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training G License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

'9/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-369 UNIT NAME Mecuire 1 Page 2 DATE 10/15/86 REPORT 10 NTH September 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_

O gj License y

Cause & Corrective cSO "c

v5E g

No.

Date

~.

%h o,

jgc Event

,Be, g

Action to 5S E

%55 R3 83 H

o-ce zmo Report #

mo uo Prevent Recurrence 26-p 86-09-17 F

F CH ZZZZZZ Hold for Secondary Chemistry 27-p 86-09-17 F

F CH ZZZZZZ Hold for Secondary Chemistry 28-P 86-09-18 S

B IB INSTRU Nuclear Instrumentation Recalibration 29-p 86-09-19 F

B IB INSTRU Calibrate Excores to Thermal Power Best Estimate 30-P 86-09-20 F

A CH PUMPXX Feed Pump "A" Speed Control Problem 31-p 86-09-21 F

A CH VALVEX Feed Pump Suction Pressure Decreasing, Found "B3" Heater Drain Control Valve Closed 32-P 86-09-21 F

A CH PUMPXX Feed Pump Speed Control Problem 33-P 86-09-21 F

A CH INSTRU Investigate Feed Pump and Turbine Supervisory Control Problems 34-P 86-09-22 F

A CH PUMPXX Card Replaced on Feedwater Pump Control 35-P 86-09-22 F

A HA INSTRU Check Turbine Supervisory Control Card Outputs 11 86-09-24 F

24.73 A

3 HA INSTRU

All 4 Turbine Governor Valves Closed 1

2 3

4 Reason:

Method:

Exhibit G - Instructions S

led A-Equipnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training 6 License Examination.

F-Adninistrative 5

G-Operational Error (Explain)

Exhibit I - Sane Source H-Other (Explain)

(9/77)

l i

i i

l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-369 UNIT NAME McGuire 1 DATE 10/15/c6 j

Page 3 REPORT M) NTH september 1986 COMPLETED BY J. A. Reavis l

TELEPHONE 704-373-7567 i

O gj License y

Cause & Corrective e

i SO "c

v "E "Be, E

No.

Date

%h 3-Etc Event Action to g

i 5E E

%55 E3 83 H

o~

cc xmo Report #

mo uo Prevent Recurrence k

i i

j 36-p 86-09-25 F

F CH ZZZZZZ Hold for Secondary Chemistry

}

j 37-p 86-09-26 F

A CH PL?iPXX Work on "B" Feed Pump 38-p 86-09-27 F

A HH PUMPXX Low Condensate Booster Pump Suction i

l Pressure j

)j 39-p 86-09-27 F

A HH PUMPXX Low Condensate Booster Pump Suction Pressure l

40-p 86-09-27 F

A HH HTEXCH Tube Leak on "A2" Feedwater Heaters, j

"A2/B2" Heater String Isolated f

41-p 86-09-27 F

A HH HTEXCH "A2/B2" Heater String Isolated I

i i

)

l i-i 1

2 3

4 i

Reason:

Method:

Exhibit G - Instructions l

A-Equipnent Failure (Explain) 1-Manual for Preparation of Data S

led

i B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee l

C-Refueling 3-Automatic Scram Event Report (LER) j D-Regulatory Restriction 4-Other (Explain)

File (NtREG-0161) 1 E-Operator Training 6 License Examination F-Adninistrative 5

j G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

I (9/77) i

DOCKET NO: 50-369 UNIT: Mecuire 1 DATE: 10/15/86 NARRATIVE SUM &\\RY Month: september 1986 McGuire Unit I returned from its refueling outage on 9/14/86 and following power escalation operated at 100% power until 9/24 when the Digital Exectro-Hydraulic Turbine Governor valve controls malfunctioned. The Governor valves received a signal to close which caused the Turbine and Reactor to trip.

It returned to service on 9/25 and after a chemistry hold increased power to 100%.

It operated at that level for the balance of the month.

MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown:

3.

Scheduled restart following refueling:

4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

221 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE:

October 15, 1986 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

OPERATING DATA REPORT DOCKET NO.

50-370 DATE.10-15-86 C051PLETED BY

.J.A. Reavis TELEPl!ONE 7n4-171-7567 OPERATING STATUS

1. Unit Name:

McGuire 2 Notes

  • Nameplate Rating (Gr ss MWe) calculated as
2. Reporting Period:Sonenmhnr 1-19RA-sonennhor 10. 19R6
3. Licensed Thennal Power 131Wt):

3411 1450.000 MVA x.90 power

4. Nameplate Rating (Gross SIWE):

1305*

factor per Page 111, N m G-0020.

5. Design Electrical Rating (Net SlWe):

1150

6. Stasimum Dependable Capacity (Gross 31We):
7. Sf aximum Dependable Capacity (Net atWe):

11s0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons-None None
9. Power Level To Which Restricted. lf Any (Net.\\lWe):
10. Reasons For Restrictions,1f Any:

This Stonth Yr..to Date Cumulative

11. Ilours in Reporting Period 720.0 6 551.0 22 655.0
12. Number Of }{ours Reactor Was Critical 720.0 4 050.6 15 679.2
13. Reactor Resene Shutdown flours
14. Ilours Generator On.Line 720.0 3 908.7 15 174.2
15. Unit Resene Shutdown flours
16. Gross Thermal Energy Generated (31Wil) 2 455 840 12 906 705 49 057 082
17. Gross Electrical Energy Generated (.\\lwil) 860 306 4 512 727 17 213 294
18. Net Electrical Energy Generated (SlWil) 829 546 4 313 675 16 467 328
19. Unit Senice Factor 100.0 59.7 67.0
20. Unit Availability Factor 100.0 59.7 67.0
21. Unit Capacity Factor (Using.\\lDC Net) 100.2 57.3 62.1
22. Unit Capacity Factor (Using DER Net) 100,2 57.3 62.1
23. Unit Forced Outage Rate 0.0 4.4 18.4
24. Shutdowns Scheduled Oser Nest 6.\\lonths (Type. Date.and Duration of Each t:

linne

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status iPrior to Commereial Operatmn1:

Forecast Achiesed INITI \\ L CRITICA LITY INITIAL ELECTRICITY CO\\l\\lLRCITL OPERT TION P1/77 )

AYERACE DAILY UNIT POWER LEVEL 00CRET NO.

50-370 UNIT McCulre 2 DATE October 15, 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-313-7567 MONTH

$EpiEMBER, 1986 DAY AYERACE DAILY POWER LEVEL DAY AYERACE DAILY POWER LEVEL

.lMWE-Net)

IMWE-Nett i

1148 17 1157 2

1148 18 1854 3

1149 19 1157 4

1848 20 1157 5

1855 21 1157 6

1153 22 1156 7

1152 23 1854 8

1851 24 1153 9

1851 25 1150 10 1152 26 1150 11 1852 27 1150 12 1150 28 1150 f

13 1849 29 1149 l

14 1852 30 1850 l

4 15 1856 31 16 1853 l

l I

i I

4 i

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370 UNIT NAME McGuire 2 DATE 10/15/86 l

REPORT NMTH September 1986 COMPLETED BY J. A. Reavis I

TELEPHONE 704-373-7567 "s.

1 3

% o, g License Cause & Corrective y

c i

32 a5&

y e

No.

Date

%h j3e Event

,5e, g

o Action to i

5E E

%55 RE

$3 Prevent Recurrence F

o-cx:

xmo Report #

mv vu

]

l There were no shutdowns oi povel reduct Lons during Sep :embe r, 1986.

i l

1 4

l i

4 4

i l

)

s j

3 I

1 2

3 4

Reason:

Method:

Exhibit G - Instmctions N

l A-Equipment Failure (Explain) 1-Manual for Preparation of Data 3

7g

{

B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autanatic Scram Event Report (LER) i D-Regulatory Restriction 4-Other (Explain)

File (NtREG-0161)

E-Operator Training 6 License Exanination F-Administrative 5

l G-Operational Error (Explain)

Exhibit I - Same Source j

H-Other (Explain)

(0 /7n

DOCKET NO: 50-370 UNIT: McGuire 2 DATE: 10/15/86 NARRATIVE SIRNARY Month:

September 1986 Mcguire 2 operated at 100% power throughout the month.

l

)

~

1 MONTHLY REFUELING INFORMATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling shutdown:

May, 1987 3.

Scheduled restart following refueling: August, 1987 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in' design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

153 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase: ---

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 DUKE POWER COMPANY DATE: October 15, 1986 Name of

Contact:

J. A. Reavis Phone:

704-373-7567

u McGUIRE NUCLEAR STATION MONTHLY OPERAT1NG STATUS REPORT 1.

Personnel Exposure For the month of August, no individuals exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for August has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

4

.v,,,,-,--

r.-

- - -,,-