ML20211D791

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Rept for Aug 1986
ML20211D791
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 08/31/1986
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20211D757 List:
References
NUDOCS 8610220268
Download: ML20211D791 (2)


Text

,

CREVISION I OPERATING DATA REPORT DOCKET NO. _50-369 DATE 9-15-86 4

CO31PLETED BY T^-

nnavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:

McGuire 1-Notes

  • Nameplate Rating
2. Reporting Period: Aucust 1. 1986-Ancust 11. 1986 (Gross MWe) calculated as

~

1450.000 MVA x.90 power

3. Licensed Thermal Power (51Wt):

3411 1305*

factor per Page lii,

4. Nameplate Rating (Gross SIWE):

NUREG-0020,

5. Design Electrical Rating (Net SIWE):

1150

6. Staximum Dependable Capacity (Gross alWe):
7. Staximum Dependable Capacity (Net SlWe):

11 %

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To which Restricted. if Any (Net A!We):
10. Reasons For Restrictions.lf Any:

1 This 31onth Yr. to-Date Cumulative

11. Hours in Reporting Period 744.0 5 R11.0 41 619.0
12. Number Of Houn Reactor Was Critical 0.0 1 111 1 98 114 ?
13. Reactor Reserve Shutdown Hours

-~~

14. Hours Generator On-Line 0.0 3 094.6 27 806.2
15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 9 789 256 77 155 831 3 415 928 26 727 161 l
17. Gross Electrical Energy Generated (31WH)
18. Net Electrical Energy Generated (5!WH)

-8 369 3 257 467 25 409 481

19. Unit Service Factor 0.0 53.1 66.8 0.0 53.1 66.8
20. Unit Availability Factor
21. Unit Capacity Factor (Using SIDC Net) 0.0 48.6 51.9
22. Unit Capacity Factor (Using DER Net) 0.0 48.6 51.9 0 23. Unit Forced Outage Rate 0.0 4.6 13.4
24. Shutdowns Scheduled Oser Next 6.\\1onths (Type. Date, and Duration of Each t:
25. If Shut Down At End Of Report Period. E.timated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY CO\\l%1ERCIAL OPER ATION hh I

02 R

  • REVISION 1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME Mccuire 1 DATE 9/15/86 REPORT MONTH August 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 i

o o o,$

License y

Cause & Corrective e32 "e

o.c a m

o No.

Date jh 8

ygc Event h

h

-Action to

~ o o

E Report #

uh

$b Prevent Recurrence 7

86-08-01 S

111.00 C

4 RC FUELXX End of : Cycle 3 Refueling Outage

  • 8 86-08-05 s'

633.00 A

4 RC FUELXX Refueling Outage Extension due to Repair of Damaged Fuel Assembly l

I I

i i

~ -..

I 1

2 3

4 Reason:

Method:

Exhibit G - Instructions b

uled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B4faintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161) f E-Operator Training 6 License Examination-F-Administrative 5

G-Operational Error (Explain)

H-Other (Explain)

Exhibit 1 - Same Source

...