Text
CONTAINMENT SYSTEMS CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:
a.
Both doors closed except when the air lock is being used: for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.
An overall air lock leakage rate of j:_ 0.05 La at Pas'49.6 psig.
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and~ fn COLD SHUTDOWN 5
within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
,w SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstratep OPERABLE:
a.
After each opening, except when the ai r lock is being used for multiple entries, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying seal leakage < 0.01 La when the volume between the door seals is pressurized to > 8 psig, for at least 30 seconds, b.
By conducting overall air iock leakage tests at not less_ than Pa (49.6 psig) and verifying the overall air lock leakage rate is within its limit:
1.
At least once per 6 months, # and 2.
Prior to establishing CONTAINMENT INTEGRITY when' maintenance has been performed on the air lock that could affect the air lock ;
sealing capabili ty.*
c.
At least once per 6 months by verifying that only one door in each air lock can ba opened at a time.
- Exemption to Appendix "J" of Ib CFR 50.
- The provisions of Specification 4.0.2 are-not applicable.
8702200042 870217 PDR ADOCK 05000302 P
PDR CRYSTAL RIVER - UNIT 3 3/4 6-5 Amendment No.
o STATE OF FLORIDA COUNTY OF PINELLAS E.
C. Simpson states that he is the Director, Nuclear Operations Engineering and Licensing, for Florida Power Corporation; that he is authorized on the part of said_ company to sign and file with the Nuclear Regulatory. Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the 'best of his knowledge, information, and belief.
mm E. C. Simpson U
Director, Nuclear Operations Engineering and Licensing
+
subscribed and sworn to before me, a Notary Public in and fnr the State and County above named, this 17th day of February,1987.
3%L D. Adwm Notary Pplic
'~
Notary Public, State of Florida at Large, My Commission Expires: July 22, 1989
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION IN THE MATTER OF
)
)
DOCKET No. 50-302 FLORIDA POWER CORPORATION
)
CERTIFICATE OF SERVICE E. C.
Simpson deposes and says that the following has been served on the Designated State Representative and the Chief Executive of Citrus County, Florida, by deposit in the United States mail, addressed as follows:
- Chairman, Administrator Board of County Commissioners Radiological Health Services of Citrus County Department of Health and Citrus County Courthouse Rehabilitative Services Inverness, FL 32650 1323 Winewood Blvd.
Tallahassee, FL 32301 A copy of the revision to Technical Specification Section 3/4.8, Electrical Power Systems Bases, to Operating License No. DPR-72 (Change Request No.146).
FLORIDA POWER CORPORATION T'X?<f/77 Director, Nuc[ia Operations
- t. G. Simpson /
Engineering and Licensing 4
SWORN TO AND SUBSCRIBED BEFORE ME THIS 17TH DAY OF FEBRUARY 1987.
W Notary P/blic Notary Public, State of Florida at Large liy Connission Expires: July 22,1989 (NOTARIAL SEAL)
~
~
CONTAINMENT SYSTEMS O
CONTAINMENT AIR LOCKS LIMITING CONDITION FOR OPERATION 3.6.1.3 Each containment air lock shall be OPERABLE with:
a.
Both doors closed except when the air lock is being used for normal transit entry and exit through the containment, then at least one air lock door shall be closed, and b.
An overall air lock leakage rate of < 0.05 L at P, 49.6 psig.
a a
APPLICABILITY:
MODES 1, 2, 3 and 4.
ACTION:
With an air lock inoperable, restore the air lock to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
(h SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstratad OPERABLE:
a.
After each opening, except when the air lock is being used for I
multiple entries, then at least once per 72, hours, by verifying seal leakage < 0.01 L w seals is pressurized lo > hen the volume between the door 8 psig, for at least 30 seconds.
lear once er 6 nths b conduct' g an erall
'r lockN ea e
t at 49.
- psig, nd by v ifyin that t overa(1 lo(leikgge q is gin its limit, and N
a c.
At least once per 6 months by verifying that only one door in each air lock can be opened at a time.
" Exemption to Appendix "J of 10 CFR 50.
% (tcsans Spaj,c_},n 4,O.z c w ne f "fy'ASL s(
CRYSTAL RIVER - UNIT 3 3/4 6-5
i ATTACHMENT b.
By conducting overall air lock leakage tests at not less than Pa (49.6 psig) and verifying the overall air lock leakage rate is within its limit:
- 1..At least once per 6 months, # and i
2.
Prior to establishing CONTAINMENT INTEGRITY when maintenance has been
]
performed on the air lock that could affect the air lock sealing cap-ability.*
4 i
.i 6
I t
,,., -. ~.. _ _,.
---.u.
.3-r-
..,,m._,.._,m
.m-._,
r,,._
-.,.e-,.-_.,,
-e
. _ _ _..-., --