Text
-m m
f
_ } Commonwealth Edison 2
72 West Adams Street Chicago, Illinois Address Reply to: Post Office EFoi77 Chicago, lilinois 60690 0767 October 6, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Quad Cities Station Unit 2 Reg. Guide 1.97 Modification Schedule NRC Docket No. 50-265 Reference (a): January 31, 1986 letter from J. R.
Wojnarowski to H. R. Denton.
Dear Mr. Denton:
Reference (a) provided our schedule for implementation of Reg.
Guide 1.97 modifications at Dresden and Quad Cities. As a result of equipment procurement and delivery delays, we will be unable to complete many of the Quad Cities Unit 2 modifications during the upcoming oc Mber 1986 refeuling outage as originally planned. Attachment A provides our revised modification completion schedule. The following table summarizes our planned implementation strategy.
Modification Discussion j
Al, A2 These modifications will be initiated during the 10/86 Unit 2 outage. Since the required transmitters will not be available to support installation this outage, they will be installed and the modification completed during a dual unit outage in the Fall of 1987.
A6 This modification will be initiated during the 10/86 Unit 2 outage, with the recorder installation to be completed during unit operation (6/01/87).
15 This item will be completed on the original schedule.
32 This modification involves work in the drywell and therefore has been rescheduled to the next Unit 2 refuel outage (Spring, 1988) po )
o
\\
8610170056 861006 i
PDR ADOCK 05000265
.P PDR _ ->
r 3
0*
Mr. H. R. Denton October 6, 1986 i
i Modification Discussion 45, 46 These modifications will be initiated during the 10/86 Unit 2 outage and completed during unit operation (6/01/87).
This revised schedule represents our best efforts to complete these modifications as soon as practical, considering the currently anticipated equipment delivery dates.
If you have any questions regarding this matter', please concact this office.
One signed original and ten (10) copies of this letter and the attachment are provided for your use.
Very truly yours, y
$7r"- W J. R. Wojnarowski Nuclear Licensing Administrator 1m Attachment cc:
R. Bevan - NRR NRC Resident Inspector - Quad Cities 2213K
r-ATTACHMENT A RBG. GUIDE 1.97 MODIFICATIONS DR 3 DR 2 OC 1 OC 2 Modification Description Al - Reactor Rewire, and 9/87 12/86 9/87 End of Level recalibrate Unit 1 Fall 1987 A2 - Reactor Replace transmitters 9/87 12/86 9/87 Outage Pressure Add signal cond.
recalibrate instruments A6 - Suppression Bulk Temp.
6/86 12/86 9/87 6/01/87 Pool Water recorder added Temperature 15 - Primary Issue updated 6/86 12/86 9/87 10/86 Containment indexes and data Area Radiation sheets 32 - Drywell Replace 9/87 12/86 9/87 Spring 1988 Atmosphere temperature Refuel Temperature elements Outage 45 - RHR Hest Replace 9/87 12/86 9/87 6/01/87 Exchanger temperature Outlet Temp.
sensors 46 - Cooling Water Add / Replace Temp.
9/87 12/86 9/87 6/01/87 Temp to ESP elements Sys. Components 59 - All Other Add rad 9/87 12/86 Does Not Apply Identified detector Release Points (Noble Gas)
The above dates are based on a refueling outages schedule dated 1/10/86. These dates are subject to change, based on changes to this schedule.