ML20210U514

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-302/87-02 on 870112-16.Notice of Violation Not Issued at This Time Due to Consideration of Escalated Enforcement Actions for Violations Under Review
ML20210U514
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/10/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20210U518 List:
References
NUDOCS 8702180501
Download: ML20210U514 (2)


See also: IR 05000302/1987002

Text

_

s- ^3FGUARDS INFORMATIOM

FE8101987

-Docket No. 50-302

License No. DPR-72

Florida Power Corporation

ATTN: Mr. W. S. Wilgus

Vice President Nuclear Operations

P. O. Box 14042, M.A.C. C-2-M

St. Petersburg, FL 33733

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-302/87-02

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

O. Masnyk on January 12-16, 1987. The inspection included a review of activities

authorized for your Crystal River facility. At the conclusion of the inspection,

the findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The violations described in the enclosed inspection report are currently under

consideration for escalated enforcement action. Accordingly, no Notice of

Violation is being issued at this time, and no response to this letter is

required. However, please be advised that the number and characterization of

violations described in the enclosed inspection report may change as a result of

further NRC review. You will be advised by separate correspondence of the

results of our deliberations on this matter.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

!

Should you have any questions concerning this letter, please contact us. )

.

Sincerely,  !

kk O J. Nelson Grace

G Regional Administrator j

p tion Report h'3MCONTAINS

(Safeguards Information) t of3 p OR TI0ff

'

cc w/ enc 1: (See page 2) IS DEcoNraoI.I.ro,

WEGUARDS INFORMATION jy _q 11

4

_ _ __ - _ _ _ _ _ _ - -

, _

'

'

SAFEGUARDS INFORMATION

Florida Power Corporation 2

y .

.

cc w/ enc 1:

P. F. McKee, Director, Nuclear Plant Operations

R. C. Widell, Manager, Nuclear Operations

Licensing and Fuel Management

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

NRC Resident Inspector

Document Control Desk, 016

State of Florida

,

't

.1

R11 g 4-

Rilj R11

5 / gyn

0 yk cdg G\bs uire "

j 02j9 87 02/ $ O

/ 2//6 8702/ 7

Ril Ril -

RI

/

Dyer 3eil1 5 g st eyes

.

jg7 G'

02/ enk)/87

5 / B7 02/N/87

rt:cLoSURC CONTAIN

EAFEGUARDS WFo

UPON SEPARATION

PAGE 13 DECONTROLLLD

qAFEGUARDS INFORMATION

.-