Proposed Tech Specs,Replacing Phase Imbalance/Underpower Relay for Each Reactor Coolant Pump W/Undercurrent Relays
ML20210P513
Person / Time
Site: Rancho Seco
Issue date: 09/22/1986
From:
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20210P451 List:
References
TAC-63080, NUDOCS 8610060787
Download: ML20210P513 (2)


Text

__ _ -.. __ ____ _

1 i

'i l

t RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Table 3.5.1-1 (Continued)

INSTRUMENTS OPERATING CONDITIONS (c)

(A)

(B)

Operator Action if Functional Unit Total Number of Minimum Channels Conditions of Columns A Channels Operable and B Cannot be Met 9.

Reactor Building Purge Isolation 2

1 Operation may continue provided the purge on high radiation inlet & outlet valves of the inoperable i

channel (s) are closed & their respective breakers de-energized or comply with 3.5.1.2.

At cold shutdown or refueling, each of the purge inlet and outlet valves will be closed.

f Auxiliary feedwater 1.

Low Main feedwater Pressure:

See Section 3.5.1.2 i

I Start Motor Driven Pump and Turbine Driven Pump 2

1 150><2.

Undercurrent RCP:

Start Motor Driven and Turbine Driven Pumps 2

1 i

4 r

i Proposed Amendment No. 150 3-30a 861006d3787 8605N22 PDR ADOCK ODOCH3312 1

p POR i

RANCHO SECO UNIT 1 TECHNICAL SPECIFICATIONS Sureelliance Standards Table 4.1-1 (Continued)

INSTRUMENT SURVEILLANCE REQUIREMENTS s'

Channel Description Check Test Calibrate Remarks 42.

Reactor Building drain accumulation tank level NA NA R

43.

Incore neutron detectors M(1)

NA NA (1) Check functioning, including f unctioning of computer read-out and/or recorder reJdout.

44, a.

Process and area radt-ation neonitoring system W

M Q

b.

Containment Area Moni tors W

NA R

45.

Emergency plant radiation Instruments M(1)

NA R

(1) Battery check 46.

Environmental air monitors M(1)

NA R

(1) Check functioning 47.

Strong motion accelerometer Q(1)

NA R

(1) Battery check 48.

Auxiliary Feedwater Start Circuit 150 4 a.

Undercurrent RCP S

NA R

b.

Low Main Feedwater Pressure NA M

R 49.

Pressurizer Water Level M

NA R

50.

Auxiliary Feedwater Flow Rate M

NA R

51.

Reactor Coolant System Sub-cooling Margin Monitor M

NA R

52.

EMOV Power Position Indicator (Primary Detector)

M NA R

53.

EMOV Position Indicator (Backup Detector)

M NA R

T/C or Acoustic 54.

EMOV Block Valve Position ^

Indicator M

NA R

55.

Safety Valve Position In-dicator (Primary Detector)

M NA R

T/C 56 Safety Valve Position In-dicator (Backup Detector)

Acoustic M

NA R

Proposed Amendment No. 150 4-7b