Forwards Insp Repts 50-317/86-03 & 50-318/86-03 on 860120-0303 & Notice of Violation
ML20210E128
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/21/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20210E132 List:
References
NUDOCS 8603270211
Download: ML20210E128 (2)


See also: IR 05000317/1986003

Text

,

_ _ _ _ _ _ _ _ _ _

-

.

g,

.

MAR 211996

DOCKET / LICENSE:

50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

i

ATTN: Mr. J. A. Tiernan

{

Vice President, Nuclear Energy

i

P. O. Box 1475

Baltimore, Maryland 21203

}

Gentlemen:

Subject: NRC:RI Inspection 50-317/86-03, 50-318/86-03

j

This transmits the January 20 - March 3, 1986, resident inspection findings by

i

Messrs. T. Foley and D. Trimble at the Calvert Cliffs Nuclear ~ Power Plant, Lusby,

I

Maryland.

Those findings were based on observation of activities, interviews, ar

document reviews, which have been discussed with Mr. Lemons of your staff.

i

1

An apparent violation of NRC requirements is cited in Appendix A and categorized

!

j

under the revised NRC Enforcement Policy,10 CFR 2 Appendix C (47 FR 9987, $1 arch

(

8,1984).

This regards a failure to maintain proper administrative control over

j

the opening of a Containment isolation valve (Section 4 of this report).

Although

Section 2.201 of Part 2, Title 10, Code of Federal Regulations (10 CFR 2), requires

that you provide a written statement of explanation to this Notice of Violation,

y

i

we note that adequate corrective action was taken prior to the completion of this

j

inspection.

Therefore, no response is required.

?

,

!

In regard to your evaluation and development of a program to perform periodic non-

destructive examinations of the salt water system carbon steel piping (Section 8

,

.

of this report), we encourage you to pursue the type of program that will result

!

in early detection of wall thinning.

Such an approach would preclude potential

j

safety problems arising from through wall cracks.

Your cooperation with us is appreciated.

!

Sincerely,

i

'

.Orisiaal Signed By1

..

l

Edward C. Wenzinger, Chief

i

Projects Branch No. 3

i

DivisionofReactorProjects

i

j.

Enclosures:

j

1.

Appendix A, Notice of Violation

j

2.

NRC RI Report 50-317/86-03,50-318/86-03

c

.

1

0603270211 860321

1

PDR

ADOCK 05000317

G

PDR

gg

.

-

f

J

.

. - -

r

-

-

s.

Baltimore Gas and Electric Company

2

UANSI1986

'

cc w/encls:

M. Bowman, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

,

State of Maryland (2)

bcc w/encls:

Region I Docket Room (with concurrences)

Senior Operations Officer (w/o enclosure)

Director, DRS

Director, DRSS

DRP Section Chief

D. Jaffe, LPM, NRR

M. McBride, RI, Pilgrim

i

i

,/

( RI:DRP \\

RI f -)

RT'

)

Foley/Timble/ss/mjd

Elsps er

nzihger

3/18/86

3[zfgt

OFFICIAL RECORD COPY

l

-

-

-

-