ML20210D763
| ML20210D763 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/31/1992 |
| From: | Baron M, Miller D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CCN-92-14076, NUDOCS 9206180040 | |
| Download: ML20210D763 (14) | |
Text
-
Cht.f91 \\40%
~
A' PillLADEl.PillA ELECTitlC COMPANY fll' PIActi IlOT10M AluMIC POWIit s1ATION R D I, ihn 20M
\\*!M n#
Delu. Itntwylvania 17.414 rwas etnw.s-me tuo s s os a u a t t a w a pl?) 4 W7014 D. B. Miller. Jr.
Yke Pre, dent June 12,1992 Docket Nos. 50-277 50 278 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of h%y 1992 fonvarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely,
($
.iai, MS DBM/AAFfIJN/DRM/MJB: cmc Enclosure ec:
R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania J.J. Lyash, USNRC Senior Resident inspector R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I USNRC li.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power INPO Records Center 9pyc L s lG 1. U g
7 I 9206180040 920531 PDR ADOCK 05000277 R
PDR k
m..
.s.._.
NRC htonthly Operwtions Summary peach Ilottom Atomic Powtr Station hlay 1992 UMT2 Unit 2 began the month at nominal 100% power. On hiay 3, lead was dropped to 25% piwcr to stroke the main turbine #3 CIV, perform RIT linkage lubrication, and repair a controf rod 11CU. Unit 2 returned to full p>wer on hiny 4. Another load drop occurred on hiay 10 for a controf rod pattern adjustment and flux tilt testing. Unit 2 returned to full power within twenty.four hou6 On hiny 20, Unit 2 experienced an automatic scram when two combined intercept valves closed simultaracously during testing, causing the closure of the main turbine control valves. hiaintenance aethitics were completed on the recire pumps, the recirc ht/G sets, and the core spray system. Unit 2 returned to f:.ll power on hiny 29 and remained at that level for the rest of the month.
UNIT 3 Unit 3 began the month at nominal 1(KE but was shut down for a maintenance outage on hiay 4. The five day outage saw maintenance and repair activitics completed to the 'P moisture separator drain tank manny,1P.his, recirc M/G sets, and IICU control vahes. During the restart, both recire pumps tripp:d. Power ascension was delayed until repairs were made. Nominal 100% power was reached on hiay 17 and remaine, at that level until d
hiay 24 when a power was reduced to 82% for control rod pattern adjustment and flux tilt testing. Problems were experienced with thermallimits but repairs to a TIP machine corrected the condition and Unit 3 ended the month at 100% power.
CC692.NRC I
1 d
Docket No..%277 Attachment to hforthly Operating Itc[ ort for hiay 19/2 UNIT 2 RITUI't.1NElhLulL]AIJDE 1.
Name of facility:
Peach Ih>ttom Unit 2 2.
Scheduled date for next refueling shutdown:
lleload 9 scheduled for September 12,1W2.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for November 30,1W2.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
No.
If answer ;$ yes, what, in general, will these be?
5.
Scheduled date(s) fa submitting proposed licensing action and supporting information:
N/A o
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changu in fuel design, new operating procedures:
N/A CQ$92.NRC
Docke.t No. $0 277 Attachment to Monthly Operating Report for May 1V12 Page 2 UNIT 2 RI:FUFI,1NG INFORJ_lAll1}N (Continued) 7.
The nuruber of fuel aucmblic-i) in the core and (b) in the spent fuel storage pool:
(a)
Core 764 Fuel Aucmblics (b)
Fuel Pool.18% Fuel Ae.cmblics, $8 Puct Rods 8.
The present licensed spent fuel poo! storage capacity and the slic of any increase in licensed storage capacity that has been requested or is planned,in number of fuel auemblies:
The spent fuel pool storage capacity has been relicensed for 3319 fuct assemblics.
9.
'Ihc projected date of the last refueling that can tv discharged to the spen; fuel pool assuming the prercnt capacity:
September 2003 without full core offload capability.
September IVn with full core offload capability.
)
I h
l-CCos9W.c y
Docket No. $0 278 Attachment to Enthly Operating Report for May 1W2 UNIT 3 }tfTUEl.ING INFOR A1 ATION 1.
Name of facility:
Peach Ilottom Unit 3 2.
Scheduled date for next refueling shutdown:
~-
Reload 9 scheduled for September 4,1W3 3.
Scheduled date for restart following refueling Restart followmg refueling scheduled for October 29, IW3 4.
Will refueling or resumption of operation thereafter require a technical specification changc or other license amendment?
No if answer is yes, what, in general, will these be?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in foci design, new operating procedures:
N/A CC0592.NRC
DocLet No. 50 278 Attachment to Monthly Operating Itcport for hiny 1992 Page 2 UNIT 3 IIEFUEt,1NG INFOltM ATION (Continued) 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
Core. 764 Fuel Assemblics (b)
Fuel Pool.1M5 Fuel Assemblics,6 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the sire of any increase in licemed storage capacity that has been requested or is planned,in number of fuct anemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool auuming the present capacity:
September 2fxM without full co : offload capability.
September 1998 with full core offload capability.
3.
CO69ANRC
t e
I AVtRACE DAILY UNIT POWER LEvil i
DOCKET NO. 50 2T7 UNIT PEACM BOTTOM UNif 2 DATE JtmE 15, 1992 COMF ANY PHILADELPHI A ELICTRll COMPA=Y M. J. B ARON SUP(RV150R REPORTS CROUP P(ACM B0110M ATOMIC POWER STAfl0N f tLEP40WE (717) 456 7014 EXT. 3321 MONTH MAY 1992 DAY AVERAGE DAILY POWER LEVIL DAY AVERAGE DAILY POWER ltVEL (WWE NET)
(WWE hET) i 1057 17 1173 2
1057 18 948 3
538 19 1DA1 4
1041 20 935 5
1058 21 0
6 1D47 22 0
7 1063 23 0
8 1060 24 0
9 1051 25 0
10 1021 26 0
11 1065 77 0
12 1065 28 70 13 1059 29 792 14 1066 30 1054 15 1057
= 31 1D45 16 1057-
[
y e-y e
-w-.
ya---,g ry:r
ye,y,--
3-yr w--
~ w
?,
AvtRAGE DAILY UNif POWER tiV[L Doctfi No. 50
- 278 UNif PEACN BOTTOM UNIT 3 DAlf JUNE 15, 1992 COMPANY PN!LADELPN! A titCTRIC COMPANY M. J. BARON 6
$UPERVISDR REPORT $ GROUP PIACH BOT 10H ATOHlC POWER STAil0N i
4 TtttPHONE (717) 456 7014 Exi. 3321 MONTH MAY 1992 DAY AV(RAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER ltVEL (MWE
- NE T)
(MWE.NE T) 1 1059 17 1044 2
1059 18 1056 3
1059 19 1060 4
d61-20 1056 5
0 21 1058 6-0 22 1048 0
23 1341 8
0 24 992 9
0 25 1036 10 117 26 1051 i
.11 '
615 27
'1040 12 389 28 1046 13 174-29 1051 14 161 30 1054 tb 469 31 1053 16 03C p-
g
'1 i.
DPERAilWG DATA REPCet DOCKET Wo. 50 277 DATE JUNE 15, 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON
$UPERVISOR REPORis GROUP PEACM B0ff0M ATOMIC POWER STAfl0N TELEPHONE (717) 456 7014 EET. 3321 OPERAi!NG $fATU$
- 1. UNIT NAMEl PEACH B0ff0M UNif 2 NOTES:
- 2. REPONilNG PERl00 MAY, 1972 3.' LICENSED THERMAL POWER (MVT):'
3793
- 4. NAMEPLAff RAilNG (GRO$$ MWE):
1152 t
- 5. DESIGN ELECTRICAL RATING (WET MWE):
1D65
+
- 6. MAXIMUM DEPENDABLE CAPAClfY (GRO$$ MWE): 1098
- 7. MAXIMJM DEPENDABLE CAPAClif (WET MWE):
1055
- 8. IF CHANGES DCCUt lN CAPAClif RAftkG$ (ITEM $ NUMBER 3 THROUGH 7) SINCE LA$1 REPORT, GIVE REA&oNS:
- 9. POWER LEVEL TD kNICH RE$1RICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THl3 MONTH YR-TO-DATE CUMULAflVE
- 11. Haunt tu REPORilWG PERIOD 744 3,64 7 156,983
- 12. NUMBER OF HOUR $ REACTOR WAS CRITICAL 577.2 3,187.2 95,441.2
- 13. REACTOR RESERVE SHUTDOWN WOUR$
0.0 0.0 0.0
- 14. HOUR $ CENERATOR ON LINE 560.3 3,170.3 92,007.8
- 15. UNIT RESERVE $NUTDOWN HOUR $
0.0 0.0 0.0 i-
- 16. GROS $ THERMAL ENERGY GENERATED (MWH) 1,75t 10,198,176 272,737,905
- 17. CROS$ ELECTRICAL ENERGY GENERATED (MWH) 582,600 3,404,700 89,693,290
- 18. NET ELECTRICAL ENERGY GENERATED (MWM) 560,565 3,299,593 85,916,826 t
FACE 1 0F 2 l
-. ~. -.....
L i
~
r OPERAflWG DATA REPORT (CONilWUfD)
DOCiti NO. $0 2T7 f
DAlt JUNE 15, 1992 TMit MONTN VR 10 DAlt CUMULAllVE
- 19. UNIT $ttvict FACfD4 75.3 86.9 58.6
- 20. UNIT AVAILABILiff FAC704 T5.3 86.9
$8.6
- 21. UNif CAPACliY FACIDR (U$ING MDC NET) 71.4 85.8
$1.9
- 22. UWlf CAPACITY FAC104 (U$1NG DER Nti) 70.T 85.0
$1.4
- 23. UN!! FDRCID OUTAGE RATE 24.7 13.1 14.6 l
- 24. $HU100WW% SCHEDULED DVER NEXT 6 MONINS (ITPE, DAlt, AND DURATION OF EACH):
Refuel, 9/12/92 start, 80 days 2$. If $ NUT 00WN At (WD OF REPORT PERluo, ESTIMAf t0 DAff 0F $1ARTUPi W/A L
26.- UN11$ IN f t$T STATUS (PalDR TO COMHERCI AL OPERATION):
FORICA51 ACHitVED IWillAL CRITICAliff 09/16/73 V
INITIAL ELECTRIC!17 02/18/74 COMMERCIAL OrtRAtl0N 07/05/74 I-i PAGE 2 0F 2 ll.
l l
l l --
l
e i
OPERATING DATA REPORT r
DOCKET No. 50 278 DATE JUNE 15, 1992 COMPLETED BY PHIL ADELPHI A ELECTRIC COMPANY M. J. BARON SUPERvlSOR REPORis CROUP PEACH B0ff 0M ATOMIC Pfutt $1 Ail 0N TELEPHONE (717) 456 7014 EXf. 3371 OPERAllNQ STATUS
- 1. UN11 NAME: PEACH B0fiDM UNIT 3 NOTES:
- 2. REPORilNQ PERIODI MAT, 1992
- 3. LIPENSfD ihERMAL POWER (MWT):
3293
- 4. NAMEPLAll RAflNG (GROSS MWE):
1152
- 5. DEslGN ELECTRICAL RAilNG (NET MWE):
1D65
- 6. MAXIMUM DEPENDABLE CAPACITY (CROSS MWE): 1098 s
- 7. MAXINKM DEPENDABLE CAPACITY (NET MWE)t. 1035
.8.
IF CHANGES DCCUR IN CAPm!tif RAflNGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST RfPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTRICil0NS, IF ANY 1
THis MONTH YR*10 DATE CUMULAllVE
- 11. HOURS IW REPORilNG PERIOD 744 3, 647 152,879 12.' NUMBER OF HOURS REACTOR WAS CRITICAL 614.5 3,491.1 93,853.2
- 13. REAC10e RESERVE SHUTDOWN hours 0.0 0.0 0.0
- 14. HOURS GENERATOR DN LINE 588.0 3,288.4 90,593.4
- 15. UNIT RESERVE SHU100WN HOURS 0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY CENERATED (MWH) 1,645,584 9,874,920 265,968,850
- 17. CROSS ELECTRICAL ENERGY GENERATED (MWH) 548,300 3,294,900 87,29/,432
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 526,510 3,192,601 83,675,618 PAGE 1 0F 2
\\
i 4
4 1'
OPEkAilhG DATA REPC'T (CONilha)
DOCKE1 NO. 50 - 278 i
DATE elkE 15, 1992 l Qi THis MONTH VR 10-DATE CUMULATI'.T f
- 19. UNif SERVICE TACTOR 79.0 90.2 59.3 I.N
- 70. UNIT AVAILABILITY FACTOR 79.0
'.2 59.3 JNif CAPACITY t ACTOR (USING HDC ;> T) 68.4
.6 5?.9 P
UNIT CAPACITY F ACTOR filSING DER NET) 66.4 82.2 51.4
%% y.
g,
__. N IT rORCED OUTAGE RATE 0.0 0.4 12.3
+
'4.
$WUTDOWNS SCHEDULED OiLR hEXT 6 HONTHS (TYPE, DATE, AND DURATION OF FACH):
M. IF $slVTFWN AT END OF REPORT PERIOD, IsilMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRICQ TO COMMERCIAL OPERAY10N):
f0RECA$l AChdVED 5
INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 3
COMMEf!CIAL OPERATION 12/23/74
[
n i
i PVE 2 0F 2
\\
b k
t
..b i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 277 UNIT NAME T4 ALM BOTTOM UNIT 2 -
DATE JUNE 15, 1992 REPORT MONTH MAT, 1992 COMPLETED BY DMILADELPNIA ELECTRIC COMPANY' M. J. BARON SUPERVISOR REPORT $ GROUP PEACH BOTTOM ATOMIC POWER STAT-0N TELEPMGNE (717) 456 7014 EXT. 3321
......s.........................................................................................................
METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE
!"?". DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO h0 DATE (1).
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 7
920503 0.0 8
4 NA CD VALVEX STR0rt MAIN TURBINE #3 Civ REACTOR NOT SHUT DOWN 8
920510 0.0 B
4 NA RB CONROD R00 PATTERN ADJUSTMENT AND " tux TILTING REACTOR WAS NOT SNUTDOWN-9.
920520-F 183.7 A
3 2 92 09
- CD VALVEX TWO CIVS CLOSED SIMULTANEOUSLY CAUSING a
POWER LOAD IM8ALANCE t
183.7
( 1 ).'
(2)
(3)
(4)
'F +-FORCED REASON MCirJ EXHIBli G - INSTRUCTIONS
- S -. $CHEDULw
~A.- EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARATION OF DATA 8 MAINTENANCE OR TEST 2 MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE
- C - REFUELING.
3 - AUTCHATIC SCRAM.
EVENT REPORT (LER)
D
- REGULAT0 fly RES"14T10N 4 OTHER (EXPLAIN)
FILE (NUREG-0161)
E - OPERATOR TR/.INadG + LICENSE EXAMINATION F - ADMINISTRATivi (5)
, E - OPERA 710NAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBli ! - SAME SOURCE T
_4-t
+
I
t I_,$
r a
UNIT SHUTDOWNS AND PWER REDUCTIONS DOCKET Wo. 50 - 278 UNIT NAME PEACH BOTTCM UNIT 3 DATE JUNE 15, 1992.
REPORT MONTH MAY, 1997 COMP SY PHILADELPHIA ELCU TIC COMPANY s
M. J. BARON SUPERVISOR q
REPORTS CROUP PEACH DOTTOM ATOMIC POWER STATION TELEPHONE (TIT) 456 7014 EXT. 3321
. >.................~...................................................
METHOD OF LjLENSEE SYSTEM CCNPONENT CAUSE AND CORRECTIVE TYPE DURAfl0N REASON SHUTTING C NN EVENT CODE CODE ACTION TO NO.
DATE
-(1), (HOURS)
_ 2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE
(
i 11 920504 S
156.0 H
1 NA HJ XXXXXX MAINTENANCE OUTAGE 12 920512 F
- 0. 0 A
4 NA CB PUMPXX A AND B RECIRC PUMP TRIPPED REACTOR WAS NOT SHUT DOWN 13 920524' S
0.0 B
4 NA RB Corro FLUX TILTING REACTOP WAS NOT SMUTDOWN s
- l 156.0 (1)
(2)
(3)
(4)
F. FORCED
-EEkSON-METHOD EXHIBli G INSTRUCT!U S
$. SCHEDULED-A. EQUIPMENT FAILURE (EXPLAIN) 1. MANUAL FOR PREPARAfl0N OF DATA B - MAINTENANCC OR TEST 2. MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE
,C. REFUELING 3. AUTOMATIC SCRAM.
EVENT REP 00T (LER) 1 c'
D. RECULATORY RES.RICTION 4. OTHER (EXPLAIN)
FILE (NURCG-0161)
E
- OPERATOR TRAlWING + LICENSE EXAMINATION D*
.- F. ADMINISTRAT1VE
-(5)
G OPERAfl0NAL ERROR (EXPLAIN)
.H. OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE
)