Advises That Human Factors Engineering Branch & Science Applications Intl Plan to Conduct Dcrdr Audit on 851112-15 & 851211 Site Visit to Review Util 10CFR50,App R Exemption Request.Audit Agenda Encl
ML20209J305
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/05/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
References
NUDOCS 8511110436
Download: ML20209J305 (4)


Text

,.

November 5, 1985 DISTRIBUTION

,*; pocket File ORB #1 Rdg Docket Nos. 50-295 LPDR PDR and 50-304 Gray File H. Thompson i

OELD R. Eckenrode J. Stang E. Jordan B. Grimes J. Partlow J. Norris C. Parrish Mr. D. L. Farrar ACRS 10 Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

IN-PROGRESS AUDIT OF THE ZION GENERATING STATION DETAILED CONTROL ROOM DESIGN REVIEW AND A VISIT REGARDING EXEMPTIONS FROM 10 CFR 50, APPENDIX R The Human Factors Engineering Branch and its consultants, Science Applications International Corporation, plan to conduct an in-progress audit of the Detailed Control Room Design Review (DCRDR) of the Zion station. The purpose of the audit will be to evaluate the organization, process, and results (to date) of the DCRDR. The in-progress audit has been discussed with Mr. Peter LeBlond and is planned for November 12-15, 1985, at Zion Station. Please make the following preparations:

1.

Review team personnel (including contractors) knowledgeable in each of the DCRDR tasks should be available to discuss the review process and to respond to staff questions during the audit.

2.

Documentation of the DCRDR organization, process, and results to date should be available.

3.

Conference or office space should be available for the NRC staff's meeting with CECO and for the staff and its consultants to meet privately.

4.

Access to the control rooms, control room simulator, and remote shutdown facilities should be provided as necessary.

5.

Clearance to bring camera equipment on-site and to take photographs in the control room and other areas which would assist in evaluating the DCRDR.

The enclosure contains tentative agenda for that visit.

8511110436 851105 PDR ADOCK 05000295 F

PDR k

\\

1 Mr. D. L. Farrar November 5, 1985 In addition as a separate issue, staff intends to visit Zion Station on i

December 11, 1985, as part of the review of the request for exemptions from 10 CFR 50, Appendix R.

Further details of that visit will be furnished by the NRC Project Manager as they become available.

Sincerely, r

l

/s/JDNeigbhors for SVarga 4

Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing

Enclosure:

As stated cc:

See next page

(

ORB #1:DLO;f'.oRp, RB#1:DL CParrish y

'JNort pws arga 3

11/6/85 11/s/

}lff/85 l

J i

5 4

/

a-w

,w--

-we-

.,,-..e-,.,.

n

~.w,

+

Mr. D. L. Farrar Comonwealth Edison Company Zion Station cc:

Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor Director of Research and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza Sist Floor Chicago, Illinois 60602 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear Pegalatory Comission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137

-,,g..

ih, ENCLOSURE TENTATIVE AGENDA I

ZION GENERATING STATION, UNITS 1 AND 2 DETAILED CONTROL ROOM DESIGN REVIEW IN-PROGRESS AUDIT Tuesday, November 12,1985(PM),atEOF NRC entry briefing Administrativeprocessingforon-siteaccess(Thursday,Nov. 14,1985)

C5CopresentationonDCRDRstatus

~

Wednesday, November 13, 1985, at EOF Ceco presentation on DCRDR activities Participation of multidisciplinary review team Function and Task Analysis Operator Survey 3

Historical Review Control Room inventory Control Room Survey HED Assessment Selection of design improvements

  • Verification that improvements correct HEDs and will not cause new HEDs I

Coordination with other improvement programs Audit documentation of function and task analysis and comparison

[,

of display and control requirements with control room inventory Audit of operator survey and resulting HEDs Thursday, November 14, 1985, in plant Audit in control room of HEDs and proposed corrective actions to j

date Review remote shutdown facilities

[

Friday, November 15,1985(AM),atEOF Continue audit of documentation as necessary 4

l NRC team caucus Exit briefing I