1 NRC MONTHLY OPERATING REPORT DOCKET NO.
50-528 UNIT NAME PVyGS-J DATE OJ/05/#5 COMPLETED BY
,Ja_ Coly _1]J e TELEPHONE 50g-932-5300 Eyt _s59]
1 OPEROJJ ND_ SISJLlS
~
1.
Unit Name: P_a_1 ode _td e _liu e 1 ea t _Qe ne_ra t_i n g._S_t a_t_i_onu_Unat__1 2.
Reporting Periods Qu_ne__L186 3.
Licensed Thermal Power (MWt): 3D00 0
4.
Nameplate Rating (Gross MWe): J403 5.
Design Electrical Rating (Net MWe):
JgBJ 6.
Max arnum Dependable Capacity (Gross MWe): J303 0
7.
Maxirnum Dependable Capacity (Net MWe):
JBfl 8.
If Changes Occur In Capacity Ratinos (Items Number 3 Through 7)
Since Last Report, Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe):
_N_QN,E_ _ __ _ __ _ __
10.
Reasons For Restrictions, If Any:
Th is Month Yr.-to-Date Cumulative 11.
Hours in Reporting Period
____Z20___
___33JB____
___J3JC___
12.
Number of Hours Reactor Was Critical
____7_02_._3__
___L45 L._Q __
___L451._3__
13.
Reactor Reserve Shutdown Hours
_____Q____
_____0_ ___
Q____
14.
Hours Generat or On-Line
_ _ __6_1Q._Z _
___1_406_._Q__
__ _L4 05_ _9 _
15.
Unit Reserve Shutdown Hours
_____0____
_____Q_____
_____0___
16.
Gross Thermal Energy Generated ( MW H) 2_u4_7_quSQ4_
_qu084t338__
_Suq8_4t438 17.
Gross Electrical Energy Generated (MWH)
__8QZut0g_
_1 ulQLdOO _
_Lu1Q1_t _00 6
18.
Net Elect rical Energy Generated (MWH)
__q0 Lulq4 l uq16 u1_2_Q_
_Lu6,1_6 ut2Q 19.
Unit Service Factor
_ _ _Q3._8 5 E _
_ _ _ _ 4_2._4_8 % _
_ _ _ _4_2._4_8 E 20.
Unit Availability Factor
_ _ _Q3_._8_QE _
_ _ _ _4_2._4_8_%_ _
____42._48_E 21.
Unit Capacity Factor (Using MDC Net)
_ _ _Q 1_,_ L4_1_
____3_Q._Q6_t_
_ _ _ _3Quq6_%_
22.
Unit Capacity Factor (Using DER Net)
__,_QL._L4%_
_ _ _ _dQ._16 E _
__ _ _3 Qt,QqE 23.
Unit Forced Outage Rate
__ __6._1_5 8_
_ _ _ _ _1._0 5 E _
__ _ __4._0Q%
24.
Shut downs Scheduled Over Next 6 Montns (Type, Date, and Durat ion of Each) :
25.
If Shutdown At End of Reoort Period, Estimated Date of Startuos 26.
Units an Test Status (Prior To Comrnercial Operat ion) :
Forecast Achieved INITIAL CRITICALITY
__5/ 8D_ _
_5/2D/DD_
INITIAL ELECTRICITY
__b/p5__
_5fj0fp5_
COMMERCIAL OPERATION
_jjf85__
_2fj3/86
/$
/)' ( E 8609120028 860630 PDR ADOCK 05000528
- I R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
~~50-528
~~~~~~~~
UNIT - -_ _ -- _ - - - _5_ ~1------_---
PVNG DATE
- -- - - - _- - - _0 6_ / 8_6_ - _ -- -- -
07/ --
COMPLETED BY J_. M_.
Co-
---_l v_i l_l e TELEPHONE s-- _2 _53_0 0___-
60* 93- - -
Ext. 6593
MONTH:
June 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL i
1 241 17 791 1--------------
2 ---------- 1243 18 0
1
1g44- ----------
19 --------- 1086 3 ---
1 1
4 ----------
1235-------------
20 1 241 1
x---------------
--- - - ---- 1 2 3 6- -- -- - -- - -- -
- - - - - - - - -- 1 2 4.1 - - - - - - - - - - -
21 5
1 1
6 - - - - - - - - - - - -.5 7 7-------------
22 -------- J1944 S
7 209 23 1 186
x---------_
8 ---------- 2168 24 -----.
---zJ51 1
1 t
- - - ---_- _ x _1_8 7_ _- --_ - --
9 - _ _ - - - - - _ 1 1 _2._4 _2 25 1
10 ---------- 1246 26 --------- 1245-----
1 1
11 1 2 41 --- ------ --
27 11241 1--
12 ---------- a-_46 28 - -- - _--- -.1_1.2_3_7_ _ _ - - _ - _ _ _ _ _
1 2 1
9 13 ---------- 1236 29 -------- J1141 1 24 14 --------- J12.36 30 x--]------------
15 ---------- 1234 1
16 1 2.39..----.
1
e REFUELING INFORMATION DOCKET NO.
Q0_--q2 8_____ __ _
. y NN G S - J _ _ __
p UNIT DATE.
@]L96/95_
COMPLETED BY J.M _G9Jyijje 3
TELEPHONE 592.-932 5399_
E25z_bD91____
l.
Scheduled date for next refueling shutduwn.
03/13/87 2.
Scheduled date for restart following refueling.
04/19/87 3.
Will refueling or resumpt ion or operat ion thereaf ter require a Technical Specification change.or other license amendment?
Not Yet Determined Wh at will these be?
Not Yet Determined 4.
Scheduled date for submitt ing proposed licensing action and supporting information.
Not Yet Determined 5.
Important Licensing considerat ions atsociated with refueling,
- e. g.
n ew or dif ferent fuel design or_ supplier, unreviewed design or performance analysis methods, significant changes in fuel.
design, new operating procedures.
Not Yet Determined 6..
The number of fuel assemblies.
a)
In the core. _ __ _2 4_ L_ __ _
b)
In the spent fuel st orage pool.
______0______
7.
Licensed spent fuel storage capacity.
___j329___
Int end ed change in soent fuel storage capacity.
___ Npne___
8.
projected date of last refueling that can be discharDed to spent fuel storage pool assuming present capacity.
2002 (w/ annual reloads and full core discharge capability).
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50.-529___,,___
UNIT pyNDS-J __ __
DATE 0//05/85_____
COMPLETED BY L &_Golyi]Je o
TELEPHONE 503.-932-5300_
EBh 9593----
06/01 0000 Plant in Mode 1.
06/06 1142 Main Turbine trio due to hydraulic oil line break.
Continued operation in Mode 1.
06/07 0545 Synchroni=ed Main Generator to grid.
06/17 1549 Reactor Trip on Low DNBR during 41ST-1SF01 -
Exercise of CEAs - Entered Mode 3.
06/18 0936 Reactor Critical - Entered Mode 2.
06/10 1539 Entered Mode 1.
06/18 1804 Sy nch roni z ed Main Generator to grid.
I
\\
l i
..* ' UNIT SHUTDOWNS AND POWER ACOUCTIONS DOCKET NO.
8;n U R UNIT NAHC PVNCS-l 2
COMPLETE olville
(*
TELErlf0NC ' 4 U-6 wo Fve 6903 Hethod of Shutting Down System Component Cause & Corrective 1
Duration 2
- 3 LER 4
5 Action to No.
Date Type (isours)
Reason Reactor No.
Code Code
- Prevent Recurrence 3
6-6-86 F
0, A
N/A N/A TG PSF Main Turbine trip due to hydraulic oil line,4 break.
Repaired line break.
4 6-17-86 F
17.7 B
3*
l-86-042 Reactor trip'due to surveillance testing of CEA's.
1 l
i l
a s
1 2
3 is F Forced Reason:
Method:
Exhibit F - Instructions S-Scheduled A-[ouipment failuro (Expl sin) 1-Hanpal for rrnparation or Data D-ttaintenance or Test 2-Hanual Scram.
Entry Sficets for Licensee C-Rerueling 3-Automa tic Scram, tvent Report (LER) File D-Regulatory Restriction as-con t i nua t ion f rom-(NUREG 0161)
E-operator f raining h I.lconse Examination Previous Month T-Admin i s t ra t ive 5-Reduction or 20%
5 C-Ope ra t iona l Error (Explain) or creator in the Exhibit H-Same Source H-Other (Explain) 9-other (Explain) l'ast 2ss stours i.
son..
t
+
6 Arizona Nuclear Power Project P.o. box 52034
- PHOENIX, ARIZONA 85072-2034 b, June 115,1986 ANPP-37404-JGH/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission k'ashington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN 50-528 (License NPF-41)
June Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the June, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwardin8 a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yours, T. C). nap J. G. Haynes Vice President Nuclear Production JGH/PGN/rw Attachment cc:
J. B. Fbrtin (all w/a)
R. P. Zimmerman E. A. Licitra A. C. Gehr E. E. Van Brunt, Jr.
INPO Records Center
'\\\\