Requests Rev to 860509 Response to IE Bulletin 85-003, Monitor Operated Valves Common Mode Failures During Plant Transients Due to Improper Switch Settings. Detailed Description of Program for Switch Setting & Maint Requested
ML20209D234
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/29/1986
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
References
IEB-85-003, IEB-85-3, NUDOCS 8609090242
Download: ML20209D234 (2)


Text

4 2 9 AUG 1986 Docket Nos. 50-387 50-388 Pennsylvania Power & Light Company ATTN: Mr. H. W. Keiser Vice President Nuclear Operations 2 North Ninth Street Allentown, Pennsylvania 18101 Gentlemen:

Subject:

Revised Response to IE Bulletin 85-03 IE Bulletin 85-03, Motor Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, November 15, 1985, requested a response concerning each licensee's program for selecting, setting and main-taining the switches of the motor operated valves in the high pressure coolant injection / core spray and emergency feedwater systems.

Your response, letter PLA-2632 dated May 9, 1986, although indicating that a program to accomplish items (b) through (d) of the bulletin exists, did not supply the program as requested. Accordingly, please submit a revision to your response to IE Bulletin 85-03 which includes a detailed description of your facility's program for selecting, setting and maintaining the switches on.the motor operated valves identified in item (a) of the bulletin.

Please provide your revised response within thirty days of receipt of this letter.

Should you have any questions concerning this letter, please contact Larry Doerflein of my staff at 215-3?7-5132.

Sincerely ,

ln)Cb 0%

William F. Kane, Director Division of Reactor Projects OFFICIAL RECORD COPY 338DOERFLEIN8/19/86 - 0001.0.0 8609090242 860829 PDR ADOCK 05000387 O PDR f ,y _ ~ , g

.=~- n ,

i 2

2 9 AUG 1986 l CC', -Pia A. R. Sabol, Manager, Nuclear Quality Assurance W. E. Barberich, Manager, Nuclear Licensing T. M. Crimmins, Superintendent of Plant-SSES

~A. J. Pietrofitta, General Manager, Power Production Engineering and Construction Atlantic Electric R. J. Benich, Services Project Manager, General Electric Company B. D. Kenyon, Senior Vice President-Nuclear Bryan A. Snapp, Esquire, Assistar:t Corporate Counsel William Matson, Allegheny Electric Cooperative Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief Robert J. Bores, DRSS R. Kiessel, IE E. Jordan, IE SI:DRP Doerflein RI:DRP Strosnider RP Kister h

ie 8/4/8o 8/15 /86 8 @ 86 8/17/86 0FFICIAL RECORD COPY 33800ERFLEIN8/19/86 - 0002.0.0 08/22/86